Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Upgrading The JK SAG Mill Model

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Ventilation of Development Headings

    By R. W. Thompkins

    The two largest contributors to silicosis in machine men are dust from drilling and dust from blasting. With the advent of the shatter-cut method of blasting, the evils of blasting dust were greatly r

    Jan 1, 1943

  • CIM
    The Preservative Treatment of Mine Timbers

    By J. F. Harkom

    Introduction The importance of the preservative treatment of mine timbers need scarcely be stressed here. Increasing the life of mine timbers will reduce one of the major costs of mining and also c

    Jan 1, 1930

  • CIM
    Design in Weak Rock Masses: Nevada Underground Mining Operations

    By Tom Brady

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate data on wea

    May 1, 2006

  • CIM
    Evaluation of Agitated Milling at Heath Steel Mines

    By J. Wild, M. Ounpuu, G. Chevalier

    "The requirements for a finer grind at Heath Steele have resulted in the investigation of agitated milling as a cost effective alternative to conventional tumbling ball mills.The grinding unit is a ve

    Jan 1, 1993

  • CIM
    Computer Analysis of Viscosity Effects on Selection for Breakage and Breakage Distribution Parameters in the Wet Grinding of Ores (4c8c0868-8a1c-4e4d-b5e6-47bee15df76c)

    By Willie Manfrey, Richard Klimpel

    This paper describes the effects of slurry viscosity on the selection-for-breakage and breakage distribution parameters in the wet grinding of cres. A series of experimental tests were run on laborato

    Jan 1, 1977

  • CIM
    Building community relations and community development strategies from day one: A case study of the Inmet Mining/Monkey Forest experience in a complex socio-political context.

    By Craig Ford

    Inmet Mining is committed to implementing the highest corporate responsibility standards in its mining operations worldwide. Inmet is 100% owner of Minera Panama, a world-class copper project that is

    May 1, 2010

  • CIM
    Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick (a738daf4-2f2a-4901-b06d-657f347a1821)

    By Robin N. Adair

    The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotiterich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally continuous sheet

    Jan 1, 1992

  • CIM
    The Application of Atomic Absorption Spectrometry to the Determination of Precious and Base Metals

    By J. Gillies

    "Extraction of Gold in Ketone from a suitably prepared sample of sulphide or siliceous ore or concentrate permits a rapid and accurate determination by Atomic Absorption. Mill test products and explor

    Jan 1, 1968

  • CIM
    A Simplified Online Solution for Simulation-Based Optimization of Earthmoving Operations

    By Yasser Mohamed

    Daily field management of earthmoving operations requires quick and regular decisions for allocating available equipment to different jobs on a project. A general foreman?s day starts with matching se

    Aug 1, 2013

  • CIM
    Process Advances at Lac Minerals Ltd. - Est Malartic Division

    By G. H. Hope, D. Green

    "Recent process advances at Lac Minerals Est Malartic Division are discussed. The Est Malartic mill treats massive sulphide, copper/gold ore from the Bousquet 2 mine, to produce a gravity gold product

    Jan 1, 1993

  • CIM
    Design and Construction of the Backfilled Pit Cover System at Whistle Mine, Canada: A Case Study

    By Brian K. Ayres

    Inco Limited, Ontario Division is currently in the process of decommissioning the Whistle Mine site located near Sudbury, Ontario, Canada. The most significant component of site decommissioning involv

    Apr 1, 2005

  • CIM
    Mine to Mill: Optimization of Aggregates Production

    By M. J. A. Ruszala

    Aggregates production is a huge global industry which uses an enormous amount of energy and produces a massive amount of unsalable fines. Reducing the amount of energy used per tonne of product and/or

    Aug 1, 2013

  • CIM
    Impact of Gas Emissions on the Initiation of Coal Bumps

    By Jie Zhu

    Coal bumps are a special form of release of geologic strain energy that has already been one of the most dangerous hazards to underground mining safety in China. A number of coal-bump models have been

    Aug 1, 2013

  • CIM
    Implementing Total Quality Management in an engineering environment

    By Brien A. Perry, Art Wiebert

    "Many organizations which have implemented Total Quality Management (TQM) are finding that the process has either stalled or is not working so well as originally envisioned. This can be particularly e

    Jan 1, 1995

  • CIM
    Phase Relations and Precious Metals Distribution in the Cu-Fe-S-As and Cu-Fe-S-Sb Systems Saturated With Carbon at 1473 K

    By L. Voisin, K. Itagaki

    In the reductive smelting of the copper concentrate like a blast furnace operation using coke as fuel and reductant or in processing the copper concentrate which contains coal in the bulk, a sulfur-de

    Jan 1, 2007

  • CIM
    Application of Advanced Mining Technology in Open Pit Mines for Optimizing Waste Dumping and Concurrent Land Reclamation

    By A. K. Debnath

    Mining being a site specific activity, land becomes the prime requirement for starting, successful execution and closure of any mining project. Many important mining projects are not progressing satis

    Aug 1, 2013

  • CIM
    Simulation - An Approach to Risk Analysis in Coal Mining

    By João Felipe Costa, Jair Carlos Koppe, André C. Zingano

    Abstract - Traditional mine planning based on block models built with interpolation techniques such as kriging does not take into account the uncertainty associated with the estimates. These models ar

    Jan 1, 2000

  • CIM
    Contribution of the Mining Industry: A Positive Message to Canadians

    By Paul Stothart

    Context ? Industry is active in urban, rural, and remote regions ? Faces a range of environmental challenges and ?social license? issues ? There are also Aboriginal and northern issues ? Also very

    May 1, 2008

  • CIM
    Development and Implementation of an Expert System for Grinding Control at the Dome Mine

    By John Eggert, Paul Benford

    "Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the

    Jan 1, 1994