Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology

    By S. Pinard, J. MacLellan, G. Ehlert

    "The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin

    Jan 1, 1992

  • CIM
    Sulphur Compounds and Metal removal using Bioprocess Technology

    By Andre L. De Vegt, Cees J. N. Buisman

    "For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st

    Jan 1, 1997

  • CIM
    Rock Mechanics Aspects of the Use of Underhand Cut-and-Fill Paste Sill Pillars: Case Studies

    By Paul Hughes

    This paper summarizes current underhand paste backfill mining as applied to Goldcorp Inc?s Red Lake Mine, Newcrest Mining Ltd?s Kencana Mine and the Lanfranchi Nickel Mine as well as ongoing research

    May 1, 2011

  • CIM
    Prospection Alluvionnaire (Minéraux Lourds)en Gaspésie- Traitement des Donnés et Comparaison Avecles Résultats Géochimiques en Sédiments de Ruisseau

    By Robert L. Tremblay

    Dans le but de voir si une région comme la Gaspésie, qui a subi la derniere glaciation , se prête avantageusement à la méthode de prospection alluvionnaire, environ 800 concentrés de minéraux lourds f

    Jan 1, 1978

  • CIM
    The Metallgesellschaft Research Laboratories, Some Aspects

    By G. S. Farnham

    Abstract This paper lists the interests of the Physical Metallurgy and Chemical Research laboratories of the Metallgesellschaft, which were visited by the authors, members of a group of Canadian in

    Jan 1, 1946

  • CIM
    Milling at Agnico-Eagle Gold Mines Limited

    By K. Mikulash

    "Agnico-Eagle Mines Limited is located at Joutel in North-Western Québec. The mine is about four miles north-west from the town on the left bank of the Harricana River. The present mining is 1,800 fee

    Jan 1, 1976

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    System Analysis and Simulation of Narrow Vein Mining Method with Underground Pre-concentration

    By Mario Morin

    The application of underground pre-concentration technology to narrow vein mining has the potential to change the entire economics of bulk mining methods when used in narrow vein situations. The rejec

    Oct 1, 2004

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )

    By Trevor Yeomans

    "NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o

    Jan 1, 2008

  • CIM
    A MultiGaussian Approach to Assess Block Grade Uncertainty

    By Julián M. Ortiz

    Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a

    May 1, 2004

  • CIM
    Paste Fill Plant Operation at the Louvicourt Mine

    By Benoit Bissonnette

    "The need for production of a competent fill was recognized early by the project partners. Consequently, a 4000 Ud paste fill plant was constructed and commissioned in early August 1994.In order to fi

    Jan 1, 1996

  • CIM
    Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines Limited

    By P. D. R. Maltby

    "With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to

    Jan 1, 1984

  • CIM
    Mineral Processing Education in the United States

    By Kathleen A. Altman

    "This paper supplements the information provided annually at the Canadian Mineral Processors Operators Conference regarding the education of Mineral Processors in Canada. The purpose of the paper is t

    Jan 1, 2008

  • CIM
    Managing Tailings Facilities for Continual Improvement

    By Elizabeth Gardiner

    Tailings and water management facilities are integral components of mine and mill operations. They must be managed for the long term to ensure that safe and environmentally responsible stewardship is

    May 1, 2003

  • CIM
    Anomalies des propriétés de la matière organique et des assemblages argileux associés au gîte de Pb-Zn de Gays River, Nouvelle-Écosse, Canada

    By Y. Héroux, A. Chagnon, M. M. Savard

    "Résumé- Le gîte de Pb-Zn de Gays River s'accompagne d'anomalies des propriétés de la matière organique (MO) et des assemblages de minéraux d'argile (AMA). L'association entre la m

    Jan 1, 1994

  • CIM
    Reduction of Free Gold Losses in the Cleaner Circuit with the Installation of a Gravity Circuit at the Kemess Mine

    By Martin Froehling, Curtis Mohns, Rahim Rajwani, Michael Fullam

    "The Kemess mining and milling complex is operated by Northgate Minerals Corporation and is located in the mountains of north-central British Columbia, 430 kilometers northwest of Prince George. The c

    Jan 1, 2007

  • CIM
    Activated Carbon’s Use in Gold Adsorption and Recovery (Presented with Consideration to the Operator’s Point-of-View) Scotia International of Nevada, Inc

    By Michael Drozd

    "The operation of an activated charcoal system has five separate unit operations. These unit operations have common points for CIP, CIL and CIS system, which vary widely in application.The unit operat

    Jan 1, 2008

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976