Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Roasting for antimony removal from Greenbushes materials-laboratory studiesBy Floyd JM, Bultitude-Paul J
The development of a process for the extraction of antimony from materials produced by Greenbushes Tin Limited has been carried out based on theoretical and laboratory studies. The materials treat
Jan 1, 1986
-
Initiating-Systems for Underground Mass Firings Using Large Diameter BlastholesBy Rashleigh C
The selection and application of an effect- ive firing system first require a clear under- standing of the initiating abilities of the com- ponents in such systems. The conditions under which charges
Jan 1, 1978
-
Notes on the Delayed Method of Stope Filling at Mount Isa Mines LimitedIntroduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass De
Jan 1, 1953
-
Integrated Whaleback Planning and Scheduling SystemVarious software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback o
Jan 1, 1986
-
The Application of Rock Mechanics to Mining at Renison LimitedDuring the past 18 months a rock mechanics project has been in operation at Renison Limited. The project was established to identify and investigate key problem areas that would affect future prod
Jan 1, 1982
-
The Partition of Sulphur and Silicon in the Iron Blast FurnaceBy Cripps-Clark CJ
Sulphur partition between metal and slag has been examined on a cast-by-cast basis for BTIP furnaces. Partition values. were calculated from thermodynamic equilibrium data together with oxygen act
Jan 1, 1980
-
Evaluation of Quality Parameters for Assessment of Steaming Coal UtilisationBy Dyne GD
From experience in the design and operation of power station combustion facilities in most mainland Australian States, involving a wide range of black coals and lignites, and in the specification
Jan 1, 1983
-
Problems of Forecasting Metal PricesThere are serious problems in forecast- ing accurately and achieving this goal depends on good quality information, correct assumpt- ions and sound analysis. planner. The forecaster must focus attent
Jan 1, 1983
-
Iron Island, Queensland.By Campbell Brown G A
IN 1904-5 diamond drilling operations in the Mount Morgan mine proved the presence of some millions of tons of rich copper-gold ore, averaging about 45%to 50%silica and 22%Fe as sulphide. To smelt thi
Jan 1, 1911
-
The Five-Cycle Pattern in a Dynamic System of Two-Fold Symmetry in Geologylbis new concept in geology is introduced by a reinteipretation of the Archaean stratigraphy of the greenstone belts of the Yilgarn Craton of Western Australia. Evidence is presented to show that the
Jan 1, 1994
-
A Study of Floor Heave in the Mines of the Southern Coalfield of New South Wales by Two Dimensional Finite Element ModellingBy Seneviratne SP
The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. A
Jan 1, 1992
-
The Role of Cyanide in the Elution of Gold from Activated CarbonBy Lorenzen L, Van Der P F
It is the aim of this paper to review recent research in understanding the role of cyanide in the elution of gold. Under conditions of severe pre-treatment (high temperatures and levels of cyanide), t
Jan 1, 1992
-
Implementation of Flash Flotation in the Ok Tedi Grinding CircuitBy Erepan P. C
Flash flotation technology was introduced by Outokumpu in 1985. Considerable success was achieved in other plants with similar operations to OTML. Conclusions from site visits and amenability tests
Jan 1, 1997
-
Assessment of Mechanical Parameters of Rock using an Indentation TestBy Donald D
A number of standard tests are conventionally carried out to characterise strength properties of rock. The values of the parameters obtained are often affected by planes of weakness or defects in ro
Jan 1, 1996
-
Geometallurgical Modelling – A Mineral Processor's PerspectiveBy A Stradling
For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can
Sep 5, 2011
-
Investigation and Construction of Tunnels in Tamalia Limestone, Perth, Western AustraliaBy Klenowski G, Gilmour G. A
The Metropolitan Water Supply, Sewerage and Drainage Board, Perth, has recently con- structed two major sewerage tunnels in the metropolitan area and a further one is under construction. These tunne
Jan 1, 1981
-
The Fan Installation at Laleham CollieryUnderground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el
Jan 1, 1983
-
Mineralogical Evaluation of PGE Behaviour in Fe-Ni-S and Cu-Ni-S Mattes and Fayalite Slag: Geological ImplicationsBy Selischop F, Tredoux M
The distribution of platinum-group elements (pGEs) has been investigated in matte and slag samples from Waterval Smelter (Rustenburg Platinum Mines). The study showed that a strong preference of PGEs
Jan 1, 1994
-
Sampling Practice at the Vera Nancy Gold MineThe efficient and profit-maximising daily and long-term management of the Vera Nancy resource depends on decisions based upon assay data. This paper examines the range of sample sources, the methods o
Jan 1, 2000
-
Computer Methods for Mine Geology at HellyerBy Kuipers A. J
Aberfoyle has been applying computer methods to mine geology in small to medium-sized underground mines since the early 1980's. Recently, the installation of DATAMINE software at the Hellyer Mine
Jan 1, 1990