Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-Constructions

    By Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm

    "Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment

    Jan 1, 2015

  • DFI
    Drilled Shaft Load Testing Program for Design of Foundations for an Automated People Mover

    By Samer Rabab’ah, John C. Niedzielski, Jason Valeria

    The PHX Sky Train is an automated people mover system located at Phoenix Sky Harbor International Airport. Phase II of the PHX Sky Train includes the design of over 150 drilled shafts for support of f

    Jan 1, 2019

  • DFI
    Underwater Pile Hammers

    By Douglas L. Scaggs

    Driving piles in under water applications has become more common place over the past twenty years. Where only a water depth reachable with a follower or dewatered cofferdam was the rule in the past,

    Jan 1, 2013

  • DFI
    Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention Systems

    By J. Erik Loehr, Andrew Z. Boeckmann

    "Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad

    Jan 1, 2016

  • DFI
    A Geotechnical Instrumentation Case Study

    By Mehih Demirkan, Kevin Tehansky

    Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat

    Apr 1, 2023

  • DFI
    Environmentally Friendly Geothermal Piles At Keble College, Oxford, UK

    By Tony P. Suckling

    This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct

    Jan 1, 2002

  • DFI
    A Case Study - Drilled Pier Foundations for a New Atlanta Stadium

    By Jean Wehbe, Daniel C. Brahana

    "This paper presents a case history of drilled pier construction for a new stadium in Atlanta, Georgia. The stadium structure is supported on several different foundation types, with the heaviest ""me

    Jan 1, 2017

  • DFI
    Unique Anchor Pile SOE System

    By Andrew Stauble

    This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg

    Aug 1, 2023

  • DFI
    Multiple Foundation Types For Bridges Over The Same Coal Mine

    By Kenneth M. Berrry

    A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b

    Jan 1, 2001

  • DFI
    New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable Soils

    By Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain

    "An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i

    Jan 1, 2015

  • DFI
    Pile Foundations for the San Francisco 49ers NFL Stadium

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7

    Jan 1, 2014

  • DFI
    Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore Structures

    By Chul Soo Park, Juhyung Lee, Duhyun Baek

    "In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl

    Jan 1, 2017

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    Installation Checklist For Driving Mega Piles

    By Douglas L. Scaggs

    Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry

    Jan 1, 2013

  • DFI
    Testing Foundations for Major Minnesota Bridges

    By Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo

    Jan 1, 2013

  • DFI
    Risk Management For Dam Rehabilitation Projects

    By Dave Paul

    Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule

  • DFI
    Foundations For Arsenal Emirates Stadium, London

    By Jim Cook

    Arsenal Football Club required the development of a new home stadium in north London, subsequently named the Emirates Stadium. The proposed development comprised a 60,000 seat stadium, with associated

    Jan 1, 2008

  • DFI
    Session 30 "Grouting for Tunnels 2"

    By Raymond Henn

    Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting

    Feb 10, 2003

  • DFI
    Critique of Specifications for Deep Mixing

    By George Filz, Peter R. Cali

    "Unnecessarily restrictive specifications could be limiting the cost effectiveness of deep mixing (DM) applications and therefore limiting use of DM on projects where there are other options. Excessiv

    Jan 1, 2015

  • DFI
    Retaining Structure for Berth at Krishnapatnam

    By P. V. Chandramohan

    "The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as

    Jan 1, 2015