Unusual Dolphin Monopile StructureBy C. T. Christensen
The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg
Jan 1, 1989
-
Centrifuge Test on Reduction of Lateral Flow of Liquefied Ground by Stabilized ColumnsBy Shinji Sassa, Naoki Takahashi, Eiji Kohama, Wakaki Tsuda, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"Abstract Deep mixing method has been employed increasingly in recent years as a countermeasure against subsoil liquefaction. Column-type solidification, however, has been thought to have little effec
Jan 1, 2014
-
Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load TestingBy Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
-
Lateral Load Capacity of Helical Piles in SandBy Balu E. George, Subhadeep Banerjee, Shailesh R. Gandhi
"A three-dimensional analysis of laterally loaded helical piles installed in cohesionless soil is presented. Finite Element Analysis was conducted using commercially available Plaxis 3D AE version, as
Jan 1, 2017
-
Piled Raft Design For High Rise Buildings In East London, UKBy D. P. Nicholson
The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South
Jan 1, 2002
-
Creative Shoring Solutions For A Tight Urban SiteBy David G. Winter
The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s
Jan 1, 2009
-
Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult ConditionsBy J. C. W. M. de Wit
An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the
Jan 1, 2006
-
Bearing Capacity Of Piles Determined By Field Tests ? SynopsisBy D. M. Milovic
On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone
Jan 1, 2010
-
Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test DataBy Ramin Motamed, Joseph A. W. Toth
Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte
Jan 1, 2018
-
Behavior Of Mini-Piles Used In Foundation Underpinning In Beaumont Clay, Houston, Texas, USABy O&apos, M. W. Neill
Mini-piles have been found to be a practical, technically correct remedial underpinning method. They can be constructed in limited access areas with very little disruption. Experience indicated that m
Jan 1, 1989
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Theoretical Examination of Initially Bent PilesBy Janne P. Isohaka, Anssi M. Laaksonen
"Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu
Jan 1, 2014
-
Helical Piles With Grouted Shafts - A Practical OverviewBy Gary L. Seider
Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.
Jan 1, 2003
-
Structural Underpinning By PinpilesBy D. A. Bruce
Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per
Jan 1, 1992
-
Lateral Pile Load Testing Under Cyclic LoadsBy Dan Brown
This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed
Jan 1, 2003
-
Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case HistoryBy Raffaella Granata
The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an
Jan 1, 2006
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
Formation Of Interlocking Jet Grout Columns At Large DepthBy Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008
-
Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission LineBy Suk han Jang
This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This
Jan 1, 2007
-
Micropiles To Support Electric Power Transmission TowersBy Wendy L. Mathieson
The Bonneville Power Administration (BPA) will build about 500 miles of new 500-kV transmission lines in the next 5 years. Many new lattice towers will be built in remote locations or in environmenta
Jan 1, 2004