Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Breaking and Handling at The C.S.A. Mine, Cobar

    Parallel lenticular orebodies occurring at the C.S.A. mine of Cobar Mines Pty. Ltd. are mined by mechanized cut and fill stoping over the full strike length. Access is provided for each stope lift fro

    Jan 1, 1969

  • AUSIMM
    The Use of Animated Dynamic Simulation in Mining and Mineral Processing

    The paper discusses the use of animated dynamic numerical simulations to support design and operational decisions in the mining industry. The basis of the simulations discussed is a queuing theory eng

    Jan 1, 2009

  • AUSIMM
    Importance of Early Rehabilitation Planning - Case Studies from North West Queensland

    By M J. Gillespie, P D. Erskine

    Mine site rehabilitation generally includes the re-shaping of overburden to create a final landform, manipulation of substrates and subsequent revegetation. Due to the wide range of environmental vari

    Jul 10, 2012

  • AUSIMM
    Fundamental Technology Change in the Iron and Steel Industry

    The world is getting flatter through internet, mobile phone technology, relatively low cost travel, massive outsourcing of manufacturing to China and the transfer of company backroom operations to Ind

    Jan 1, 2006

  • AUSIMM
    Timbering Methods at the North Mine - North Broken Hill Limited

    The, Ore-bodies.-The ore-bodies of the North mine, North Broken Hill Ltd.; consist of two lenses, connected by a narrow neck of mineralized country. They pitch at an angle of 40° in an easterly d

    Jan 1, 1940

  • AUSIMM
    Large Flotation Cell Size and Circuit Arrangement Selection

    By Churchill M

    One of the significant changes which has occurred in the flotation sector of the minerals industry, over the last two decades, has been the successful development of the very large flotation machine

    Jan 1, 1991

  • AUSIMM
    Process Control and Flocculant Optimisation of Tailings Thickeners at PT Freeport

    By M Simanjuntak, A M. Supomo

    PT Freeport IndonesiaÆs copper/gold operation disposes of approximately 222 000 dry metric tonnes of tailings per day via two thickeners. Reduction of the flocculant dosage rates in each of the tailin

    Jan 1, 2003

  • AUSIMM
    Commissioning the Preparation Plant at the Newlands Coal Mine

    The process and control technologies incorporated into the coal preparation plant at Newlands were to be used for the first time in Australia. The commissioning organisation and procedures were se

    Jan 1, 1986

  • AUSIMM
    Heat Transfer in Layered Packed Beds

    By Newell R

    The influence of layering on the rate of heat transfer through a packed bed consisting of particles of two different sizes and heat capacities has been determined by measuring the heat front veloc

    Jan 1, 1987

  • AUSIMM
    The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.

    The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq

    Jan 1, 1978

  • AUSIMM
    Effect of Sample Density and Configuration on the Accuracy of Reserve Estimation (Abu Tartur Area, Western Desert, Egypt)

    By Rashad MZ

    The evaluation of ore deposits consumes much effort, cost and time, hence research work must aim to minimize these inputs with no loss of accuracy. The present study is devoted to assess the optimum

    Jan 1, 1987

  • AUSIMM
    Management of Mine Water Integrated to Mining Systems

    By Owen D

    A central part of mine planning is to ensure the protection of the beneficial uses of water. Integrated mining software does not generally provide tools to help the mining engineer to achieve this o

    Jan 1, 1995

  • AUSIMM
    Blast Practice and Geotechnical Implications

    A blast is designed to completely break competent rock such that it can be economically extracted, and efficiently handled or processed. Efficient breakage of the rock is critical to the success of an

    Jan 1, 2004

  • AUSIMM
    Blast Roasting Practice in the Treatment of Lead Ores

    IN the present paper it is the writer's intention to largely confine the subject-matter to details relating to the metallurgical practice in connection W,ith the blast roasting of lead ores at th

    Jan 1, 1922

  • AUSIMM
    Blast Design System

    ICI Australia has been developing PC-based software to assist the blast engineer to design and monitor open pit blasts. The scope of this software differs significantly from commercially available min

    Jan 1, 1992

  • AUSIMM
    The Challenges for Mining Posed by Emerging Water Protection Legislation in Former Soviet Union Countries

    Mining projects have long since presented challenges for the protection of the water environment. Lessons learnt from historical pollution incidents and increasingly stringent environmental controls h

    Jan 1, 2006

  • AUSIMM
    Quantification of Mine-Related Effects on Streamflows

    By W Boughton, L Gilbert

    The Australian Water Balance Model (AWBM) has found widespread use in Australia in estimating the streamflow behaviour of catchments. It has been used at the Ridgeway Gold Mine, in central west New So

    Jan 1, 2006

  • AUSIMM
    Mine Ventilation at Renison Limited

    By Ross T. J

    Renison Limited operates an underground tin mine employing both cut and fill and open stope methods, at Renison Bell on the west coast of Tasmania. Mining in the region commenced in the 1890'

    Jan 1, 1988

  • AUSIMM
    Managing Seismic Hazards in a Narrow Vein Underground Operation

    The Kundana underground narrow vein gold mine had a recent history of large and damaging seismic events. Following a period of seismic events on 30 July 2001, in which nine miners were temporarily ent

    Jan 1, 2005

  • AUSIMM
    Raise Bored Shafts in Decline Mines

    Western Mining Corporation (WMC), managers of the Windarra Nickel Project, installed a raise-bored haulage shaft and underground crushing system at the Mt Windarra Nickel Mine in 1982. The system is t

    Jan 1, 1984