    Simulations of Full-scale Bench Blasts using FDM (Fracture Density Model)

    By Dale S. Preece

    A new three dimensional (3D) mechanistic model of fragmentation, called the Fracture Density Model (FDM) is used to simulate full-scale bench blasts at the Bararp dimensional stone quarry in Sweden. T

    Feb 1, 2020

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    A full-field solution to predict vibrations in the presence of a free surface

    By J. A. Sanchidrián, P. Segarra, S. Gómez

    Blasting is a common activity in mining that can cause significant damage in the remaining rock mass. The most commonly used method for predicting vibrations is the Swedish or Holmberg-Persson approac

    Jan 1, 2024

  • ISEE
    Blasting Improvements by Using Most Active Rock Variations on Blast

    By Alain Blanchier, Anne Charline Sauvage

    Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However

    Jan 1, 2004

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    Productive Partnership – Advanced Blasting Technology at Newlands Coal Mine

    By Les Willan, Chris Batten, Matt Sparkes

    In late 2008 Xstrata Newlands Coal Mine in Central Queensland and Orica Mining Services engaged in discussion to investigate methodologies to change their current mining practices and overcome the iss

    Jan 1, 2010

  • ISEE
    Effect of Presplit Perimeter Control in an Underground Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders

    Feb 6, 2023

  • ISEE
    Physics Based 3D Rock Blast Movement Modelling

    By THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds

    An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en

    Jan 26, 2026

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Considerations in Blasting Influence on Grindability

    By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta

    The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f

    Jan 1, 2015

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Numerical Study on Controlled Blasting by Pre-cracked Notch

    By Kwang-Yeom Kim, Dong-Gyou Kim, Hyo-Kwan Yoon

    This study was intended to simulate the blasting model using notched-hole with numerical approach. Numerical analysis approach was applied to compare and evaluate the blasting model using notched-hole

    Jan 1, 2010

  • ISEE
    Controlled Blasting in Natural Geotechnical Structures (cavities) at the Hierro Mine - Brazil

    By Sérgio Augusto Ferreira, Alan Gerson Diaz Butron, Carlos E. Arroyo, Marcus Neves, Jorhs Enrique Casimiro Huayhua, Dieggo Santos, Eventomar Junior

    The presence of natural underground cavities is normally a characteristic of iron ore deposits, specifically in tropical deposits. Brazil and the United States are the only countries that have a legis

    Feb 6, 2023

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    How Lightning Detection Has Influenced AMAX Coal's Delta Mine

    By Steve Kane

    Lightning is a very real problem in the surface mining industry. Today, as adverse market conditions continue to influence the surface coal industry, it has become necessary that all functions of the

    Jan 1, 1992

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer

    The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi

    Jan 1, 2010