Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Research on Abutment Pressure Distribution for Longwall Face Mining Through Abandoned Gateroads

    By Peng Cao, Jimin Su, Yang Li

    "Abutment pressure distribution is different when a longwall panel is passing through the abandoned gateroads in a damaged coal seam. According to the geological conditon of panel E13103 in Cuijiazhai

    Jan 1, 2018

  • SME-ICGCM
    Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface Control

    By Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard

    "Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in

    Jan 1, 2017

  • SME-ICGCM
    Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle Sandstone

    By Michael Murphy

    A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.

    Jan 1, 2014

  • SME-ICGCM
    Development of a Fault-Rupture Environment in 3D: A Numerical Tool for Examining the Mechanical Impact of a Fault on Underground Excavations

    By Bo-Hyun Kim, Mark K. Larson

    "While faults are commonly simulated as a single planar or non-planar interface for a safety or stability analysis in underground mining excavation, the real 3D structure of a fault is often very comp

    Jan 1, 2018

  • SME-ICGCM
    Study of Energy Release Associated with Coal Burst Occurrence

    By Chengguo Zhang, Bruce Hebblewhite, Faham Tahmasebinia, lsmet Canbulat

    "Coal burst is a dynamic release of energy within the rock (or coal) mass leading to high velocity expulsion of the broken/ failed material into mine openings. This phenomenon has been recognised as o

    Jan 1, 2016

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    On Research Needs in Coal Mine Ground Control

    By Syd Peng

    "As the International Conference on Ground Control in Mining (ICGCM) enters its 35th year in 2015, it is time to look back and identify the areas that need to be emphasized and to look forward to see

    Jan 1, 2015

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Suspension Designs Required in the Logical Framework

    By Ross W. Seedsman

    The logical framework recognises that a coal mine roof can be intrinsically stable or may collapse in one of four ways. Suspension of the immediate roof is one of fundamental ground control strategie

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Monitoring of Retreat Room-and-Pillar Mine in Central Appalachia

    By William J. Conrad, Ryan J. Molka, Erik C. Westman

    "In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian mine. The program consisted of several monitoring methods including

    Jan 1, 2016

  • SME-ICGCM
    High-Precision Dynamic Subsidence Prediction Model Aided by Field Measured Data

    By Yuanfei Chen, Jianfeng Zha

    "China is the largest producer and consumer of coal in the world. The mining-induced surface subsidence has bad influences on the surface and structures above the surface. In order to minimize disaste

    Jan 1, 2017

  • SME-ICGCM
    Deign of Support System for Mining Tunnels in Carboniferous Rock Conditions

    By B. N. Whittaker

    The paper briefly reviews the type of support and stability problems encountered in mining tunnels in U.K. Carboniferous rock conditions, particularly the Coal Measures where almost all such tunnels a

    Jan 1, 1987

  • SME-ICGCM
    An Analysis of Rock Failure Around a Deep Longwall Using Microseismics

    By Keith Heasley

    In this paper, a state-of-the-art, three-dimensional, full waveform, microseismic system was used to analyze the rock failure around a deep (> 750 in (2500 ft) of cover) bump-prone longwall panel. The

    Jan 1, 2001

  • SME-ICGCM
    Cemented Coal Gangue-Fly Ash Backfill Technique

    By Baogui Yang, Jie Yang, Anthony Iannacchione

    "The cemented coal gangue-fly ash backfill technique (CGFB) has commonly been used to control subsidence damage caused by underground coal mining. This paper discusses the CGFB backfilling process use

    Jan 1, 2018

  • SME-ICGCM
    Roof Support Performance In High Stress Conditions

    By Thomas P. Mucho

    To document the performance of mine roof and roof support systems the U.S. Bureau of Mines (IJSBM) has been installing instrumentation at selected sites in U.S. coal mines. Much of this support and ro

    Jan 1, 1995

  • SME-ICGCM
    Case Study of the Barro Branco Coal Mine Pillar Burst

    By Fernando O. L. Xavier

    "The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Challenges and Experiences of Working a Deep and Wide Longwall Face: A Case Study of Adriyala Longwall Project, SCCL

    By Gautam Benerjee, Veera Reddy Boothukuri, Bhattacharjee Ram Madhav, Panigrahi Durga Charan

    "India’s tryst with mechanized longwall coal mining started with the introduction of the first self-advancing powered support longwall (PSLW) face at Moonidih Colliery of Jharia Coalfield in 1978 and

    Jan 1, 2017

  • SME-ICGCM
    A Statistical Overview of Retreat Mining of Coal Pillars in the United States

    By Christopher Mark

    The demographics and safety record of the pillar retreat segment of the U.S. coal industry was analyzed using statistics collected by the Mine Safety and Health Administration. Pillar recovery is prac

    Jan 1, 1997

  • SME-ICGCM
    Introduction of a New Superior Coating on Ground Support Products

    By Renn Oler

    Corrosion can often cause significant strength reduction and failure of steel rockbolts, thus demanding continuous rehabilitation and posing challenges to underground mines in maintaining long term gr

    Jan 1, 2014