Sustainable Products For Geotechnical WorksBy Marcus Daubner, Karsten Beckhaus, Florian Bauer
The construction industry can and needs to contribute to a more sustainable world. Accordingly, geotechnical works potentially have a significant share. In this context, Bauer understands “sustainable
May 1, 2022
-
The Choice between HSDT and RLT: Selection Criteria for Concrete Pile TestingBy P. Middendorp, Gerald E. H. Verbeek
"INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing
Jan 1, 2006
-
New Pile for Reduced Underwater NoiseBy Dardis J. T. II, P. G. Reinhall
"Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. It has been shown that current pile driving noise attenuation techniques provide limited n
Jan 1, 2017
-
Design Of Self-drilling Micropiles For Permanent ApplicationsBy Racquel Nottingham, Freddy Lopez, Ole Gadermann
The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m
-
Temperature, Velocity, Density, And Moisture In Drilled ShaftsBy Khamis Y. Haramy
Curing temperature, density, and moisture significantly affect the velocity measured in the crosshole sonic logging, the rate of strength gain, and the final strength of concrete in drilled shafts and
Jan 1, 2007
-
2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From AboveBy Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022
-
Slope Stabilization of Mill Creek Landslide Using Steel H-PilesBy Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Soil-Structure Interaction Of A High-Rise Building Near Sensitive Structures In Soft Soil ConditionsBy Mohamed Hassan, Matthias Seip, Steffen Leppla
In the east of Frankfurt am Main, Germany, a new high-rise building is planned directly next to the river Main. The high-rise building will have a height of about 75 m and will be founded on a Combine
May 1, 2022
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
Alignment Control Of Drilling Rods For Jet Grouting By Integrated MicrochipsBy Mousaab Majar, Nikolaus Schneider
The technical challenges for accurate drilling positions increase with deep underground structures in inner city areas. Designed for jet grouting, specific sensors have been developed to record the al
May 1, 2022
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)By Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASINGBy Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Mixing Proportion Design and Construction Management for Application of Cement Deep Mixing Method to Construction Project on Controlled Final Landfill Site in JapanBy Yoshinori Kurumada, Masaya Watanabe, Kenji Sasa
"The Port of Yokohama is strengthening its international competitiveness as a strategic container port in order to respond appropriately to global exchange and shipping demands. Thus, the Minami Honmo
Jan 1, 2015
-
Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental ConsiderationsBy Takashi Enomoto
"The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja
Jan 1, 2015
-
Rock Socketed Drilled Shafts for the Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s