Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

    By Aaron Evans, Chu E. Ho, Tom Richards

    "This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet

    Jan 1, 2016

  • DFI
    Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building

    By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros

    "This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p

    Jan 1, 2016

  • DFI
    Sustainability Considerations in Deep Mixing Applications, With Examples from LPV 111 in New Orleans, LA

    By Craig M. Shillaber, Joseph E. Dove, James K. Mitchell

    "This paper addresses two primary factors affecting the sustainability of Deep Mixing Methods (DMMs): construction materials and handling of the spoil from wet mixing methods. We examine these factors

    Jan 1, 2015

  • DFI
    Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical Methods

    By Suresh Chikati, Gangadharan Santhanam

    Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap

    Sep 1, 2022

  • DFI
    Case Studies Demonstrating The Effectiveness Of Vibroreplacement Stone Columns In Variable Soil Types

    By Lee R. Buhagiar

    As a result of the increased seismic risk and the highly variable geology of Christchurch, finding costeffective foundation solutions has been a challenge for the Canterbury rebuild. The soil profile

    Nov 1, 2022

  • DFI
    Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico

    By Justin Simmons, Michael Arnold, Bob Faulhaber

    "In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms

    Jan 1, 2017

  • DFI
    Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station

    By Babak Mamaqani, Pirooz Barar

    Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th

    Jan 1, 2019

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • DFI
    Best Practices for Soil Mixing Near Sensitive Structures

    By Joseph A. Mann

    "Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom

    Jan 1, 2015

  • DFI
    An Alternative Lower Carbon Footprint Foundation For A Large Oil Gas Project In Jurong Island, Singapore

    By Selvaganesh Selvaraju, Deepak Raj, Sandun N. Wimalasena

    One of the world leading oil majors is carrying out a multi-billion-dollar expansion of its integrated manufacturing complex in Jurong Island, Singapore, the global oil trading and refining hub. Soil

    May 1, 2022

  • DFI
    Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.

    Jan 1, 2019

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • DFI
    The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability

    By Kim Chan, Bryn Thomas, Ben Dening

    "Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra

    Jan 1, 2015

  • DFI
    Innovative Micropile Retrofi t of an Existing Structure

    By Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman

    "Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example

    Jan 1, 2008

  • DFI
    Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with Piles

    By Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel

    The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r

    Sep 8, 2021

  • DFI
    Liquefaction Susceptibility Evaluation using Site-Specific Seismic Demands in the San Jose Area

    By Martin Walker, Joseph Ang, Jongwon Lee, Alvin Bayudanto, Lilian Lorincz, Morteza Khorshidi, Wenyong Rong

    This paper presents a case history of liquefaction susceptibility evaluation study for a major infrastructure project in the San José area. The subsurface material of the study area consists of Holoce

    Sep 8, 2021

  • DFI
    The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization

    By Anahita Modiriasari, Benjamin S. Rivers

    Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca

    Oct 1, 2022

  • DFI
    Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall

    By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney

    "Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly

    Jan 1, 2017

  • DFI
    Evaluation of Existing T-Z Models for Caliche Based on Numerical Analysis of Bi-Directional Load Tests Using NVShaft

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan, Joseph Toth

    The difficulty in material characterization and the erratic response of cemented soil layers, such as caliche in the Las Vegas valley, creates challenges for practicing engineers to reliably predict t

    Sep 8, 2021