Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    J?Crete: An Engineered Cementitious Composite Rock Coating

    By Alan A. Campoli

    The mining industry has long been searching for an effective structural application that prevents weathering and falls of loose rock, debris, and sediment. J-Crete is a fiber-reinforced, engineered, c

    Jan 1, 2012

  • SME-ICGCM
    Application Of Hilti Onestep Bolts For Roadway Support In German Deep Coal Mines

    By Michael Bayerl

    The HILTI OneStep rockbolt was implemented for roadway development in German deep coal mines in 2004. The development by HILTI Company is based on a technical joint venture with RAG Deutsche Steinkoh

    Jan 1, 2009

  • SME-ICGCM
    Pillar Reinforcement or Rib Support?

    By André C. Zingano

    The coal pillars in room-and-pillar mining method are subjected to vertical stress due to overburden rock mass and horizontal stress relieve due to entries excavation around them. Some coal mining com

    Jan 1, 2006

  • SME-ICGCM
    Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and Perspective

    By G. J. Hasenfus

    Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?

    Jan 1, 2006

  • SME-ICGCM
    Characteristic Acoustic Emission Sequences of Rock Samples Under Uniaxial Loading

    By Nic Slatalla

    Acoustic emission monitoring techniques are a powerful tool for analysing deformation behaviour and fracture characteristics of rock samples under uniaxial loading. Uniaxial compression tests wer

    Jan 1, 2008

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Effects of Weak Bands on Pillar Stability in Stone Mines: Field Observations and Numerical Model Assessment

    By Gabriel Esterhuizen

    Observations of pillar conditions in limestone mines showed that the presence of weak bands in the limestone can result in pillar damage at stresses that are lower than one would otherwise expect. Th

    Jan 1, 2007

  • SME-ICGCM
    Physical Simulation of Overburden Movement and Stability of Aquiclude in Shallow Seam Mining

    By Qingxiang Huang

    Shallow seam coal field has the largest coal reserve in China. Mining in shallow depth causes serious problems. One of them is subsurface dewatering. In this paper, the physical simulating model was p

    Jan 1, 2006

  • SME-ICGCM
    Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control

    By Sudhir Kumar Kashyap

    In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of

    Jan 1, 2012

  • SME-ICGCM
    Think Like a Roof Bolt ? Then Make It Scream ?

    By Greg Smith

    This paper documents the use of bench testing equipment developed to enhance the understanding of, and improve upon, common roof bolt support systems. Most roof bolt systems consist of components that

    Jan 1, 2012

  • SME-ICGCM
    Subsidence and Uplift Prediction in German and Polish Hard Coal Mining

    By Axel Preusse

    For the last 150 years, subsidence damage to the surface has been an unavoidable phenomenon associated with underground coal mining. In particular, the mechanization of mining methods in multiple seam

    Jan 1, 2012

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME-ICGCM
    Classification of Chock Shields Behaviour in an Indian Longwall Mine in Real Time

    By Srinivasulu Tadisetty

    The productivity and safety of Indian longwall operations are insignificant because of complex geomechanical conditions. Therefore, the continuous monitoring and forecasting of abnormalities is impera

    Jan 1, 2006

  • SME-ICGCM
    Assessment and Mitigation of Subsidence Effects on a Tall Self-Supporting and Free-Standing Communication Tower

    By Yi Luo

    A longwall mining operation went under a tall, self-supporting and free-standing wireless communication transmission tower. In anticipation of that the ground subsidence process might affect the trans

    Jan 1, 2008

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008