The Paracatu Expansion Project III ? Building the Largest Gold Concentrator of the WorldBy Luis A. Tondo
The Paracatu Expansion Project III in Brazil was implemented between 2006 and 2008 to increase the existing capacity from 20 to 61 Million tons per year of gold ore treatment. This expansion led the B
May 1, 2009
-
Stockpiling And Reclaiming Systems In Mill DesignBy Michael J. Miller
In the design of a modem mill, a stockpile storage system for raw and/or semi-processed ore has become almost indispensable. This paper discusses the benefits of such stockpile storage as well as the
Jan 1, 1979
-
Comparison of Uranium Solvent Extraction Strip OptionsBy Deon van Tonder, Chuck Edwards
"Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco
Jan 1, 2013
-
Plant and Method of Manufacture of Portland Cement at Limestone IslandWITH the exception of the deposits of the Milburn Cement Co near Dunedin, Wilson's Portland Cement Co., on the Mahurangi River (a short distance north of Auckland), and those of the New Zealand P
Jan 1, 1912
-
A Novel, Web-Driven Continuous Mining SimulatorBy M. Karmis
The algorithms for the mathematical modeling to predict productivity of underground room-and-pillar mining systems are well known and documented. These algorithms consider the time-varying relationsh
Jan 1, 2001
-
Seismic Method Tested in Illinois Fluorspar DistrictBy Robert B. Johnson
The refraction seismic method has been used as an indirect means of exploring for fluorspar in southern Illinois by the Illinois State Geological Survey. Use of the method has been restricted to those
Jan 1, 1964
-
Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load TestingBy Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
-
Recreating a Headwater Stream System on a Head-of-Hollow FillBy C. T. Agouridis
Head-of-hollow fills or valley fills have gained national attention due to increasing environmental concerns, particularly with regards to headwater stream loss. Researchers at the University of Kent
Jan 1, 2008
-
IC 6030 Rock Dusting in Coal MinesBy D. Harrington, G. S. Rice, R. R. Sayers
"The Bureau of Mines in Serial No. 2606,4 issued in May, 1924, gave tentative specifications for rock-dusting to prevent coal-dust explosions in mines. Subsequently, a sectional committee of the Ameri
Mar 1, 1927
-
Sulphur Behaviour In Ferromanganese SmeltingBy H. Saridikmen, C. S. Kucukkaragoz
In the present study, the measurement of sulphur distribution ratios between the slag and metal phases encountered in the ferromanganese smelting has been carried out at 0.83 atm of partial pressure o
Jan 1, 2007
-
Desenvolvimento De Metodologia Para Previsão Da Eficiência De Desfosforação De Aço Utilizando A Termodinâmica ComputacionalBy Fernando Dellacqua Cristo
Durante o processo de desfosforação, as principais fases sólidas formadas na escória são o silicato dicálcico (2CaO.SiO2) e tricálcio (3CaO.SiO2), o fosfato tricálcico (3CaO.P2O5), e o 3CaOSiO2.3CaOP2
Aug 16, 2017
-
Risk Analysis in Open Pit Mine Design and Planning Using Conditional Simulation TechniquesBy Luis Alberto Martinez Tipe
The paper show how the inclusion of the uncertainty of the geology of the orebody into the mine planning and design process can be of great help, for the mine planner, in both assessing and quantifyin
Sep 12, 2005
-
OFR-84(4)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume IV - Roof SupportBy C. B. Manula
This report is volume 4 of at. eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mo
Jan 1, 1974
-
Continuous SAG Volumetric Charge MeasurementBy Andre Vien, Jean-François Dupont
"Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p
Jan 1, 2001
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
Perceived And Realized Benefits Of Paste And Thickened Tailings For Surface Deposition ? SynopsisInterest in the potential use of high-density, thickened tailings has recently increased significantly. Reasons for considering this new technology vary across projects, but commonly include the need
Jan 1, 2012
-
Implementation Of Extra Low Profile (XLP) Mechanized Equipment In Anglo PlatinumBy G. A. Harrison
The introduction of extra low profile (XLP) mechanized equipment within Anglo Platinum is aligned with the overall New Mining Technologies strategy to focus on continuing modernization of our mining o
Jan 1, 2006
-
RI 4336 Zinc Smelting In The Horizontal Retort Fired With Natural Gas 4. Burner DesignBy G. L. Oldright
As a rule, the usual zinc retort smelter fired with natural gas made its own burners, of which there might be 300 per block, out of standard pipe fit-tings. The gas was discharged through a feeder pip
Jan 1, 1948
-
Evaluation of a Versatic 10 Acid/Nicksyn? Synergistic System for the Recovery of Nickel and Cobalt From a Typical Lateritic Leach LiquorBy A. C. du Preez
Mintek has been involved in extensive test work since the early 1990s on the recovery of nickel and cobalt from leach liquors saturated in calcium, using synergistic solvent extraction systems. During
Jan 1, 2014
-
Forecasting Drill Bit Consumption In Surface Drilling And Blasting OperationsBy J. L. Hoover
The goal of the drill bit consumption study was to develop an equation(s) based on various components that affect bit drill wear and use the equation(s) to estimate the consumption of bits during prod
Jan 1, 2012