Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Silica Dust Sources In Underground Metal/Nonmetal Mines - Two Case Studies (b311d9b0-a7c4-4e80-9fbb-e293d45f1daa)By R. H. Grau
NIOSH’s Pittsburgh Research Laboratory is currently involved in research to identify silica dust generation in underground metal/nonmetal mines. The ultimate goal of this research is to develop con
Jan 1, 2002
-
Widening Uncertainties in the Utility Fuel Outlook – Preprint 97-21By J. B. Platt
Many utility fuel choices 1990-95 defied expectations, with utility decisions and coal market developments ever more closely linked. The Central Appalachian coal boom never occurred; clean-enough coal
Feb 24, 1997
-
Design Considerations For Structures To Be Built On Subsidence Prone LandBy R. D. Begley
This paper will present detailed design drawings of a flexible single floor residential superstructure proposed for both longwall and room and pillar mining conditions. All efforts were made to provid
Jan 1, 1986
-
Shaft Sinking In Difficult Ground Conditions For The LEP Project, Geneva, SwitzerlandBy F. Dieu, C. Laughton
CERN, the European Laboratory for Particle Physics, is, at present, constructing an underground tunnel and cavern network to house a Large Electron Positron (LEP) colliding beam machine. This paper
Jan 1, 1987
-
Construction Control Instrumentation Used During Tunnel EnlargementBy Raymond P. Miller, David L. Monson, Robert A. Robinson
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p
Jan 1, 1976
-
Application and Abstraction of Shaft Drilling Technique in Coal Mine Construction in ChinaBy D. Gu
Shaft drilling is one of the most useful methods of driving shafts. This paper describes the application and development of the technique in coal mine construction in China.
Jan 1, 1993
-
Stability Prediction And Performance Of Highwall Steepening In Weak RockBy D. R. Brox, J. Levell
The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit
Jan 1, 2001
-
Assessing the contribution of underground in-situ coal gasification (UICG) within a sustainable development frameworkBy Z. Hyder, M. Karmis
Underground or In-situ Coal Gasification (UCG or UICG), though not a new concept, is now attracting considerable global attention as a viable process to provide a "clean" and economic fuel from coal.
Jan 1, 2011
-
Risk Assessment Due To Environmental Exposures To Fibrous Particulates Associated With Taconite OreBy Richard Wilson
In the early 1970s, it became a concern that exposure to the mineral fibers associated taconite ore processed in Silver Bay, Minnesota would cause asbestos-related disease including gastrointestinal
Jan 1, 2007
-
Building Better Haul Roads: Designing For Structural StrengthThe structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo
Jan 1, 2011
-
ISO 14040-42 (LCA) Standard Implementation to Stone Wool’s Production for Environmental Indicators’ Development - Interaction with ISO 14031 StandardBy E. Giama, A. Macridis, A. M. Papadopoulos
ISO 14031 is an international standard that describes a process for measuring environmental performance evaluation by setting quantitative indicators and providing a structured approach for organizati
Jan 1, 2005
-
Breaking The Glass Ceiling In Advance Rates Via Technology And PeopleBy B. C. Lewis
Have technological advancements in underground coal mining driven people's skills to new highs or have the expanded skills of mining people driven the industry's technological advancements.
Jan 1, 1999
-
Soft Ground Tunneling Issues Handled by Partnering—A Win-Win Project in Rancho Cordova, CaliforniaBy Jack Magtoto, Lysa Voight, Tom Martin, John Forero
SUMMARY Commitment by all parties to partnering goals established early in the contract aided Affholder, Inc. in constructing 2,360m (7,700') of soft ground tunnel in Rancho Cordova, CA. Desp
Jan 1, 2007
-
Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall OperationsLongwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De
Jan 7, 2020
-
Session 5: Assessment Of Health Risk Associated With Exposure To Nonasbestiform Amphiboles Including Ingestion Studies: Rapporteus?s ReportPaper 1: Risk of gastrointestinal cancers from inhalation and ingestion of asbestos, John F. Gamble Selikoff suggested the hypothesis that asbestos exposure is causally associated with increased
Jan 1, 2007
-
Origin Of The Problem: Rapporteur?s Report ? IntroductionBy Malcolm Ross
The Reserve Mining Co., in the processing of taconite iron ore quarried from the Peter Mitchell Pit, deposited the finely crushed waste rock into Lake Superior near Silver Bay Minnesota. In the early
Jan 1, 2007
-
James R. Arnold: An Interview With the 2007 SME PresidentHow did you get into mining; were you from a mining town or mining family? Not at all. I grew up in northwest Kansas. I liked to hunt and fish, so I thought it would be fun to work for a company
Jan 1, 2007
-
Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank CoalBy R. J. Snoby, J. K. Alderman
Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr
Jan 1, 2001
-
Ventilation And Climate Simulation Of Development Ends In Metal MinesBy P. Rostami
It is important to study the ventilation system in order to better design and control of the working environment in deep underground mines. With increasing depth, heat, and humidity performance may be
Jan 1, 2011
-
Sound Transit Link Light Rail Northern ExtensionBy Paul M. Godlewski, Joseph P. Gildner, David S. McAllister
With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill
Jan 1, 2005