Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Studies on Extraction of Refractory Gold and Silver Through Thiourea Leaching

    By Akerkar D. D, Dey M. L, Mathur S. B, Chowdhury S. K R

    The extraction of gold and silver from chalcopyrite concentrates has been investigated. In view of the recent interest in non-cyanide leachants for gold and silver, one such alternative reagent, nam

    Jan 1, 1992

  • AUSIMM
    Mining Practice in the South Alligator Valley

    This paper outlines mining practice in the South Alligator valley between 1954 and 1964. The valley is situated in the Northern Territory 130 miles south east of Darwin and trends north west. The ce

    Jan 1, 1968

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate

    By V Matousek, A Sellgren, R Visintainer, G McCall

    A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a

    Nov 8, 2021

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    The Thermodynamics of Zinc Oxide in Iron Silicate Slags

    By Lee H. G, Li H, Hayes P

    Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced

    Jan 1, 1993

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    The Practicalities of Monte Carlo Type Risk Analysis in Mining Projects

    The profitability of individual ore blocks can be classed as clearly profitable, clearly not profitable, and those in between which are by nature quite sensitive to their major cost and revenue driver

    Jan 1, 2002

  • AUSIMM
    Benefits of Due Diligence in Private Equity Mining Investments – Maximising Value and Unearthing Common Risks

    By P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Mining and exploration properties have a unique set of technical risks. Privately-owned com

    Mar 18, 2015

  • AUSIMM
    Shaft Sinking and Drifting with Special Reference to Coal Mining in the Southern District of New South Wales

    Since the discovery of coal of the Southern coalfield (Illawarra 1797, Burragorang 1806) coal mining has grown progressively to the thriving industry of today. Early shallow escarpment mining requ

    Jan 1, 1976

  • AUSIMM
    Evaluation of Precision being Obtained by a Three-Stage Sampling System for Coal

    By C D. Rose

    "The primary objective of this paper is to demonstrate a different approach to predicting and verifying mechanical sampling system precision. Early in the year 2011 an experiment was conducted to eval

    Aug 21, 2012

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Steel Wire

    The man in the street (and no doubt most members of the Institute) thinks of wire, if he gives it any thought at all, as a most commonplace commodity. It is an accepted necessity, and like most necess

    Jan 1, 1947

  • AUSIMM
    Planning, Investigation and Design of the Burwood Beach Ocean Outfall, Newcastle NSW

    By Osorio J. D C, McMahon M. D

    Burwood Beach Sewage Ocean Outfall is being constructed by the Hunter District Water Board as part of an amplification scheme to eliminate pollution from adjacent bathing beaches. The outfall cons

    Jan 1, 1987

  • AUSIMM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimisation on a Milling Circuit

    By G T. Jemwa, F Rousseau, F J. Wolfaardt, J A. M Rademan, P W. Smit

    Mining companies are increasingly faced with the challenge of reducing operating costs while maximising throughput and profitability. At the same time, the grade and quality of treated ores are becomi

    Sep 26, 2013

  • AUSIMM
    Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation

    By A Mooney, J Marsden, H Grosser, G Dunstan

    Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho

    Mar 15, 2021