Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
MLA 25-85 - Mineral Resources Of The Mt. Stirling Wilderness Study Area (BLM No. 050-0401), Nye And Clark Counties, NevadaBy Martin D. Conyac
A 1984 Bureau of Mines investigation identified ho mineral resources in the Wilderness Study Area (WSA). However, four prospects in the WSA contain anomalous amounts of copper and silver minerals; one
Jan 1, 1985
-
Sampling, monitoring and source tracking of dioxins in the environment of an incinerator in the NetherlandsBy K H. Esbensen, A Arkenbout
In the north of the Netherlands, in the environment of Harlingen, an industrial waste incinerator was installed in 2011. The population in the region is concerned about adverse health effects related
May 9, 2017
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
Real Options: A Tool For Managing Technical Risk In A Mine PlanBy J. A. Botín
NPV is a static measure of project value which does not discriminate between levels of internal and external risk in project valuation. Due to current investment project?s characteristics, a much more
Jan 1, 2012
-
Ground Freezing A Proven Technology In Mine Shaft SinkingBy Paul C. Schmall
The link between artificial ground freezing and the mining industry stretches back more than 140 years, and across an ocean. Patented by the German scientist F.H. Poetsch in 1863, the technique is re
Jan 1, 2007
-
Coal Pillar Life Prediction in the Vaal Basin, South AfricaBy J. Nielen van der Merwe
This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri
Jan 1, 1998
-
A Chance-Constrained Programming Approach For Open Pit Long-Term Production Scheduling In Stochastic EnvironmentsBy J. Golamnejad
This paper attempts to model long-term production scheduling problems by chance constrained binary integer programming in a stochastic environment. This stochastic model is set up to account for ore b
Jan 1, 2006
-
High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble MillsBy John A. Herbst, Alexander Potapov, Xiangjun Qiu
"High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB
Jan 1, 2003
-
The challenge of building local capacity to support the development of a sustainable mining industry in emerging mining nations ? SynopsisBy C. L. Reichardt
Mining companies are increasingly looking to the developing world for the next generation of mining projects, often in countries that have little or no previous history of large-scale mining. One of t
Jan 1, 2009
-
Geoscience input into blasting operations – let’s set a new standardBy T N. Little
The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need
Sep 20, 2017
-
Wash Water Optimization on an Iron Ore Spiral"Gravity concentration remains the main separation method for fine iron ore and is used extensively for treating various minerals. Gravity concentration methods separate minerals of different specific
Jan 1, 2015
-
Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?By Kerry Spickelmier
The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with
Jan 1, 1993
-
High-wall Control at Anglo Gold Ashanti, Navachab MineBy Charles Pretorius, Henk Ludik
Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting
Jan 1, 2006
-
Cresson Mine Completes Two-Year ExpansionBy William R. Yernberg
The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini
Jan 1, 2002
-
IC 9338 Availability Of Platinum And Platinum-Group MetalsBy Catharine T. Fogg
The U.S. Bureau of Mines investigated the availability of platinum, palladium, and rhodium from 16 deposits in four market economy countries (MEC's). Major recoverable products include 164 Moz of
Jan 1, 1993
-
Status of Repairs on Two Grinding Mills At Holt-McDermottBy Pierre Beaudoin
"This paper deals with the repairs made on two damaged mills. It investigates briefly the causes of the damage, explain its nature and the design of the repair. It explains the detrimental effect on o
Jan 1, 2001
-
Analytic Approach For Sizing Feeders And Gathering Belts In Mines Using Discrete-Vehicle Face HaulageBy J. C. Yingling
[New stochastic process models are developed to calculate the probability of various fill levels in section feeders as a function of vehicle interarrival times, payloads and feeder-discharge rates. Th
Jan 1, 1997
-
Recent Advancements In Slurry Shield TunnelingBy Yoshihiro Kawarabata
INTRODUCTION With only about 30% of Japan's entire population served by sewer systems at the end of 1980, extensive sewerage construction programs have been implemented. As major sewer network
Jan 1, 1983
-
Industrial Evolution From Micro to Macro EngineeringBy Richard R. Klimpel
During the last 28 years, I have had the very challenging and rewarding experience of working as an engineering professional in a large multinational company, both as a manager of engineers and engine
Jan 1, 1993
-
OFR-116-81 Tape Recording And Triggering SystemsBy Kenneth R. Sites
Under this program two tape recording and triggering systems were developed and delivered for use in the Bureau of Mines microseismic program. The systems are designed to improve the effectiveness of
Jan 1, 1980