Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A scalable approach to optimal block scheduling

    By Jorge Amaya

    A critical aspect of long-term open-pit mine planning consists in computing a production schedule based upon a block sequencing strategy. Such a schedule should specify when and if blocks should be ex

    Oct 1, 2009

  • CIM
    A Scalable Approach to Optimal Block Scheduling

    By Jorge Amaya

    A critical aspect of long-term open-pit mine planning consists in computing a production schedule based upon a block sequencing strategy. Such a schedule should specify when and if blocks should be ex

    Oct 1, 2009

  • CIM
    Gold Analysis - Fire Assaying and Alternative Methods

    By James R. Yeager, Eric L. Hoffman, John R. Clark

    "Abstract -This paper describes fire assaying and ‘high tech’ alternatives for gold analysis, including advantages and disadvantages of each method. These ‘high tech’ methods include INAA (instrumenta

    Jan 1, 1998

  • CIM
    Abrasion and Wear in Mills (c81aa51e-7cf2-4e98-8abb-ce5490402a45)

    By K. G. Eriksson

    "The first tentative test made to try rubber lining in grinding mills was made in the early twenties. However, because of poor rubber compounds and design the results did not prove to be promising.In

    Jan 1, 1983

  • CIM
    Synthesis and Characterization of Bimetallic Pt-Au Cluster-Derived Catalysts

    By Lorna Ortiz-Soto

    A series of titiania- and silica-supported Au, Pt and Pt-Au catalysts prepared through different synthetic routes have been investigated in terms of their structural properties, adsorption of CO, and

    Oct 1, 2003

  • CIM
    Early Re-Entry into Working Faces in Mines through Modern Shotcrete Technology

    By Ross Dimmock

    The productivity of a mine has the same goals as the quest to complete a tunnel project both safely and within time. A key aspect to achieving this goal is to excavate and support the working face as

    May 1, 2003

  • CIM
    Comprehensive Environmental Ore Deposit Models as an Aid for Sustainable Development

    By Y. T. John Kwong

    Abstract - To exploit an ore deposit without unduly impacting the environment is a challenge that can only be met by the concerted efforts of traditionally independent teams working on a mining projec

    Jan 1, 2003

  • CIM
    Bioleaching of Chalcopyrite by the Thermophilic Archae Acidianus Brierleyi in Batch and Continuous-Flow Stirred Tank Reactors

    By Y. Konishi

    This paper reviews the mechanism and kinetics of bioleaching of chalcopyrite by the thermophilic archae Acidianus brierleyi in batch and continuous-flow reactors. Rate data for the batch bioleaching o

    Jan 1, 2007

  • CIM
    Fuzzy Scheduling of Repetitive Construction Projects

    By I. Bakry

    Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unach

    Aug 1, 2013

  • CIM
    Design and Development of an Automated Uranium Pellet Stacking System

    By B. S. Riess

    A novel design for an automated uranium pellet stacking system is presented. This system is designed as a drop-in solution to the current production line to enhance the fuel pellet stacking process. T

    Aug 1, 2010

  • CIM
    The Wasamac Mill

    By H. W. Hughes

    "The Wasamac Gold Mines mill, situated 10 miles from Rouyn-Noranda on highway 59, commenced milling April 1st 1965 at a rate of 700 tons per day. This has gradually increased to over 1200 tons per day

    Jan 1, 1966

  • CIM
    The Boleo Copper-Cobalt -Zinc-Manganese Project

    The Boleo project is located in Mexico close to the town of Santa Rosalia on the Baja Peninsula. The Boleo deposit contains copper, cobalt, zinc and manganese values as oxides with minor sulfides. The

    Jan 1, 2007

  • CIM
    Customising Copper-Iron Selectivity Using Modified Aldoxime Extractants: Pilot-Plant Evaluation

    By K. C. Sole

    In most copper solvent-extraction operations, an important consideration in choice of extractant is the requirement for high selectivity of copper over iron. Ester-modified aldoxime extractants presen

    Jan 1, 2007

  • CIM
    Effects of microtexture on the d hydride formation in Zircaloy-4

    By W. Qin

    The nucleation of d hydride in Zircaloy-4 has been studied using electron backscatter diffraction. Hydrides prefer to nucleate at intergranular rather than intragranular sites. (0001) a -Zr//(111) d -

    Aug 1, 2010

  • CIM
    Upgrading the JK SAG Mill Model (15def195-c5f3-4b60-8363-9a74a9d677d7)

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Attracting and Retaining Professionals in Mining and Metallurgy ? A High Tech Industry

    By D. Magoon

    The metals industry has enjoyed a resurgence in prices and demand for its commodities during the global surge in economic activity that began in 2005. This success has brought with it an unprecedented

    Jan 1, 2007

  • CIM
    Establishing Total Airflow Requirements for Underground Metal/Nonmetal Mines with Tier IV Diesel Equipment

    By J. D. Stinnette

    Traditionally, airflow requirements for diesel equipment operating in underground environments such as mines and tunnels were determined by multiplying the vehicle power by a ventilation rate that was

    Aug 1, 2013

  • CIM
    Water Recycling Methods Implemented at the Roy Lloyd Gold Mine Experience Gained and Future Plans

    By R. C. Snider

    The Roy Lloyd Mine in northern Saskatchewan is a high-grade underground gold mine which is currently supplying ore to Golden Band Resources Inc. (Golden Band)?s Jolu mill. Prior to the operation of th

    Nov 1, 2011

  • CIM
    Current Mg Production Technologies, Where Should They Head?

    By R. Harris

    The vacuum thermal route for magnesium production today accounts for roughly 80% of the global production of magnesium despite significant investment in the competing electrolytic technologies, This i

    Jan 1, 2006

  • CIM
    The Application of Sustainable Development Principles to the Alberta Aggregates Resource Sector

    By Don Peel, Jeremy Richards

    Abstract - Aggregates (sand, gravel, and crushed stone) are low unit-cost products extracted in very large volumes for the construction of buildings, roads, and other infrastructure essential to moder

    Jan 1, 2003