Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Relation Between Faulting and Mineralization at the Cowarra Gold Mine in New South Wales

    The Cowarra gold mine is at latitude 36°O'S. and longitude 149°19'E. which is roughly 20 miles north-north-east of Cooma.The deposit was· originally worked towards the end of

    Jan 1, 1965

  • AUSIMM
    Archaean Gold Systems of South Australia

    By A Reid

    The Late Archaean of South AustraliaÆs Gawler Craton contains significant potential for gold resources. The main targets of interest are migmatised gold style systems of which the Challenger deposit i

    Jan 1, 2007

  • AUSIMM
    Macraes Gold Mine - Continuous Improvement of a Refractory Gold Treatment Plant

    By S R. La Brooy, T Giraudo, I C. Ritchie

    The treatment plant at the Macraes Gold Project in New Zealand processes a carbonaceous, refractory sulphide gold ore. Since its commissioning in 1990, there has been a programme of continuous improve

    Jan 1, 1998

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994

  • AUSIMM
    The Pre-concentration of Precious and Base Metal Deposits Using the Inline Pressure Jig – Higher Feed Grades and More Metal

    By G J. Delemontex, N J. Grigg

    Pre-concentration of precious metal and base metal ore types is becoming more relevant with the discovery, development and operation of many lower grade deposits around the world. The fluctuations in

    Sep 7, 2015

  • AUSIMM
    Integrated Mine Evaluation ù Implications for Mine Management

    By M Armstrong, S J. Coward, A Galli

    Mine management is often expected to make rapid evaluation decisions at different stages of projects based on limited and uncertain data. The challenge is exacerbated by having to distil technical com

    Jan 1, 2006

  • AUSIMM
    Real Time and In Situ Measurement of Elemental Composition Using Lasers

    Real Time and In Situ Measurement of Elemental Composition Using Lasers

    Sep 13, 2010

  • AUSIMM
    Flotation Plant Modelling and Simulation Using the Floatability Characterisation Test Rig (FCTR)

    Modelling and simulation are important aspects of flotation research, which may assist in the design of new circuits and the optimisation of existing ones. Flotation research in the AMIRA P9 project h

    Jan 1, 2000

  • AUSIMM
    The New Updraught Sinter Plant at Mount Isa Mines Limited

    As part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The

    Jan 1, 1968

  • AUSIMM
    The effect of high geo-temperature environment on spontaneous combustion – an experimental study

    By Y Xiao, C Lei, C Shu, W Wang, K Wang, J Deng

    To investigate the effect on coal spontaneous combustion with high geo-temperature, an experimental apparatus was developed to measure characteristic parameters of two kinds of coal samples at differe

    Aug 28, 2017

  • AUSIMM
    Safety at the Broken Hill Proprietary Steelworks

    By McLennan R. G

    The principle of personal safety is as old as the human race. The application of this principle to industry is of much more recent origin, and may be said to be almost exclusively the product of the t

    Jan 1, 1957

  • AUSIMM
    Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines Operation

    By T Howard, J E. Everett

    BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc

    Jan 1, 2002

  • AUSIMM
    Production Capacity Optimisation in the Presence of Grade Uncertainty

    Grade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation

    Dec 6, 2010

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008

  • AUSIMM
    Cyclone Process for Heavy Metals Decontamination of Sediments

    Cyclone Process for Heavy Metals Decontamination of Sediments

    Sep 13, 2010

  • AUSIMM
    A comparison of X-ray and electron-based analysis techniques for characterising the mineralogy and alumina distribution in iron ores

    By M I. Pownceby, C M. MacRae, A Torpy

    Electron probe microanalysis (EPMA) and quantitative X-ray diffraction (QXRD) techniques are capable of providing high-quality quantitative information regarding the phase mineralogy and distribution

    Jul 24, 2017

  • AUSIMM
    Flow of Compressed Air in Pipes

    COMPRESSED air is held in high esteem by the mining engineer as a medium for the transmission of power. The transmission, however, is accompanied by a high percentage of loss. Of the total work done b

    Jan 1, 1918

  • AUSIMM
    Accumulation of Trace Elements into Black Shale – How to Identify a Viable Source Rock for Orogenic and Carlin-style Gold Deposits

    By E Lounejeva, J A Halpin, A Chappaz, D D. Gregory, S Wu, T Lyons, P J. Sack, R R. Large, S W. Bull

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Newly published models suggest that some orogenic and Carlin-style gold deposits formed by

    Mar 18, 2015

  • AUSIMM
    Keeping the Lights On! High Risk Blasting at Boddington Gold Mine

    By D Rubery, C Croker

    The Boddington Gold Mine (BGM) is located 120 km south east of Perth, Western Australia. The operation is managed by Worsley Alumina Pty Ltd and mined by contractor Henry Walker Eltin (HWE). The mine

    Jan 1, 2002

  • AUSIMM
    Past and Future Parameters for Mining the Otago Alluvial Gold Deposits

    The early records of hydraulic elevator and bucket ladder dredging in the Clutha River system indicate the success of that era of alluvial gold mining in Otago. This paper briefly reviews parameters o

    Jan 1, 1992