Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    Identifying and Dealing with Outliers in Resource Estimation

    By C De-Vitry

    In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data

    Aug 18, 2014

  • AUSIMM
    Underground Ore Handling Systems

    By B Olsson, C Glassock

    Computer simulation modelling (discrete event) has been used at Olympic Dam (OD) to model the handling of ore from the point of extraction at the stope drawpoint through to the ore stockpile on the su

    Jan 1, 2005

  • AUSIMM
    General Approaches to the Design of Underground Openings

    The elements of consistent structural de sign models for underground structures are explained. Such models should comprise at least ground properties, excavation and support methods, computational

    Jan 1, 1987

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Successful Geostatistical Approach for a Nickel Ore Deposit – A Case Study for Nickel Laterite Deposit in Central I Pit, Kabaena Nickel Mine, Kabaena Island, Southeast Sulawesi, Indonesia

    By V Yadi

    Geostatistics has been widely used for more than four decades as a powerful tool in ore resource/reserve estimates and grade control. This method has gradually replaced the conventional method such as

    Aug 22, 2011

  • AUSIMM
    Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western Australia

    By A D. Caccioppoli

    Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits

    Aug 22, 2011

  • AUSIMM
    Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technology

    By P Jere

    Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons

    Mar 29, 2023

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • AUSIMM
    Pisolitic Limonite Deposits in Northwest Australia

    By Morgan B. D

    Since the mid 1950s, limonite deposits of a new type have been found in the northwest of Western Australia. The deposits consist of extensive fossil valley fillings up to several hundred feet in depth

    Jan 1, 1964

  • AUSIMM
    Applying Modular Transporters to Relocate Large Hydraulic Excavators

    By B Flynn, P Knights

    Low-loaders or 'floats' for relocating equipment in surface mines are limited to a capacity of approximately 350 t. In the iron ore industry it is desirable to be able to rapidly relocate ex

    Jan 1, 2009

  • AUSIMM
    An Innovative Approach to Robust Optimisation for Scenario-Based Mineral Project Evaluation

    By S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye

    Uncertainty about the future and orebody should significantly impact evaluation of mining projects. Scenario planning, widely used in other industries, for example in the petroleum industry, can provi

    May 24, 2012

  • AUSIMM
    Predicting Finished Product Properties in the Mining Industry from Pre-Extraction Data

    By J E. Everett

    An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of

    Sep 5, 2011

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    On-Stream and Bulk Analysis of Iron Ores

    In response to requests from the iron ore mining industry, the Commonwealth Scientific and Industrial Research Organisation (CSIRO) Division of Mineral Physics has developed a number of bulk analysis

    Jan 1, 1985

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?

    By C Killip

    Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f

    Nov 4, 2015