    A Case Study On Underreamed Piles ? Synopsis

    By Rajesh Minda

    160 numbers of double bulb underreamed piles were constructed based on the safe loads specified in IS code at Tripura. The pile load tests yielded a much lower capacity. A detailed investigation work

    Jan 1, 1996

  • DFI
    A New Diaphragm Wall Technology Providing Mechanical And Watertightenss Continuity

    By P. Dupeuble

    Diaphragm walls, owing to their method of construction are discontinuous structures. A new technology for the construction of joints between panels has been developed. This new process allows for the

    Jan 1, 2010

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Underpass Support Using Secant Pile Walls And Cement Deep Soil Mix Bottom Seal

    By Carole L. B. Mitchell

    The South 180th Street Grade Separation underpass in Tukwila and Renton, Washington, USA, permits vehicular traffic to pass beneath Burlington Northern Santa Fe and Union Pacific railroad tracks. The

    Jan 1, 2004

  • DFI
    Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2004

  • DFI
    Effects Of Mineral And Polymer Slurries On Drilled Shafts - 1. Introduction - 1.1 History Of And Principles Of Mineral Slurries In Drilled Shaft Construction

    By Michael W. Neill, O&apos

    Drilling slurry has become an effective aid to the construction of drilled shafts in caving and/or waterbearing soils. Historically, drilling slurry made of bentonitic clay and water was first used in

    Jan 1, 1991

  • DFI
    RD Pile Wall – A Water Tight Retaining Wall Structure

    By Antti J. Perala, Teemu J. Yli-Kovero

    "Efficient use of land is constantly requiring more underground construction. Minimized execution time and disturbance to surroundings and nearby structures are essential benefits for all construction

    Jan 1, 2017

  • DFI
    Environmental Considerations For Foundation Construction In The Boston Area - The New MCP

    By James V. Errico

    On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts

    Jan 1, 1994

  • DFI
    Predication Of Heave For Deep Excavation With Irregular Plane Shape

    By Zhang Jiaju

    For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method

    Jan 1, 1991

  • DFI
    Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 Description

    This work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles

    Jan 1, 1989

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • DFI
    Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction

    By Timothy L. Roberts

    For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary

    Jan 1, 1998

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • DFI
    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • DFI
    The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis

    By Kenneth Gavin

    The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded

    Jan 1, 1996

  • DFI
    Recent Experience With The Omega Pile And New Applications - Synopsis

    By Maurice Bottiau

    The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the

    Jan 1, 1996

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994

  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • DFI
    Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General Approach

    By L. C. Reese

    ? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc