Review Of Pillar Design Equations Including The Effects Of ConstraintBy C. Babcock
This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships
Jan 1, 1981
-
The Effect Of Hazardous Geologic Structures On Gateroad StabilityBy Frank E. Chase
Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g
Jan 1, 1990
-
Inflatable Rock Bolt Bond Strength vs. Rock Mass Rating (RMR): A Comparative Analysis of Pull–Out Testing Data from Underground Mines in NevadaBy Chase K. Barnard, Rahul Thareja, Sean Warren, Rajagopala Kallu
"Inflatable rock bolts are commonly utilized for ground support in Nevada underground mines, however, there is limited information regarding what factors influence the bond strength of these bolts. Bo
Jan 1, 2015
-
A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery EntriesBy John C. Stankus
The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un
Jan 1, 2014
-
Progress in Managing the Geotechnical Aspects of Longwall Face RecoveryBy David Hill
"End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra
Jan 1, 2010
-
The Interaction of Unique Geology and Retreat Room?and?Pillar Mining on Overburden Barrier Performance at the Grove No. 1 MineBy Anthony T. Iannacchione
This study, funded by the Appalachian Research Initiative for Environmental Science (ARIES), examines how mine layout, mining method, and geology interacted to allow water from the Grove No.1 mine poo
Jan 1, 2013
-
The Study on the Overlying Strata Movement Features and Development Characters of the "three Zones" in Ultra-Thick Coal SeamsBy Xuexin Ding, Weijie Wei, Jinwang Zhang, Yi Chen, Shengli Yang
"Many ultra-thick coal seams exist in Xinjiang and the northern part of the Inner Mongolia. These coal seams are more than 30-40m thick. This kind of the thick coal seam is too difficult to extract in
Jan 1, 2016
-
Resupporting High Roof FallsBy Nicholas Chlumecky
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is
Jan 1, 1981
-
Ground Response to High Horizontal Stresses during Longwall Retreat and its Implication on Longwall Headgate SupportBy Peter Zhang, Daniel Su, Essie Esterhuizen, Mark Van Dyke, Berk Tulu, Dave Gearhart
"Roof falls in longwall headgate can occur when weak roof and high horizontal stress are present. To prevent roof falls in the headgate under high horizontal stress, it is important to understand the
Jan 1, 2018
-
Chemical Consolidation For Roadway Surrounding Rock - It's Theory And ApplicationsBy Jinhua Wang
Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con
Jan 1, 1996
-
A Linear Coal Pillar Strength Formula for South African CoalBy Nielen van der Merwe
The data base of failed pillar cases as used by Salamon and Munro (1967) in their original analysis to determine the strength of coal pillars empirically, has been updated for this study. It is shown
Jan 1, 2002
-
Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery OptimizationBy David P. Conover, Jake Bain, Christopher M. Ross
"Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining
Jan 1, 2017
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the OverburdenBy Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
Laboratory Testing of Rib StrapsBy E. Bane Kroeger
Rib failure is a hazard that has resulted in many injuries and fatalities in underground coal mines, especially in soft coal seams. Conventional rib control methods including rib boarding, shotcreting
Jan 1, 2004
-
Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)By André Vervoort
In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr
Jan 1, 1992
-
Multiseam Mining On South African CollieriesBy R. W. Hill
Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an
Jan 1, 1995
-
The Broken Rock Zone Around Tunnels And Its Support TheoryBy Fangting Dong
The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s
Jan 1, 1988
-
Ground Control Experiences in a High Horizontal Stress Field at Inland Steel Coal Mine NO. 2,By C. Thomas Blevins
This paper is intended to be a hands on experience account about ground control in a Southern Illinois coal mine. Its aim is to show how a combination of real world mining practices and constraints al
Jan 1, 1984
-
Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case StudyBy Huamin Li
Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi
Jan 1, 2000
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984