Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Opportunities for Integrated Mine Management to Minimise Risk and Create Value

    By D Rattray, D Macfarlane, I Robb, N Halpin, G T. Dale

    Mining faces many environmental, social and regulatory liabilities of which water management is just one. Others include site rehabilitation, carbon emissions, biodiversity offsets, strategic cropping

    Nov 26, 2013

  • AUSIMM
    Flow Behaviour of High Solids Brown Coal-Water Suspensions as Liquid Fuels

    By Christie GB, Mainwaring DE, Leong YK

    High solids brown coal slurries have been prepared with concentrations approaching those achieved with bituminous black coals. The high inherent water content and macroporosity of Victorian brown

    Jan 1, 1987

  • AUSIMM
    Swedish Slot Raise Drilling Method at the Louvicourt Mine

    The Louvicourt Mine is located 600 km north of Montreal in the province of Quebec, Canada. The owners are Aur Resources Inc (30 per cent), mine operator, Novicourt Inc (45 per cent) and Teck Corporati

    Jan 1, 2002

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    Environmental Impact Assessment For A Silica Sand Quarry In A New South Wales Coastal Recreation Reserve

    By Longworth C. R

    Competing requirements for land usage sometimes make the correct all- ocation difficult. The decision can be complicated by many factors such as local resident pressure, previous government decisio

    Jan 1, 1976

  • AUSIMM
    Practical Implicit Geological Modelling

    By H J. Ross, R K. Beatson, T J, W R. Fright

    Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be

    Jan 1, 2003

  • AUSIMM
    Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

    By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu

    Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the

    Nov 30, 2018

  • AUSIMM
    Steaming Coal Evaluation by Pilot Combustion Testing

    The Australian Coal Combustion Testing and Research Facility has been operating commercially for one year and during that period coal product evaluations have been conducted on behalf of four coal

    Jan 1, 1987

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    Recent Experiences at the Kangaroo Flat Mine, Bendigo

    By M Hernan

    Bendigo Mining Limited has established a modern underground gold mine and processing plant at Bendigo in central Victoria. The Bendigo goldfield produced around 22 000 000 oz of gold between 1851 and

    Jan 1, 2008

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018

  • AUSIMM
    Methods and Approach to Exploration for Hard Rock and Alluvial Gold in Indonesia

    By Dods G. H, Hewitt W. V

    Ashton Mining Limited is currently one of the active companies undertaking gold exploration in Indonesia. Presently 7 Contract of Work areas are being explored for hard rock and alluvial gold. Hard

    Jan 1, 1991

  • AUSIMM
    The Planning and Methods Used at Selby in the Design of High Productivity Systems

    British Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th

    Jan 1, 1991

  • AUSIMM
    Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold Mine

    By P Trout, B Macaulay

    Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success

    Jan 1, 2005

  • AUSIMM
    Water Quality Changes After Partial Site Remediation at Tui Mine Site, Mt Te Aroha

    By J G. Webster-Brown

    The Tui Mine is located near Te Aroha at the base of the Coromandel Peninsula. It was a lead-zinc mine, which closed in 1973 due to declining concentrate prices, high overheads, and high mercury level

    Jan 1, 2007

  • AUSIMM
    Simulation Model of Gas Injection Aided Dewatering in Underground Mining

    By Kesser Z, Vincze T

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988