Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    AA Pad Reclamation Performance Review At Barrick’s Goldstrike Mine

    By K. L. Myers, R. Espell, C. Deringer

    Construction of the AA Pad reclamation was completed in the fall of 2000. Seeding of the ET cover began in the late fall of 2000 and continued through May of 2001. On Saturday afternoon, June 1, 2002,

    Jan 1, 2003

  • SME
    Boring Through a Rock-Soil Interface in Singapore

    By Nicola Della Valle

    The Singapore Land Transport Authority (LTA) is currently expanding capacity by extending their Metro system from South of the city to the North East end of the island. The scope of Contract 704 in

    Jan 1, 2001

  • SME
    Occurrence and Exploitation of Amphibole Asbestos in South Africa

    By C. J. B. Dreyer, H. A. Robinson

    Only South Africa can be considered in terms of resources of amphibole asbestos. There are two asbestos producing fields, one in the Northern Cape Province (producing only crocidolite), and one in the

    Jan 1, 1986

  • SME
    Teaching Kids Project: A Bet for New Generations in Mining - SME Annual Meeting 2025

    By Juan C. Diaz, Juan P. Carmona, Manuel Z. Salgado, Oscar J. Restrepo

    The “Teaching Kids” project is an educational initiative for young people and children from elementary schools. It is carried out by Mining, Geological, and Environmental Engineering students from the

    Feb 1, 2025

  • SME
    Mitigation of Acid Rock Drainage at the Summitville Mine Superfund Site, Colorado, USA

    By Angus Campbell, Michael J. Gobla

    Numerous techniques for treating, controlling, and preventing acid rock drainage have been applied at the Summitville Mine Superfund Site. Challenging aspects of the remote mine site include the wide-

    Jan 1, 2000

  • SME
    Robotization at El Teniente Mine

    By Gastón Díiaz, Enzo Carranza Meza

    El Teniente Mine of Codelco-Chile, located at Los Andes Range of Mountains, 90 kilometers South far from Santiago, the capital city, has been exploited for more than 90 years, with over 1000 million t

    Jan 1, 1998

  • SME
    Ecological Principles In Restoration Of Abandoned Quarry In Milos Island

    By I. Meliadis

    This study presents the methodology and proposals for the restoration of an abandoned quarry in the Greek island of Milos. The local data (soil, vegetation etc.) of the island were collected, analysed

    Jan 1, 2002

  • SME
    Fires And Explosions (d51f8edf-b123-476c-9ebd-d8c8541fc4d8)

    By Everett M. (Original by) White

    Numerous articles have been written about the coal mine ; he has been compared with brave men who have gone out to conquer some unknown hazard throughout the ages. Now, however, modern mining is no lo

    Jan 1, 1981

  • SME
    Geostatistical Analysis Of Dynamic Transmissivity Conditions During In Situ Copper Leaching

    By Michael J. Friedel

    As part of a study aimed at understanding the hydrology of in situ leach mining (ISLM), the Bureau of Mines, in cooperation with the Cyprus Casa Grande Corporation and the University of Arizona, is in

    Jan 1, 1992

  • SME
    Contribution Of The Geophysical Methods In Delineating Soil Contamination

    By G. Kritikakis

    Rehabilitation of sites contaminated by oil products and chlorinated organic compounds is a costly task which affects the planning of urban and infrastructure development. An integrated approach based

    Jan 1, 2006

  • SME
    Evaluating Tailgate Spray Manifolds to Reduce Dust Exposures for Shearer Face Personnel

    By G. J. Joy, J. P. Rider

    "Technical advances in longwall mining over the last several years have resulted in much larger and faster shearers that have the capability of mining at speeds over 100 ft./min. This has resulted in

    Jan 1, 2015

  • SME
    Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023

    By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski

    High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode

    Jun 13, 2023

  • SME
    Rubber-Tired Haulage Systems

    By Christopher J. Bise

    INTRODUCTION Face haulage in underground mines and pit haulage in surface mines are the principal domains of rubber- tired haulage vehicles. In underground mines, cable- reeled or battery-operated

    Jan 1, 1986

  • SME
    Until the End and Beyond: The Sustainable Development Strategy of the German Hard Coal Mining Industry

    By J. Kretschmann

    "By the end of the 1950s, the German hard coal mining industry produced 150 million tons of hard coal per year in 170 collieries with 600,000 employees. At that time, 70% of the primary energy demand

    Jan 1, 2017

  • SME
    Selecting Circuits To Prepare Beneficiation Circuit Feed From Primary Crusher Product

    By M. D. Flavel

    Testing methods are described to help in decisions of selecting the most viable comminution circuits. The authors present a comparison evaluation based on numerous studies to help make initial choices

    Jan 1, 1981

  • SME
    Asbestos

    By E. L. Mann, Robert L. Virta

    Asbestos is a generic name given to six fibrous minerals that have been used widely in commercial products. The six types of asbestos are chrysotile, crocidolite, amosite, anthophyllite asbestos, trem

    Jan 1, 1994

  • SME
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • SME
    Reclamation Of Mineral Milling Wastes

    By Karl C. Dean

    To assist in the reduction of environmental degradation resulting from milling operations, the Bureau of Mines has developed, and successfully demonstrated, chemical, vegetative, and combined chemical

    Jan 1, 1972

  • SME
    Risk Related to PPP Tunneling Projects for Design Professionals

    By David J. Hatem

    Tunnels and underground projects are inherently more risky than vertical projects, which typically utilize more conventional design and construction approaches and are undertaken in the context of rel

  • SME
    Minimum Engineering Requirements for Assessing Mining Projects

    By R. Addison, T. Swendseid, R. Kehmeier, D. Larsen, J. Uhrie

    "The development of a mining project necessarily progresses through many steps, beginning with the identification of a mineral resource and continuing through project construction. Several classificat

    Jan 1, 2016