Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Beneficiation of a Turkish Bastnaesite Ore with Associated Fluospar and Barite

    By Ghiani M, Currelli L, Fuganti A

    the results of an experimental study aimed at beneficiating a complex ore containing bastnaesite and other rare-earth minerals, with associated barite and fluospar are illustrated. Owing to its mine

    Jan 1, 1993

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Reducing Carbon Dioxide Emissions From Mount Isa Operations

    Until early-1997, Mount Isa Mines Limited (MIM) generated electrical power for most of north-west Queensland. The discoveries of many new orebodies in the region meant the inevitable increase in power

    Jan 1, 1998

  • AUSIMM
    A Simple and Proven Technology for Reclaiming Acidic Mine Waters

    By B Mack

    The cost of water treatment is now more than ever a major consideration for maintaining an environmentally and economically sustainable mining operation. As an industry, we often have to consider wate

    Jan 1, 2009

  • AUSIMM
    Development of a Corrosivity Classification for Weld Mesh Support at Cannington Mine

    Cannington Mine is an underground, hard rock, metalliferous mine located in North-Western Queensland, Australia. Weld mesh is installed to prevent the failure of rock from between the installed reinfo

    Nov 25, 2010

  • AUSIMM
    Dynamic grade control modelling processes at the Waihi Underground Gold Mine

    By A Whaanga, W Vigor-Brown

    IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T

    Mar 22, 2022

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023

  • AUSIMM
    Recent Advances in Geophysical Tools

    This paper reviews recent advances in geophysical tools for mineral exploration. It does not restrict comments to methods which are usually applied in the tectonically active belt surrounding the Paci

    Jan 1, 2004

  • AUSIMM
    A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand Tunnels

    By T Ireland, B Wright, S Weaver

    All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei

    Sep 17, 2014

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • AUSIMM
    Martabe Gold Mine, Indonesia: a positive solution for positive reconciliation

    By M Angus, S Konopa, A Virisheff, S Crispin

    A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther

    Nov 21, 2018

  • AUSIMM
    Forecasting Life-of-Mine Deformation and Seismic Potential at Rosebery Mine Using a Mine Scale Non-Linear Numerical Model

    By W Zirima

    A detailed, mine scale non-linear numerical model of Rosebery mine has been built for the purpose of simulating life-of-mine global deformations. The model was calibrated using observations of displac

    Jan 1, 2008

  • AUSIMM
    Implicit Modelling Applied to Grade Control Data

    By J Ireland, S Rose

    The main outcomes of mining grade control include defining the boundary between ore and waste and then categorising the ore according to which stockpile it should be sent. A typical workflow includes

    Aug 18, 2014

  • AUSIMM
    MMG’s Australian Operating Model – the Implementation, Successes and Learning

    By R M. S Watsford, M Davis

    In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening

    Jun 22, 2016

  • AUSIMM
    Inclusion of Safescape Laddertube to enhance emergency egress in ventilation shafts

    By B Murphy

    Safescape Laddertube provides an improved system for emergency egress in ventilation shafts. The addition of Laddertube in a rise has very little impact on ventilation flow, studies have indicated th

    Oct 12, 2022

  • AUSIMM
    Improving Open Stope Productivity at Sunrise Dam

    By K Guilfoyle

    AngloGold Ashanti Australia Ltd operates an underground mine below a large open pit at the Sunrise Dam Gold Mine near Laverton in Western Australia. Operations are based on an extensive mineralised zo

    Nov 8, 2011

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Computational Simulation for Mineral Processing

    By Jancar T, de Guzman M M, Matthews B, Tu J. Y

    The use of computational simulation to predict the performance of existing equipment or for the design of improved mineral processing equipment will be referred to as Computational Mineral Processi

    Jan 1, 1995

  • AUSIMM
    Magnetite-Cu-Au Deposits in Deeply Eroded Magmatic Arcs: Lessons from Proterozoic Terrains (c7b445dd-94d3-4396-a3c1-380507204f09)

    By Adshead ND, Blake KL, Rotherham JF, Rotherham M, De Jong G

    Magnetite deposits with distinctive ¦ actinolite ¦ apatite -bearing gangue and spatially-extensive sodic-calcic wall rock alteration occur in both Proterozoic metamorphic terrains and Mesozoic-Tertia

    Jan 1, 1995