Geotechnical Planning Basis for the Optimization of WorkingsBy Nikolaos Polysos
Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio
Jan 1, 2003
-
High Capacity Tensioned Cable Bolts For Tailgate SupportBy Stephen C. Tadolini
A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted
Jan 1, 2000
-
Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)By Sun Henghu
This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn
Jan 1, 1992
-
Application in Design for Close Proximity Multi-Seem MiningVirtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl
Jan 1, 1987
-
AMCMRR- An Analytical Model for Coal Mine Roof ReinforcementBy Mark G. Colwell, Russell Frith
"An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p
Jan 1, 2010
-
Proposed Criteria for Assessing Subsidence Damage to Surface StructuresBy Swapan Bhattacharya
Section 516 of Public Law (PL) 95-87, commonly known as the Surface Mining Control and Reclamation Act of 1977 (SMCRA), requires that underground coal mine operators must 'adopt measures consiste
Jan 1, 1984
-
Machine Design Parameters For High Seam Truss Bolting ApplicationsBy G. Bucelluni
An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar
Jan 1, 1982
-
Analysis of Panel Stability for Post-Mining Slurry InjectionBy Tim Ross
Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces
Jan 1, 1998
-
Stereological Sampling And Analysis For Characterizing Discontinuous Rock MassesBy J. K. Owens
As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I
Jan 1, 1994
-
Flexible Support Design For Gateroads Of Retreating Longwall PanelsBy Erdal Unal
In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y
Jan 1, 1993
-
Improved Design Of Coal Pillars For U.S. Mining ConditionsBy Z. T. Bieniawski
This paper presents the results of a survey of room and pillar dimensions and design practice in U.S. coal mines aimed at improving the design procedures in room and pillar mining. A review is given o
Jan 1, 1981
-
Seam Structure - An Important Criterion for Coal Pillar DesignBy Kot F. v. Unrug
In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m
Jan 1, 2005
-
SDPS Update: Easy Calculation of the Edge Effect Offset for Complex Extraction PanelsBy Joshua Hescock, Zach Agioutantis
"The Surface Deformation Prediction System (SDPS) has been developed as an engineering tool for the prediction of subsidence deformation indices through the implementation of an influence function. SD
Jan 1, 2017
-
An Analytical Approach For The Estimation Of Pillar StrengthA procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
Entry Stability Monitoring & Analysis For Longwall & Continuous Mining SystemsBy Wm. Mark Hart
Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa
Jan 1, 1995
-
A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element ModellingBy A. K. Bhattacharyya
The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar
Jan 1, 1992
-
New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)By Chris Mark
The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi
Jan 1, 2002
-
Numerical and Physical Modeling as Planning Tools for Rockbolted RoadwaysBy Peter Griesenbrock
In German underground coal mining mostly arch and some rectangular roadways are used in the development work. Due to its positive results from numerical and physical modeling techniques as well as goo
Jan 1, 2002
-
"Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"By Rusty Mchenry, Craig Dickerson, Robin L. Oldham
"It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl
Jan 1, 2015
-
Economic Impact of Ascending Mine?Waters in GermanyBy Axel Preusse
Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste
Jan 1, 2013