Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
New Concepts For CFA (Auger Cast) Pile Controle - SynopsisBy Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End BearingBy J. Osterberg
A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward
Jan 1, 1989
-
Re-Use Of Foundations And The Role Of NDE TechniquesBy Huw Williams
It is becoming increasingly common practice to re-use existing foundations for new projects, especially on urban sites where geotechnical conditions are congested. A knowledge of the foundation dimens
Jan 1, 2006
-
Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill DamBy Eric M. Klein
As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad
Jan 1, 2006
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Study Of Hammer Selection For Driven Steel Pipe PileBy Jiwei Duan
The energy transferred from a hammer to the pile top is considered as the effective energy in this paper. The effective energy is related to the pile dimensions, soil and pile-soil interface propertie
Jan 1, 2006
-
Macropiles: Ultra-High-Capacity Micropiles For Foundation SupportBy John R. Wolosick
MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr
Jan 1, 2006
-
Large Diameter Shafts - Youghiogheny Reservoir BridgeBy Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2005
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
The Advantages Of Arbitration - I. Arbitration DefinedBy John B. Tieder
Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir
Jan 1, 1988
-
Development of a New, Advanced form of Sodium Silicate for Chemical GroutingBy Julie Shang, Tim Evans, Michael McDonald, Yu Guo, Bingfeng Xue
Effective chemical grouting represents a technical and economic solution to many challenges related to soil stabilization and blocking the flow of water. Chemical grouts are facing increasing demands
Jan 1, 2018
-
SFMOMA Expansion – Multiple Uses of Ground Improvement – A Case StudyBy Scott A. Walker, Frank L. Rollo
"The San Francisco Museum of Modern Art (SFMOMA) in downtown metropolitan San Francisco, California, is supported on a mat foundation. Although the mat foundation of the original museum was designed t
Jan 1, 2014
-
Deep Foundations In Hong Kong - SynopsisBy Martin Pratt
This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr
Jan 1, 2000
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft CarrierBy Michael Quadagno
Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t
Jan 1, 2008
-
Use Of Micropiles And Soil Nail Piles In State Of California Earthquake Retrofit Project No.#569 - Deep Foundations Institute Seattle, Washingon October 7-9, 1998By Ron Bromenschenkel
The State of California, Department of Transportation is currently retrofitting a major interchange near the San Francisco area. The project is located in a highly traveled area of Oakland with light
Jan 1, 1998
-
Design And Construction Of The Deep Stations For The Copenhagen Metro - SynopsisBy David R. Beadman
This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj
Jan 1, 2000
-
Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009