Karouni Gold Project from Drill Core to CommissioningBy K Nilsson, D Connelly
Troy Resources acquired the Karouni Gold Project in Guyana, South America in 2014 and immediately proceeded to a Pre-Feasibility Study and project implementation. The study considered two open pit min
Sep 7, 2015
-
EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City ProjectBy Hiroshi Yamazaki
The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass
-
Comparação Da Resistência A Oxidação De Arames Galvanizados Por Imersão A Quente Aplicando Diferentes Camadas De Conversão A Base De CromoBy João Vitor Mokan
O presente trabalho avalia o efeito das camadas de conversão a base de CrVI e CrIII aplicadas na superfície de arames galvanizados por imersão a quente. As bitolas testadas foram 1,24mm, 1,65mm e 3,00
Oct 30, 2017
-
Developments in at-Face/in-Pit Processing TechnologiesBy Martin Stoklossa
Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho
May 1, 2008
-
Mining in CubaBy Louis W. Cope
Since its discovery, Cuba has been called the “Pearl of the Antilles.” The country remains that, albeit a little tarnished these days. In Havana, many of the buildings are being refurbished, while s
Jan 1, 2003
-
Nanoparticle Flotation Aids for Pentlandite FinesBy Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton, Carla Abarca
"Fine mineral particles are difficult to process by flotation because of their low collision efficiencies with air bubbles. Decreasing air bubble size and increasing mineral particle size through floc
Jan 1, 2015
-
VentilationBy Christopher J. Bise
INTRODUCTION Traditionally, the purpose of mine ventilation has been defined as diluting, rendering harmless, and sweeping away hazardous gases which may accumulate in the mine workings. In additi
Jan 1, 1986
-
Estabilidad en tajos abiertosBy M. J. O'Hara
El diseño de taludes económicos y estables es una técnica que se aplica en el minado superficial que va desde la exploración hasta el final de las operaciones de extracción y reforestación. Las especi
Jan 1, 1972
-
The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDRBy A Hoyle, P Walker, D Bennett
The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent
Sep 7, 2015
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous ProcessBy J. O. Marsden
Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f
Jan 1, 2007
-
A comparison of models for the recovery of minerals in a UG2 platinum ore by batch flotationBy B. K. Loveday, N. V. Ramlall
A study was carried out to evaluate various batch flotation models for the recovery of minerals in a UG2 platinum ore. The major minerals in a UG2ore can be grouped as platinum group minerals, chromit
Jan 1, 2015
-
The Ilmenite Deposits of Geographe Bay (52a1d3f6-e0d1-49d1-80ea-8b175768f1f1)The southern portion of the Swan Coastal Plain, a geomorphological element formed since late Tertiary times, contains commercially exploitable accumulations of ilmenite, zircon, rutile and monazite as
Jan 1, 1964
-
Was that Locked Cycle Test Any Good?By Mike Ounpuu
"Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo
Jan 1, 2001
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Mining Matters At National Western Mining ConferenceWith unprecedented worldwide growth and increasing global demand for energy expected to swell by 60 per-cent in the next two decades, mining matters as much now, if not more, than it ever has. This w
Jan 1, 2008
-
Avaliação Da Resistência Ao Impacto Charpy De Compósitos Epoxídicos Reforçados Com Manta Híbrida De Malva E JutaBy Janaina da Silva Vieira
Fibras lignocelulósicas vem se tornando alvo de cada vez mais estudos que visam ampliar o aspecto de suas aplicações. Uma de suas aplicações mais importantes é como reforço de compósitos poliméricos n
Oct 30, 2017
-
RI 4932 Nonmetallic Deposits Accessible To the Alaska Railroad as Possible Sources of Raw Materials for the Construction IndustryBy F. A. Rutledge, J. J. Mulligan, W. H. Kems, R. L. Thome
"As a part of the United States Department of the Interior program for the development and use of Alaska raw materials, the Bureau of Mines is conducting an investigation of deposits f nonmetallic min
Mar 1, 1953
-
Structural Controls on Hydrothermal Gold Mineralisation Above the Hyde-Macraes Shear Zone, Golden Bar Pit, Macraes, East OtagoBy D Craw, R Norris
The Golden Bar pit is part of the Macraes mine, the largest gold mine in New Zealand. The Macraes mine is mainly developed in the late metamorphic Hyde-Macraes Shear Zone. However, the Golden Bar pit
Jan 1, 2006
-
The Design, Commissioning and Operation of the Golden Giant Paste Backfill PlantBy Jim Dodd, Jim Paynter
"We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi
Jan 1, 1997
-
Mining Methods in the Waihi Mine, N.Z.By Johnston W. H
MINING operations in the Waihi mine began, under the present proprietorship in the year 1889. Previous to this, and as far back as the year 1880, the presence of reefs in the Martha Hill had been know
Jan 1, 1912