Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Field Performance of Fully Encapsulated Reinforcement during Violent Failure Events

    By E Villaescusa, C Drover

    Fully resin encapsulated threaded bar and cement grouted cable bolts are common forms of reinforcement for underground mining excavations constructed at great depth. These elements are frequently inst

    May 9, 2016

  • AUSIMM
    The Ultimate Sustainability of Mining - Linking Key Mega-Trends with 21st Century Challenges

    The widely accepted concept of mineral resources are that they are finite - mining therefore being intrinsically unsustainable. Yet the modern global mining industry continues to grow production at st

    Jun 1, 2010

  • AUSIMM
    Australia’s Potential for Nickel Sulfide Ore Systems – A New Continental-scale Time-space Framework for Exploration

    By R G. Skirrow, M Cooper, J Claoué-Long, K Czarnota, H Dulfer, J Thorne, D C. Champion

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Tholeiitic intrusion-hosted nickel (PGE-Cu) sulfide deposits are under-represented in Austr

    Mar 18, 2015

  • AUSIMM
    Development and Construction Update of the Grasberg Block Cave Mine

    By A T. Yuniar, C A. Brannon, N D. Pascoe, H H. Firdausi

    This paper describes the key components of the Grasberg Block Cave (GBC) mine design and the development and construction status of the mine. Drawpoint production from GBC will be initiated in 2018 fo

    May 9, 2016

  • AUSIMM
    Sustainable Water Supply Development in Central South Australia

    OZ Minerals Limited owns and operates the Prominent Hill Copper-Gold Mine, located 140 km southeast of Coober Pedy in far north South Australia. The Prominent Hill mine comprises an open cut mine with

    Jun 1, 2010

  • AUSIMM
    Controlling Factors in the Assay of Silver by Cupellation

    Silver is one of the three major metals produced from the Broken Hill mines. The accurate determination of the silver in these ores, therefore, is of economic importance.With due appreciation of the d

    Jan 1, 1940

  • AUSIMM
    Strategic Research Support for the Mining Industry - The Role of the Australian Centre for Minesite Rehabilitation Research

    The Australian Centre for Minesite Rehabilitation Research (ACMRR) was established through a mining industry initiative to meet the need of industry, governments and the community for sustainable syst

    Jan 1, 1995

  • AUSIMM
    Violent Rupture of Mid-Crustal Barriers by Fluidised Breccia (Cloncurry Fe-Oxide-Cu-Au District, Australia): Implications for Cu-Au Mineralisation and Kimberlites

    By L R. Marshall, M J. Rubenach, T G. Blenkinsop, J S. Cleverley

    The source and transport regions of fluidised (transported) breccias outcrop in the Cloncurry Fe-oxide-Cu-Au district, providing insights into the origins of other fluidised magmatic-hydrothermal brec

    Jan 1, 2005

  • AUSIMM
    Removal of As(III) and As(V) in Aqueous Solution

    Removal of As(III) and As(V) in Aqueous Solution There are toxic arsenical species such as As(III) and As(V), and arsenious species have specially strong toxicity. The strong toxicity causes contamin

    Sep 13, 2010

  • AUSIMM
    Radiometric Disequilibrium Analysis of the Carnotite Uranium Deposit at Yeelirrie, Western Australia

    By Fisher N. I

    Disequilibrium ratios (U3O8/eU3O8), which assess the degree to which gamma activity represents the uranium content of a sample, have been measured on a representative set of samples from the ore zone

    Jan 1, 1980

  • AUSIMM
    Mineral Resource Assessment of the Coromandel Region, New Zealand

    By D N. B Skinner, R L. Brathwaite, M S. Rattenbury

    The Institute of Geological and Nuclear Sciences Ltd has carried out a mineral resource assessment of the Coromandel region, one of the most mineral-rich regions of New Zealand. The assessment focusse

    Jan 1, 2001

  • AUSIMM
    Underground Mining Methods at Mount Morgan, Queensland

    OWING to two large falls of ground which resulted in serious accidents occurring towards the end of 1908, it became evident that the "open chamber" system then in use was unsuitable for the

    Jan 1, 1910

  • AUSIMM
    Optimising multivariate variographic analysis with information from multivariate process data modelling (partial least squares regression)

    By L O. Filippov, Q Dehaine

    Variographic analysis, a classical tool from the Theory of Sampling (TOS), can address practical situations with multiple variables; however, its application has very often been limited to one variabl

    May 9, 2017

  • AUSIMM
    Separation of ultra-fine particles using the REFLUX™ Graviton

    By J L. Carpenter, S M. Iveson, K P. Galvin

    Wet beneficiation of iron ore fines less than 1 mm typically involves a desliming stage ahead of the fine gravity separation such as spirals. The desliming is achieved using a bank of cyclones. The re

    Jul 24, 2017

  • AUSIMM
    TankCell Flotation at SamarcoÆs Germano Concentrators

    By B Murphy, A Uliana, P STrgio de Oliveira, G Ara·jo de Souza Franco, T Miettinen

    Outotec has performed numerous research and development projects and various surveys in the study of reverse iron ore flotation. Over the past four years their TankCell-70 and TankCell-160 flotation c

    Aug 12, 2013

  • AUSIMM
    Spray Nozzles in Colliery Dust Suppression

    The efficiency of water sprays in suppressing airborne colliery dust depends on many variable factors. A survey of previous work in this field shows that swirl spray nozzles are the best dust suppress

    Jan 1, 1964

  • AUSIMM
    Study on a Novel Polymer/Bentonite Compound Adsorbent for Removal of Cu(II) from Aqueous Solution

    Study on a Novel Polymer/Bentonite Compound Adsorbent for Removal of Cu(II) from Aqueous Solution

    Sep 13, 2010

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • AUSIMM
    Shaft Plumbing at Mount Isa

    In the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can

    Jan 1, 1940

  • AUSIMM
    WAD Cynoprobe - A Case Study for the Development of an Online Weak Acid Dissociable (WAD) Cyanide Measurement Device

    By P Lotz

    With the recent increase in environmental awareness, gold mining companies are fast becoming signatories of the International Cyanide Management Code (ICMI, 2007). The objective of the Code is to impr

    Jan 1, 2007