Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Contaminant Dynamics In The Flooded Mine Pit At Abandoned Gunnar Uranium Site, N. Saskatchewan

    By Anton Sizo, Alexey Klyashtorin

    The Gunnar uranium mine operated from 1953 to 1961 on the shore of Lake Athabasca, in 1964 the site was abandoned, and the mine pit flooded. In 1981, the pit was found to be stratified with a chemocli

    Jan 1, 2020

  • CIM
    Experimental study of the Anisotropic Behaviour of Jointed Rock Masses Under Uniaxial Compression

    The influence of joint orientation and joint persistence, on the mechanical behaviour of jointed rock masses under uniaxial compression, has been studied systematically. The joint inclination angle ß

    Jan 1, 2015

  • CIM
    Assessment of Performance of Powered Shield Support used on Weak Floor

    The article presents an outline of methods and certain results of laboratory tests, underground tests and model tests, aimed at assessing performance of a powered shield support on the floor of low st

    Aug 1, 2013

  • CIM
    Water management simulation for the Pogo Gold Mine

    By G. Beckstead, L. Gormely, R. Zimmer, K. Hanneman, B. Nethery

    As part of the EIS and permitting activities for the Pogo Mine in Alaska, a risk assessment study for the water management plan was carried out. The basis for the study was a site water volume and con

    Jan 1, 2005

  • CIM
    The Political and Policy Context Shaping Canadian Energy

    By Paul Stothart

    Agenda 1)Key Political and Policy Issues 2)Relevance to the Mining Sector ?All parties vying to be the greenest ?Regulation, indoor air, health issues combined into Clean Air Act ?International c

    May 1, 2007

  • CIM
    The Quintette Coal Project Plant Design and Operational Experience

    By G. B. Bosworth, M. J. Lake, J. W. Hogg

    The Quintette Coal operation in northeastern British Columbia has one of the world's largest Preparation Plants, with a design capacity of 6.5 million tonnes per year of clean coal.This paper will dis

    Jan 1, 1987

  • CIM
    Experimental Evaluation of Pyromettalurgical Processes for Lead Removal from Brass

    By R. Stauber, B. Friedrich, S. Hilgendorf, G. Homm, C. Gellermann

    Due to recent regulations limiting tolerated lead concentrations in copper alloys, new recycling strategies have to be considered. This study investigates the suitability of technical approaches in or

    Jan 1, 2019

  • CIM
    Prediction of the Critical Rupture Thickness of Foam Films Formed from Saline Water in the Presence of Flotation Frothers

    By Liguang Wang

    The froth phase in flotation has received much less attention than the pulp phase despite the fact that froth stability plays an important role in determining flotation performance. Froth stability is

    Jan 1, 2016

  • CIM
    Towards Improving Gearless Mill Drive Availability

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American?s suite of specifications for gearless mill drives (?GMDs?). These specifications are based on

    Nov 1, 2011

  • CIM
    Fuzzy Clustering-Based Model For Productivity Forcasting

    By Farid Mirahadi

    Forecasting productivity of construction operations is a difficult but crucial task in planning construction projects. Over the past decades, many models have been developed to forecast productivity f

    Aug 1, 2013

  • CIM
    A new hydrocyclic system for mineral separation

    By Alireza Sarafi, Alijan Aftabi

    "A hydrocyclic system used for mineral separation at the laboratory scale results in the separation of more than 90% of micas. The system functions only by water and might offer advantages where other

    Jan 1, 1994

  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit (6ba284c3-b619-4b87-9743-c3aba495d77c)

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited above the h

    Jan 1, 1992

  • CIM
    Safe Rapid Drifting ? Water Jet Scaling

    By Paul G. Dunn

    Safe rapid drift development results principally in reducing exposure of underground workers to the working face. This reduction in exposure is not achieved until either the rock walls have been suita

    May 1, 2004

  • CIM
    The Ordovician Tetagouche Group, Bathurst Camp, Northern New Brunswick, Canada: History, Tectonic Setting, and Distribution of Massive-Sulfide Deposits (d4efba76-9c4a-42ee-a259-1a431117590b)

    By Steve R. McCutcheon, Cees R. Van Staal, John P. Langton, Leslie R. Fyffe

    The volcanic-dominated Tetagouche Group in northern New Brunswick contains numerous massive-sulfide deposits and intimately associated metalliferous sediments. The massive sulfides are generally hoste

    Jan 1, 1992

  • CIM
    Identification of Gaso?Geodynamic Zones in the Structure of Copper Ore Deposits using Geophysical Methods

    By Z. Pilecki

    This work concerns the identification of weak zones in the structure of a rock mass endangered by outburst of gases and rocks in the Rudna copper ore mine at greater depths (approximately 1200 m). A s

    Aug 1, 2013

  • CIM
    Innovative CRF batch plant design at the Leeville Mine, Nevada

    By A. E. Reschke

    Optimized mine planning of the Leeville Gold Mine, Nevada, necessitated the requirement for an average of 2540 tpd of high quality cemented rockfill (CRF) in primary stoping blocks and underhand cut a

    May 1, 2007

  • CIM
    Evaluation of Spiral Performance for Processing Iron Ore from the Carol Lake Deposit of the Iron Ore Company of Canada

    By G. Chung, W. Petruk, D. Doyle

    "A series of tests was conducted on Carol Lake iron ore, which contains about 38 wt % hematite and 19 wt % magnetite, to establish a flowsheet for high weight yield by spirals. A pilot plant was run i

    Jan 1, 1993

  • CIM
    Transportation of Gravel for Back-Fill by Branch Aerial Tram

    By W. F. J. Cosser

    AN agreement having been arrived at in 1935 whereby McIntyre Porcupine Mines would purchase gravel for back-filling purposes from Hollinger Consolidated Gold Mines, the aerial gear as described below

    Jan 1, 1938

  • CIM
    Preparation of Hydraulic Sand and Cement Backfill at Noranda Mines Limited (Geco Division)

    By C. Barnett

    "A description of the Geco orebody has been given by W .L. Brown and R.C.E. Bray (1). The mill flowsheet and equipment were described by M.J.S. Bennett, D. Wild and C. Lawton (2). Mill capacity is now

    Jan 1, 1968

  • CIM
    Student Perspectives on Partnerships and Employment

    By Michael Fuller

    Roadmap ? Examples of Partnership from UBC ?? Event Sponsorship ?? Recruitment & Connections ?? Opportunities ? National Recruitment Survey Results ? Conclusion with Key Points Event Sponsorshi

    May 1, 2008