Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Development of Gold Recovery Technology from Pyrite-Pyrrhotite-Bearing Ores

    By L. V. Kin, V. V. Lodeischikov, A. V. Byvaltsev, IRGIREDMET JSC, O. D. Khmelnitskaya, S. V. Petrov

    "Irgiredmet Institute carried out the study on the development of gold recovery technology from refractory ore from a Russian deposit. The ore contained 1.1 g/t Au, 1.5% of pyrite and 2.4% of pyrrhoti

    Jan 1, 2016

  • CIM
    Maboumine Process: A Promising Process for Developing a Polymetallic Ore Deposit - Focus on the Downstream Part of the Process: Rare Earth Recovery

    By S. Belair, V. Weigel

    As a growing mining company, ERAMET is looking for new positions on the strategic metals market. In this context, the Gabonese Maboumine pyrochlore deposit is currently being studied for the recovery

    Jan 1, 2014

  • CIM
    Re-entry Protocols for Seismically Active Mines: An Update

    By J. A. Vallejos

    Re-entry protocols are a tactical approach for controlling risk after blasts or large events in seismically active mines. Based on the results of a survey on 18 seismically active mines, mostly in Ont

    May 1, 2009

  • CIM
    Water Supply Sourcing Options for Oil Sands Mines

    By Leslie F. Sawatsky

    Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin

    May 1, 2004

  • CIM
    Underground Mining of Thick Coal Seams

    "The success or failure of coal mining operations in Western Canada may hinge on the ability to extract thick coal under a variety of geological and mining circumstances and conditions. The paper pres

    Jan 1, 1972

  • CIM
    Processing Asbestos Fibres: Effects Upon Physical Properties

    By M. S. Badollet

    "IntroductionAsbestos as received by the manufacturer of asbestos products is •in the •form of either crudes or milled fibres processed to different degrees of texture. Frequently, the manufacturer fi

    Jan 1, 1950

  • CIM
    The iron elephant: A brief history of hydrometallurgists 2019 struggles with element no. 26

    By A. J. Monhemius

    This paper reviews the history of modern iron-control processes in hydrometallurgy. Attention is paid to processes developed in the electrolytic zinc industry for removal of iron from zinc sulfate lea

    Jan 1, 2017

  • CIM
    Rare Earth Recovery from Uranium Plant Raffinate and Operation of a Rare Earth Separation Pilot Plant

    By Y. Tang

    "Rare earth elements (REEs) have many key applications in traditional and advanced technologies. A shortage of several critical REEs is expected due to the discrepancy between the availability of REEs

    Jan 1, 2018

  • CIM
    On the Relationship Between Gold Mineralization and Ultramafic Volcanic Rocks In the Timmins Area, Northeastern Ontario

    By D. R. Pyke

    Many of the gold deposits in the Timmins• area show a close spatial association to ultramafic metavolcanics. Available analytical data suggest that ultramafic rocks contain significantly higher gold c

    Jan 1, 1976

  • CIM
    Low-Discharge Grinding at Sylvanite Gold Mines, Limited

    By C. E. Rodgers

    WHEN I was asked to prepare, for presentation at the 1938 Annual Meeting of the Institute, some data concerning low-discharge grinding at the Sylvanite mill, it seemed entirely reasonable to expect to

    Jan 1, 1938

  • CIM
    The Copper Situation

    By Arthur Notman

    Since addressing the Institute a year ago on The Future of the Copper Industry (l), many things have happened, most of them bad. It has been a hard year for profits and prophets. It was, therefore, wi

    Jan 1, 1932

  • CIM
    Autogenous milling — Effects on flotation of Mt. Lyell Copper ore Broyage autogène — Effets sur la flottation du minerai de cuivre de Mt. Lyell

    By N. C. Clarke, T. Wu, M. le Page, K. J. Henley

    In 1994, Gold Mines of Australia acquired the rights to the historic Mt. Lyell copper mine, and commenced a feasibility study into expanding production. The ore was shown in laboratory tests to be ame

    Jan 1, 2002

  • CIM
    Aerial Tramway Construction and Operation

    By Dale L. Pitt

    Introduction In opening up a new country, one of the most vital problems is that of transportation Without roads, railways, or water routes, development is very slow because these are the arteries

    Jan 1, 1930

  • CIM
    Optimizing Performance in Heavy Equipment Teleoperation

    By Jean-François Lapointe

    Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi

    May 1, 2001

  • CIM
    The Iron Elephant: A Brief History of Hydrometallurgists’ Struggles with Element No. 26 (0463678c-2472-4245-b1d3-73ea31e00da0)

    By A. J. Monhemius

    "This paper reviews the history of modern iron-control processes in hydrometallurgy. Attention is paid to processes developed in the electrolytic zinc industry for removal of iron from zinc sulfate le

    Jan 1, 2017

  • CIM
    Chapter 14. Boilerplate

    By Karl J. C. Harries

    "14.1. INTRODUCTION1The boilerplate of an agreement is not a single provision, but a series of provisions that are expected in “every agreement”. They are sometimes also referred to as the “lawyer’s p

    Jan 1, 2003

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972

  • CIM
    Man-less underground mining

    By J. Paraszczak

    For mining companies facing strong international competition and unfavourable commodities’ prices, automation of underground operations has the potential to increase productivity and help cut costs. H

    Jan 1, 2004

  • CIM
    Huronian geology and the Blind River (Elliot Lake) uranium deposits

    By James A. Robertson

    "In the Blind River area Proterozoic clastic and sedimentary rocks and minor volcanic rocks (The Huronian Supergroup) uncomformably overlie and trangress northwards over dominantly granitic Archean te

    Jan 1, 1986

  • CIM
    Electrical Drives for Large Grinding Mills

    By A. G. Spencer

    "The horsepower required to drive large grinding mills has increased dramatically during the past ten years. Limitations on the amount of power which may be transmitted by a single gear and pinion hav

    Jan 1, 1972