Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
PPV. SD. Really? Still??By Doug Anderson
Two quantities, Peak Particle Velocity (PPV) and Scaled Distance (SD), have controlled aspects of many blasting projects and operations for a long time. Vibration criteria typically use both PPV and S
Jan 1, 2018
-
Blast Modification to Improve Bench Width Reliability at the EKATI Fox PitBy D Anonby
The Fox Pit at EKATI Diamond Mine is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high faces. Blasting tests were conducted to increase the percentage of be
Jan 1, 2007
-
Micro-Meter Measurement of Cracks to Compare Blast and Environmental EffectsBy Michael Louis, Charles Dowding
Concern over construction vibration-induced cracking has led to development of a new approach to vibration monitoring called autonomous crack measurement (ACM) and illustrated in Figure 1. This paper
Jan 1, 2003
-
Mitigation and Management of Blast Generated Fume in Eastern AustraliaBy Muamer Medusalic, Kim Henley, Lucas Bottomley
The period from 2009 to 2012 has witnessed a large rise in the number of blast-generated fume events in Eastern Australia, where highly visible oxides of nitrogen (NOx) are produced from coal mine bla
Jan 1, 2012
-
Air Decking Technique for Secondary/Boulders BlastingBy Michael Karmis, Syed Muhammad Tariq, Zeshan Hyder
Secondary or boulders blasting is a regular feature of quarrying operations in Pakistan, especially in cement and stone crushing industries. The main reason for secondary blasting is the production of
Jan 1, 2012
-
The Influence of External Detonation Generated Plasmas Upon the Performance of Semi-Confined Explosive CartridgesBy Lex L. Udy
External detonation generated plasmas, highly ionized zones of reacting material ejected from the surface of detonating explosive charges, are shown to be the cause of channel desensitization, i.e., t
Jan 1, 1977
-
Near-Field Elastic Ground Response Spectra for Multi-Hole Surface ExplosionsBy G E. Frantii
In the exploitation of low grade mineral deposits, blasting engineers are vitally concerned with maximizing the efficiency of explosive fracturing of rock while simultaneously limiting deleterious env
Jan 1, 1977
-
Explosives Energy is Challenging Mechanical Energy for Overburden RemovalBy Jim Petrunyak, Conny Postpack
The authors describe in this paper a systematic approach toward reducing coal production costs up to 35% through the use of explosives energy for overburden removal. In this system, explosives are emp
Jan 1, 1983
-
Journal: Anhydrous Ammonia and Ammonium Nitrate Production Raw Materials for BlastingBy Ken Tunnel
In the spring of 2005, the Lake Superior Chapter of the ISEE invited me to speak about raw materials used for blasting, anhydrous ammonia and the effect of this important feedstock on the cost of ammo
Jan 1, 2007
-
The Hercudet Nonelectric Delay Blasting Cap System New Developments in Field UsageBy Robert B. Hopler
The Hercudet ? Nonelectric Delay Blasting Cap System has undergone significant changes since the last paper on the subject was presented at the 1978 S.E.E. Conference. The changes have been made to im
Jan 1, 1980
-
The Effects of Fault Planes on the Propagation of Vibration WavesBy Abdulkadir Karadogan, Zikri Keti, Umit Ozer, Mehmet Aksoy, Ulku Kalayci
This paper presents an investigation about how the motions of blast induced vibration waves were affected by the presence of the fault planes. This study was carried out at Espey Open- Pit Boron (Cole
Jan 1, 2012
-
Blast Design for Optimizing Fragmentation While Controlling Frequency of Ground VibrationBy Andrew P. Ritter, Douglas A. Anderson, Stephen R. Winzer
We have adopted a unified approach to blast design. Based on earlier research, we chose minimum relief of 3.4 ms/ft between holes in a row and 8.6 ms/ft between echelons to produce good fragmentation.
Jan 1, 1982
-
Blast Design for Fragmentation of Anisotropic Rock Mass in Surface MinesBy K Ramachandra Rao
Joints, fractures and other structural defects bring anisotropic character Into a rock mass. Conventional methods of blast design In a rock mass consisting phyllites, mica schist etc., which are chara
Jan 1, 1995
-
Flyrock Range & Fragment Size PredictionBy Cameron McKenzie
Flyrock is a complex issue involving interaction between the charging crew, the blast design, and the local geology, and once conditions on the shot meet certain criteria, the probability of a flyrock
Jan 1, 2009
-
Theoretical Study and Possible Application of Blast Casting Technique in Phosphate Rock Strip MiningBy Salah A. Taqieddin
The blast casting technique of removing overburden is an innovative technique which was successfully used in the mining of certain surface coal and quarries. This method was found to be efficient in
Jan 1, 1992
-
Bio-fuel ANFO-Explosive alternative for a green worldBy Dale Ross, Bill Clements, Jim Spanos
Current world conditions are forcing the search for "green" energy technology in every aspect of our daily lives. Finding alternatives to petroleum fuels seems to be at the top of the list. The search
Jan 1, 2012
-
New Underground Drilling, Blasting and Mining Methods at the Manic-5 Additional-Power Hydro-Electric ProjectBy M Sampara, W Comeau
The introduction of large-diameter holes to underground mining has made possible the development of new mining methods such as the Vertical Crater Retreat (V.C.R.) method. It is not only the safest un
Jan 1, 1981
-
The Influence of Electronic Delay Detonators on Vibration Fragmentation, Heave and Blast ThrowBy AJ Rorke
Blasting trials using Daveytronic Electronic Delay Detonator systems (EDD’s) were conducted at the Alpha Ferro Quany (Pretoria) and the Eikeboom Colliery near Witbank in November 1999. The objectives
Jan 1, 2000
-
Control Blasting at Sherman MineBy Peter N. Calder, John N. Tuomi
The development of a successful control blasting program for an open pit iron mine in hard jointed rock is described. The objectives and mechanics of control blasting are discussed. Design and impleme
Jan 1, 1980
-
How to Control Blast Vibrations in an UrbanBy R E. Langston, S M. Gazioglu
A preconstruction inventory program was conducted to determine the existing conditions of residential, non-residential and all other structures within 2,000 feet of the blasting limits for a highway e
Jan 1, 1980