Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Learning Our Geotechnical Limits and Pushing Our Longwalls Through Them

    By Richard N. Campbell

    The world?s ever-expanding demand for energy and coking coals has resulted in the underground mining industry looking at taking on increasingly marginal and geotechnically challenging deposits. The dr

    Jan 1, 2014

  • SME-ICGCM
    Potential Application of Short Encapsulation Pull Test (Sept) Data to Project Relative Roof Control Risk

    By Yoginder Paul Chugh, Jason E. Tinsley

    "Over the last five years, the authors have compiled a database of Short Encapsulation Pull Test (SEPT) evaluations from Interior Basin (Basin) coal mines. Typically, SEPT data are analyzed to obtain

    Jan 1, 2016

  • SME-ICGCM
    Determination Of Limitation Of Roof Layer Separation (LRLS) In Entry Roof

    By Wenjun Ju

    It's very important to determine the limitation of bed separation in entry roof in order to predict roofs stability and take some necessary precautions. Based on numerical modeling and monitoring

    Jan 1, 2001

  • SME-ICGCM
    Selection of Pumpable Cribs for Longwall Gate and Bleeder Entries

    By Alan A. Campoli

    "Pumpable crib support for longwall gates and ventilation bleeder entries is becoming more prevalent in United States coal mines (Figure 1). The pumpable crib selection and spacing design has been gre

    Jan 1, 2015

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005

  • SME-ICGCM
    Assessment of Ground Conditions Near a Mine Portal Using Ground Penetrating Radar

    By Michael Trevits

    The NIOSH Lake Lynn Laboratory (LLL) is a unique research facility, located about 50 miles southeast of Pittsburgh, Pennsylvania, that is designed to provide a full-scale mining environment for testin

    Jan 1, 2005

  • SME-ICGCM
    Numerical Modeling of Standing Support Performance in Entries between Longwall Gobs

    By Benjamin Mirabile

    "Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth

    Jan 1, 2015

  • SME-ICGCM
    Definition of Ultra-close Multiple-seams and its Ground Pressure Behavior

    By Baisheng Zhang

    The definition of Ultra-close multiple seams as defined by the floor disturbance depth, h, due to mining in the upper seam is proposed: it refers to those coal seams that are spaced very closely, i.e.

    Jan 1, 2005

  • SME-ICGCM
    Geotechnical Strata Characterisation Using Geophysical Borehole Logs

    By Terry Medhurst

    Geophysical logging is routinely undertaken as part of most Australian coal mining exploration programs. Typically, the main application is the determination of coal seam depth and the qualitative est

    Jan 1, 2005

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement ? A Case Study

    By Behdeen Oraee-Mirzamani

    Tunnel stability has an important role in the production process of an underground coal mine. There are various methods for analysing tunnel stability, such as numerical methods and analytical methods

    Jan 1, 2013

  • SME-ICGCM
    Analysis of Seismic Source Parameters of Roof Falls in Time and Space for Assessing Strata Stability by Microseismic Technique at Rajendra Longwall Coal Mine in India: A Case Study

    By C. Srinivasan

    Microseismic emissions are generated by deformation and cracking of rock around an opening inside a mine. The rock tends to achieve equilibrium in a new geometry under changing stress conditions was f

    Jan 1, 2005

  • SME-ICGCM
    Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance

    By Tom Vandergritft

    With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall

    Jan 1, 2005

  • SME-ICGCM
    Shear Bond Characteristics in Grouted Cable Bolts

    By Jian Yong Chen

    The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o

    Jan 1, 2005

  • SME-ICGCM
    Determination of Load Transfer Characteristics of Gloved Resin Bolts from Laboratory and In Situ Field Testing

    By Dion Pastars

    Resin based grouts are the main form of rock bolt anchorage in the underground coal industry in Australia and New Zealand. To be effective, the system requires the mixing of the catalyst and mastic co

    Jan 1, 2005

  • SME-ICGCM
    The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan

    By S. Mehrdad Heidari

    The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a

    Jan 1, 2005

  • SME-ICGCM
    A System to Provide Early Warning on Impending Goaf

    By Gift Makusha

    Total extraction mining of coal is being undertaken on a small scale by Anglo Coal South Africa. Longwall mining has been done in the group at New Denmark colliery since the 80s and recently the compa

    Jan 1, 2005

  • SME-ICGCM
    Highwall Control At Homestake's Open Cut Mine

    By Don Berger

    Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm

    Jan 1, 1996