Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Ground Improvement By Means Of Stabilising ColumnsBy Georg Breitsprecher
The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen
Jan 1, 2006
-
Piles In Expansive Soil For Large Tension Forces ? SynopsisBy G. W. Plant
This paper describes the design philosophy and construction details of piles between 25m and 32m deep to support 160m high and 110m base diameter cooling rowers for a major power station. It is sited
Jan 1, 2010
-
Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete ProcessBy E. W. Raabe
The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available
Jan 1, 1989
-
Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical InvestigationBy Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien
"Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th
Jan 1, 2016
-
Dewatering Tests for Underground Stations in RomeBy Antonio Zechini, Giuseppe Iorio, Massimo Grisolia
"The new C Line of the Rome Metro runs northwest to southeast across the city center, with 30 new stations and a total length of more than 15.5 mi (25 km). Due to the presence of a dense urban environ
Jan 1, 2017
-
Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky RiverfrontBy Theodore W. Vogelpohl
Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,
Jan 1, 2005
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep FoundationsBy Beim Jorge, Piscsalko George
"Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi
Jan 1, 2015
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Ground Freezing In Urban Areas And Under Special ConditionsBy Frank Haehnig
Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground
Jan 1, 2008
-
Drilled Pier Foundation In Hard Carbonate Rock ? SynopsisBy K. E. Darnell
Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type
Jan 1, 2010
-
Data Management Guide SpecificationBy Laurel E. Blackman
The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co
Jan 1, 2021
-
Ralston Dam Spillway Stability Over Pierre ShaleBy Gokhan Inci
Stability problems with dam spillways on existing landslides and appropriate mitigation measures to remedy them are ongoing concerns for geotechnical engineers. The first successful application of dri
Jan 1, 2007
-
Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile WallBy Takefumi Takuma, Ali Fayad, Shigeru Kambe
"This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W
Jan 1, 2017
-
Using Seismic Tomography To Evaluate Foundation StructuresBy Ed Kase
Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit
Jan 1, 2003
-
Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And PurposeBy Michael T. Lambert
The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete
Jan 1, 2000
-
Dynamic Load Testing Of Augered Cast-In-Place PilesBy Garland Likins
High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o
Jan 1, 2000
-
Improvement Of Bearing Capacity Of Bored Piles By Grouting MethodBy Andrzej Tejchman
A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham
Jan 1, 2002
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002