Search Documents

  • AUSIMM
    The Geology of the Golden Cross Orebody - Complex Veining and Evolving Mining Responses

    By W C. Cook, S J. Mathews, A H. Purvis

    The Golden Cross Gold Mine is located at the head of the Waite kauri Ri ver, 8 km northwest of Waihi near the southern end of the Coromandel Range. The mine produces gold and silver from epithermal ve

    Jan 1, 1993

  • SME
    Kenya- A New Source Of Titanium Minerals

    By J. C. Potvin

    Although the occurrence of deposits of titanium minerals on Kenya’s present day beaches and adjacent dune systems has been well documented, the potential for older formations to host economically viab

    Jan 1, 2001

  • NIOSH
    OFR-100(2)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume II Of III - Methods Of Data Acquisition

    VOLUME II Volume II, in conjunction with Volume I, is a general guide to the selection of cost-effective methods of site data acquisition in all geologic environmental, and socio-political circums

    Jan 1, 1976

  • NIOSH
    IC 8068 Mining And Milling Methods And Costs, Vermont Asbestos Mines, The Ruberoid Co., Hyde Park, Vt. ? Introduction And Summary

    By H. L. Burmeister

    This is one of a series of publications by the Bureau of Mines dealing with mining methods and costs at representative operations in the United States. The report describes all phases of the mining me

    Jan 1, 1962

  • SAIMM
    Optimization of the Cycle Time to Increase Productivity at Ruashi Mining

    By H. Thomas, I. N. M. Nday

    "*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj

    Jul 1, 2019

  • AUSIMM
    Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result

    By J Belke

    Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and

    Jan 1, 2004

  • NIOSH
    IC 8325 Evaluation Of Domestic Reserves And Potential Sources Of Ores Containing Copper, Lead, Zinc, And Associated Metals

    By F. D. Everett

    This report summarizes the results of a nationwide investigation completed in 1964 to determine the nonferrous base metal ore reserves and potential sources of ore and to evaluate criteria for their u

    Jan 1, 1967

  • ABM
    Estudo Dos Parâmetros De Processo E Evolução Microestrutural Na Laminação De Tiras A Quente Via Simulação Computacional

    By Antonio Lourenço Batista de Souza

    Neste trabalho, foi desenvolvido um modelo de elementos finitos para simular o primeiro passe da laminação de tiras a quente de aços C-Mn, durante a etapa de acabamento, via DEFORMTM3D. As dimensões e

    Aug 16, 2017

  • ABM
    Avaliação E Comparação Umidade De Coque Altoforno

    By Henrique Severiano de Jesus

    Para uma marcha estável do Alto-Forno é necessário o controle de inúmeras variáveis de sua matéria prima, no nosso caso a discussão é o Coque, elemento resultante de um processo Pirolítico do Carvão m

    Aug 17, 2017

  • CIM
    Operational Data and Maintenance Reliability

    By Justin S. Johnsen

    As OEM sensors and interfaces have grown in number, the available data from equipment in the mining environment has continued to multiply. This equates to an increased visibility of operating performa

    Nov 1, 2011

  • NIOSH
    RI 7141 Entrained-Bed Carbonization Of Highly Fluid Bituminous Coals

    By Manuel Gomez

    Bituminous coals having maximum fluidity values in the 40- to 25,400-dial-divisions-per-minute (ddpm) range were carbonized in a continuous, entrained-bed reactor. Carbonization was conducted in an 8-

    Jan 1, 1968

  • ISEE
    Running a Drill Program that Supports the Mission of Blasting

    By William D. Hissem

    While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.

    Jan 1, 1997

  • RMCMI
    A Few of the Adverse Conditions Encountered in Mining Coal in the Utah Field

    By J. B. Forrester

    In the operation of the coal mines in Utah few adverse conditions confront us. Physical conditions for the economical extraction of the coal are as near perfect as it is possible for them to be. Still

    Jan 1, 1921

  • AUSIMM
    Penetration Speed References for the Drillability of Rocks

    From time to time efforts have been made to classify rocks according to their hardness, toughness and abrasiveness, and to use these classifications to provide an indication of the ease or difficulty

    Jan 1, 1950

  • NIOSH
    OFR-195(1)-83 Evaluation Of Safety Assessment Methods For The Mining Industry - Vol. I

    By P. M. Daling

    This report, sponsored by the U.S. Bureau of mines, presents the results of an examination of available safety assessment methods and their applicability to the mining industry. Standard safety analys

    Jan 1, 1983

  • NIOSH
    RI 7807 Continuous Monitoring Of Coal By A Neutron Moisture Meter

    By A. W. Hall

    A nuclear method was developed for continuously and automatically deter-mining the moisture content of coal flowing through a bin. Fast neutrons from a 1 curie americium-beryllium source penetrate the

    Jan 1, 1973

  • NIOSH
    OFR-22-87 Conceptual Investigation Of A Management Information System For Underground Coal Mines

    By J. L. Kohler

    This final report on Bureau of Mines Contract J0348005 presents the results of an investigation into the development of a Management Information System (MIS) for underground coal mines. The motivation

    Jan 1, 1986

  • AUSIMM
    3.26 GA Black Smoker-Type Textures and Setting of VMS Mineralisation in the Pilbara Craton, Western Australia: Ancient Analogues of Modern Pacific-Rim Processes

    By R Kerrich

    Early-Archaean (3.26 Ga) volcanogenic massive sulphide (VMS) deposits located within the low strain and sub-prehnite-pumpellyite metamorphic-grade Strelley greenstone belt, East Pilbara, Western Austr

    Jan 1, 1995

  • NIOSH
    OFR-70-81 Evaluation Of The Environmental Factors Involved In Metallurgical Processes To Utilize Domestic Resources For Production Of Alumina - Environmental Aspects Of Preliminary Pilot-Plant Design

    By T. Bertke

    This document assesses the environmental aspects of a preliminary design for processing kaolin clay as the domestic resource for recovery of alumina by a hydrochloric acid leach-HCl gas induced crysta

    Jan 1, 1980

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004