Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Increased Production Through Improved Spare Parts AvailabilityBy Robert Lamarre
In today?s environment, the availability of production equipment is a must to increase throughput and profits. For a number of mining organizations around the world, spare parts availability is key to
Aug 1, 2013
-
Increased Productivity by Condition-Based Maintenance Using Wireless Strain Measurement SystemBy Chris V. Sellathamby
Condition-based maintenance is replacing preventive maintenance in many industrial operations as a result of gains in productivity. Preventive maintenance is strictly time-based which means that as lo
Oct 1, 2010
-
Increased Productivity with Performance Monitoring of the Key Technological Indicators for Power Shovels and Dragline by Means of Electric DriveBy A. L. Karyakin
The report focuses on the process measurements of the mass of rock in the bucket power shovels and dragline excavators. The mathematical models are suggested of AC and DC electric drives of excavators
Aug 1, 2013
-
Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill FeedBy A. Allaire
The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to
Jan 1, 2012
-
Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed (bad27958-8860-46a5-8ff9-5edadd1fb4dd)By D. Runnels, A. Allaire, J. Fournier, Y. Sylvestre, F. Robichaud
The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to
Jan 1, 2012
-
Increased ZnS Flotation Response Due to Slime Removal with Methanol TreatmentBy E. V. Manlapig, M. A. Hampton, M. E. Holuszko
Methanol treatment of ZnS particles has been found to remove slimes and facilitate flotation. The removal of slimes renders the ZnS surface more hydrophobic, resulting in an increase in the hydrophobi
Jan 1, 2009
-
Increasing Anode Thickness to Optimise Copper Production at the Kidd Metallurgical SiteBy M. R. Coffin
In recent years, improved operation of the Kidd smelter has resulted in an increase in blister production capacity. Due to manpower and equipment limitations anode production and treatment rates could
Jan 1, 2007
-
Increasing Availability through Advanced Gearless Drive TechnologyBy C. Dirscherl, M. Combes
"Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy
Jan 1, 2014
-
Increasing Capacity and Productivity in the Metals Markets through Pneumatic Conveying and Process Injection TechnologiesBy M. E. Coleman, G. Money
Pneumatic Conveying and Process Injection Technologies have been implemented in the metals markets for the last 40 years and have considerably improved the productivity and the performance of many pro
Jan 1, 2008
-
Increasing Capacity of Nickel Product at Niihama Nickel RefineryBy H. Sato, Y. Sato, T. Ooishi, K. Sakamoto
"Sumitomo Metal Mining Co., Ltd.(SMM)'s Niihama Nickel Refinery(NNR) produces high quality Nickel cathode, Cobaltcathode and other by-products using hydrometallurgical refining process called “MCLE”(M
Jan 1, 2017
-
Increasing Cezinc's Magnesium Bleed CapacityBy E. Benguerel, G. Monteith, L. Centomo, S. Pelletier
In early 2007, it became apparent that with changing concentrate feeds, the magnesium (Mg) load projected for CEZinc starting in 2009 and beyond would quadruple and overwhelm the current Mg process bl
Jan 1, 2008
-
Increasing Competitiveness In The Atlantic Copper Metallurgical ComplexBy J. Contreras
In the period 2003-2004, the situation of the copper concentrate market was unfavourable for smelters and refineries, with low TC/RC values and euro-dollar parity affecting European companies negative
Jan 1, 2007
-
Increasing Copper Recovery at Hudbay Minerals’ Flin Flon Concentrator OperationBy T. Boyd, K. McTaggart, J. Qiu
"Hudbay Minerals’ Flin Flon process plant produces a copper concentrate and zinc concentrate from the three ores it processes: 777, Reed and Lalor. Unlike many Cu-Zn ores, the average Zn: Cu ratio in
Jan 1, 2019
-
Increasing Metallurgical Performance: RtPM ExamplesBy Osvaldo A. Bascur
Business Challenges ? Many Versions of the Truth ? Lack of Enterprise Visibility (Transparency) ? Limited Communication & Collaboration ? Complex Implementation & Maintenance of software ? End us
May 1, 2004
-
Increasing Paste and Hydraulic Backfilling Efficiency Through InstrumentationBy B. D. Thompson
Many mines adopt necessarily conservative backfilling strategies due to a lack of understanding of their backfill behaviour. In the past five years, extensive instrumentation campaigns have focused on
Aug 1, 2013
-
Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing CircuitBy Dave Rose, David G. Meadows, Mike Westendorf
"Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a
Jan 1, 2016
-
Increasing Technology Indexes of Benefication of Copper SlagBy S. Mamonov, V. ?shikhin
"The purpose of work was the significant increase of copper recovery from slag at a concentrating plant. Analysis of study of slag phase composition showed the perspective of a slow slag cooling metho
Jan 1, 2016
-
Increasing the Capacity of Existing and New Exothermic Autoclave CircuitsBy G. M. Dunn
Pressure leach autoclave circuits are employed in the leaching of ores, concentrates, mattes, alloys and intermediates for the recovery of metals into solution. Once the metals are extracted into solu
Jan 1, 2004
-
Incremental Process Improvements at the Pogo MillBy J. Sliwinski, H. Kikutani, J. Atwood, D. Larimer, J. Pyecha
"The Pogo mine start-up milling targets of 2005 are vastly different than the targets of today. Improvements have been driven by unintentional design oversight, continual circuit optimization or optim
Jan 1, 2017
-
Incremental Scale Up of IsasmeltTM - The Key to its SuccessBy P. S. Arthur, G. R. F. Alvear
Development of a new smelting process is risky. Many novel processes in the metals industry failed to fulfil the initial expectations of their inventors. Large sums of capital have been invested in te
Jan 1, 2011