Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Relation Between Faulting and Mineralization at the Cowarra Gold Mine in New South WalesThe Cowarra gold mine is at latitude 36°O'S. and longitude 149°19'E. which is roughly 20 miles north-north-east of Cooma.The deposit was· originally worked towards the end of
Jan 1, 1965
-
Archaean Gold Systems of South AustraliaBy A Reid
The Late Archaean of South AustraliaÆs Gawler Craton contains significant potential for gold resources. The main targets of interest are migmatised gold style systems of which the Challenger deposit i
Jan 1, 2007
-
Macraes Gold Mine - Continuous Improvement of a Refractory Gold Treatment PlantBy S R. La Brooy, T Giraudo, I C. Ritchie
The treatment plant at the Macraes Gold Project in New Zealand processes a carbonaceous, refractory sulphide gold ore. Since its commissioning in 1990, there has been a programme of continuous improve
Jan 1, 1998
-
Underground Mining at the Golden Cross MineThe modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye
Jan 1, 1994
-
The Pre-concentration of Precious and Base Metal Deposits Using the Inline Pressure Jig – Higher Feed Grades and More MetalBy G J. Delemontex, N J. Grigg
Pre-concentration of precious metal and base metal ore types is becoming more relevant with the discovery, development and operation of many lower grade deposits around the world. The fluctuations in
Sep 7, 2015
-
Integrated Mine Evaluation ù Implications for Mine ManagementBy M Armstrong, S J. Coward, A Galli
Mine management is often expected to make rapid evaluation decisions at different stages of projects based on limited and uncertain data. The challenge is exacerbated by having to distil technical com
Jan 1, 2006
-
Real Time and In Situ Measurement of Elemental Composition Using LasersReal Time and In Situ Measurement of Elemental Composition Using Lasers
Sep 13, 2010
-
Flotation Plant Modelling and Simulation Using the Floatability Characterisation Test Rig (FCTR)Modelling and simulation are important aspects of flotation research, which may assist in the design of new circuits and the optimisation of existing ones. Flotation research in the AMIRA P9 project h
Jan 1, 2000
-
The New Updraught Sinter Plant at Mount Isa Mines LimitedAs part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The
Jan 1, 1968
-
The effect of high geo-temperature environment on spontaneous combustion – an experimental studyBy Y Xiao, C Lei, C Shu, W Wang, K Wang, J Deng
To investigate the effect on coal spontaneous combustion with high geo-temperature, an experimental apparatus was developed to measure characteristic parameters of two kinds of coal samples at differe
Aug 28, 2017
-
Safety at the Broken Hill Proprietary SteelworksBy McLennan R. G
The principle of personal safety is as old as the human race. The application of this principle to industry is of much more recent origin, and may be said to be almost exclusively the product of the t
Jan 1, 1957
-
Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines OperationBy T Howard, J E. Everett
BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc
Jan 1, 2002
-
Production Capacity Optimisation in the Presence of Grade UncertaintyGrade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation
Dec 6, 2010
-
Risk "Thinking" for Australian TunnellingA paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in
Jan 1, 2008
-
Cyclone Process for Heavy Metals Decontamination of SedimentsCyclone Process for Heavy Metals Decontamination of Sediments
Sep 13, 2010
-
A comparison of X-ray and electron-based analysis techniques for characterising the mineralogy and alumina distribution in iron oresBy M I. Pownceby, C M. MacRae, A Torpy
Electron probe microanalysis (EPMA) and quantitative X-ray diffraction (QXRD) techniques are capable of providing high-quality quantitative information regarding the phase mineralogy and distribution
Jul 24, 2017
-
Flow of Compressed Air in PipesCOMPRESSED air is held in high esteem by the mining engineer as a medium for the transmission of power. The transmission, however, is accompanied by a high percentage of loss. Of the total work done b
Jan 1, 1918
-
Accumulation of Trace Elements into Black Shale – How to Identify a Viable Source Rock for Orogenic and Carlin-style Gold DepositsBy E Lounejeva, J A Halpin, A Chappaz, D D. Gregory, S Wu, T Lyons, P J. Sack, R R. Large, S W. Bull
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Newly published models suggest that some orogenic and Carlin-style gold deposits formed by
Mar 18, 2015
-
Keeping the Lights On! High Risk Blasting at Boddington Gold MineBy D Rubery, C Croker
The Boddington Gold Mine (BGM) is located 120 km south east of Perth, Western Australia. The operation is managed by Worsley Alumina Pty Ltd and mined by contractor Henry Walker Eltin (HWE). The mine
Jan 1, 2002
-
Past and Future Parameters for Mining the Otago Alluvial Gold DepositsThe early records of hydraulic elevator and bucket ladder dredging in the Clutha River system indicate the success of that era of alluvial gold mining in Otago. This paper briefly reviews parameters o
Jan 1, 1992