Millpebs Testing at Brunswick ConcentratorBy Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper
"The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr
Jan 1, 2006
-
Effective Methods of Arsenic Removal from Gold Mine WastesBy J. Lee, R. G. Rosehart
"The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a
Jan 1, 1972
-
Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
The Approach to Process Improvements at Brunswick MineBy Chris Larsen, Carole Fortin, Dave Scott, Curtis Deredin, Ian Orford, Jean Guy Gauthier, Andy Trusiak, Lyne Côté, Mike Cooper
"Upon successful commissioning of the Stage Grinding Project (Cormier et. al., 2002), process improvements predicted through pilot plant testing were obtained in several flotation circuits, resulting
Jan 1, 2005
-
Automated Mine Scheduling: What is it and will it help me?By Fraser Rowe
This paper discusses the philosophies, strategies, goals and pitfalls in automating a mine schedule. The intention of the paper is to give an open and honest view of who could benefit from moving to a
Oct 1, 2009
-
Material Balancing of Assays From on-Stream AnalyzerBy Claude Bazin
"The On-Stream Analyzer has proven and is still proving to be an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilization
Jan 1, 1995
-
Study of slime coatings in flotation by electrophoretic mobility distribution measurementBy Jacob Masliyah, Zhiang Zhou, Tshitende Kasongo, Jianjun Liu, Zhenghe Xu, Jeawon Choung
"Slime coating is a recognized challenge in fine particle flotation, not only in decreasing recovery, but also in reducing the selectivity and hence froth quality. In this presentation, a novel method
Jan 1, 2002
-
Control System Performance Assessment-Best PracticesBy Michel Ruel
"PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo
Jan 1, 2011
-
Development and Testing of a More Effective Froth Handling PumpBy R. J. Visintainer, W. L. Whitlock
"Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre
Jan 1, 2012
-
Cultivator shank manufacture and evaluationBy R. W. Pugh, D. G. Bellow
"This paper will describe how cultivator shanks are made in one company and how the manufacturing was studied with a view to increasing product consistency and reducing manufacturing cost. The product
Jan 1, 1982
-
An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount MilliganBy J. Yue
"Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of
Jan 1, 2017
-
The Plant Audit (97ca6ee7-2dc9-4753-846d-b993abc1472c)By A. J. Neale, B. C. Flintoff
"In most mineral processing operations the term audit is usually reserved for the exercise of checking financial records and/ or safety practices. While these activities are time consuming, no one dis
Jan 1, 1991
-
Hydrogeological Aspects of Three Open Pits within Noranda OperationsBy L. C. St. Arnaud
"Open pit mines can produce large disturbances within regional hydrogeologic systems. The degree of disturbance and the consequences on the local environment depend on the size of the pit and on the p
Jan 1, 1990
-
The Pebble Copper-Gold-Molybdenum Porphyry, AlaskaBy John G. Payne
The Pebble deposit contains three contiguous zones. In the Pebble West zone, granodiorite stocks intrude gently warped volcanosedimentary rocks that had been intruded by diorite sills and two felsic i
May 1, 2006
-
Distribution Ratios of Platinium Group Metals Between Al2O3-CaO-SiO2 or FeO-CaO-SiO2 Slag Systems and Molten IronBy K. Yamaguchi, Sekimoto. H.
"Platinum Group Metals (PGMs) used as catalyst which reduces toxic substances in emission gas exhausted from an automobile should extensively be recycled because they are rare metals produced only at
Jan 1, 2014
-
The Fundamental Relationship Between Sample Mass and Sampling Variance in Real Geological Samples and Corresponding Statistical Models"In mineral exploration and mining applications, it is sometimes necessary to reduce sampling error in order to improve representivity of individual sample assays. Historic efforts to reduce sampling
Jan 1, 2007
-
Selected Physical-Chemical Aspects of FlocculationBy F. Halverson
"The theory of flocculation usually is in a state of flux, involves many diverse phenomena, and is complex and sometimes contradictory in details. Instead of attempting a general discourse, I shall di
Jan 1, 1978
-
Large adjustable-speed AC drives for the mining industryBy G. Hausen, H. Micka
"Modern signal and power electronics made adjustable-speed AC drives technically feasible and reliable and economically attractive. Cycloconverters are discussed as a proven technology for mine hoists
Jan 1, 1988
-
Crystallex’s Las Cristinas gold projectBy J. R. Goode
"The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la
Jan 1, 2005
-
Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek ConcentratorBy O. Matwijenko
"The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi
Jan 1, 1980