Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001
-
Reservoir Engineering – General - Aquifer Behavior with InjectionBy E. J. Bonet, P. B. Crawford
It is fairly common practice to reinject water into the aquifer near the oil-water interface in water-drive reservoirs. There have been many studies of aquifer behavior without reinjection,l-5 but
Jan 1, 1970
-
Modelamiento Matemático de Circuitos de ComminuciónBy Henry J. Walqui
En las centrales termoeléctricas alimentadas con carbón, las emisiones de gas están gobernadas por tres factores en los combustibles, donde el tamaño de particulas afecta directamente la temperatura d
Aug 25, 2002
-
Developing Breakthrough Solutions to Complex Metallurgical ProblemsBy B. K. Gorain
"Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne
Jan 1, 2015
-
A Method for the Rapid Determination of Uranium in Acid Leach Liquors Using Liquid Scintillation CountingBy Madgwick J. C, Ralph B. J
A method for the determination of microgram quantities of uranium in leachates from low grade uranium ores is described. Solubilized manium is purified by transfer to an organic solvent by a selective
Jan 1, 1978
-
Tellurium Resources In New MexicoTellurium (Te) is one of the least abundant elements in the crust and tends to form minerals associated with copper, lead, zinc and iron sulfide deposits. Today, most tellurium production comes from t
Feb 27, 2013
-
IC 9218 Bureau Of Mines Geotechnical Centrifuge Research - A ReviewBy Paul C. McWilliams
The U.S. Bureau of Mines has, primarily through its contract program, used large-scale centrifuges to determine design criteria for tailing embankments. The centrifuge runs were made at two installati
Jan 1, 1989
-
-
RI 3502 Time Study Analyses Progress Report No. 3 - Quarry Drilling ? IntroductionBy J. R. Thoenen
In the summer of 1937 the authors began a series of time studies of the various processes employed in' the production of crashed stone. These studies, made at quarries situated in the eastern and
Jan 1, 1940
-
Effect Of Residual Tectonic Stresses On Roadway Stability In An Underground Coal MineBy B. Unver
Effective strata control is a prerequisite for maintaining an efficient mining operation. If the strata in the vicinity of an opening are not controlled effectively, it is impossible to perform a safe
Jan 1, 1999
-
25 Years of Base Metal ProcessingBy H. P. Jacobi
"The last 25 years have seen tremendous economic pressure placed upon the base metal processor. Industry has responded with technological innovations that have contributed to significant reductions in
Jan 1, 1987
-
Evaluation Of Elastic Deformation Energy In Stone Cutting Of Portuguese Marbles With A Diamond Saw ? Synopsis (1ffa6408-4007-4d02-91f4-3113bfc2ffa0)By P. Falcão Neves
A detailed analysis of the geomechanical behaviour in rock cutting with a diamond saw is provided to obtain a better understanding of the mechanisms involved in the process. The energy of elastic defo
Jan 1, 2012
-
RI 7065 Piezoelectric Pulsing Equipment For Shear Wave Velocity Measurements In Rock SamplesBy Francis X. Cannaday
Equipment and techniques were developed with Bureau of Mines facilities for measurement in the laboratory of sonic shear wave velocity in variously shaped rock specimens in a wide range of sizes. A va
Jan 1, 1968
-
An Evaluation Of The Strength Of Slender PillarsPillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho
Jan 1, 2006
-
Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous MinerBy Sanjay Kumar Singh
The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas
Jan 1, 2012
-
Longwall Automation ù An ACARP Landmark ProjectBy P Lever, D Hainsworth, H Gurgenci
The ACARP Landmark initiative has created the opportunity to advance the level of automation in the coal industry by first focusing on the core production area of longwall mining. A Landmark Longwall
Jan 1, 2002
-
Maximização Do Desaguamento Dos Resíduos Minerais Gerados Pela Concentração Do Minério De FerroBy Gil Ribeiro Vilela Neto
Na busca por se tornar cada vez mais sustentável, a indústria mineral vem recorrendo às soluções tecnológicas que minimizem o impacto ambiental gerado pela disposição dos rejeitos resultantes dos proc
Aug 16, 2017
-
Metodologia Para Avaliar As Propriedades De Coqueificação Do Carvão – Box TestBy José Eustáquio da Silva
Este trabalho mostra a versatilidade e praticidade do uso da metodologia denominada “Método e Aparelho para Avaliar as Propriedades de Coqueificação do Carvão”, metodologia esta desenvolvida e patente
Aug 17, 2017
-
IC 8285 Water Use In The Mineral Industry - With Appendix On The Projection Of Crude Material To 1985 By Barbara S. LloydBy Alvin Kaufman
To aid industry and Government in planning water developments the Bureau of Mines in 1963 canvassed mineral producers to determine water use in 1962. Water use by the mineral industry comprises on
Jan 1, 1966
-
Commissioning of the Barrytown Ilmenite Pilot PlantBy T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990