Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The use of Geosynthetics in Underground Works

    By C. Yoo

    "Geosynthetics engineering has made phenomenal advances during the last decade in areas of manufacturing as well as practical applications. As a result, geosynthetics are now being recognized as essen

    Jan 1, 2015

  • CIM
    Investigating Froth Stability and Entrainment: A Comparative Study of Ionic Strength and Depressant Dosage

    By K. C. Corin, M. S. Manono, J. G. Wiese

    Depressants play a crucial role in the flotation of PGM bearing ores as they prevent naturally floatable gangue (NFG) from reporting to the concentrate. This action is regarded as critically important

    Jan 1, 2016

  • CIM
    Environmental Emissions Management at the La Caridad Copper Smelter

    By Matthew Russell, Bobby Randhawa, Leopoldo Mariscal Samaniego, Jose A. Puente, D. Brosig, Paykan Safe

    The La Caridad copper smelter, located in Nacozari, Mexico, have started a multi-year plan to reduce sulfur dioxide and particulate matter emissions into the environment. In 2014 the smelter completed

    Jan 1, 2019

  • CIM
    Is Bigger Still Better? Considerations in Increasing the Size Of Haulage Equipment

    By M. Dotto, T. G. Joseph, M. Curley

    "Equipment selection is a key decision in mine planning. Equipment size affects decisions from pit size to the total operation cost. Particularly when replacing haulage fleets for long-life surface mi

    Jan 1, 2019

  • CIM
    Valdez Creek Division

    "Cambior now holds a 49% interest in the Valdez Creek Placer, having acquired American Barrick's 23.125% interest in May 1990. At the same time, the company assumed the management of the operatio

    Jan 1, 1990

  • CIM
    Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick (a738daf4-2f2a-4901-b06d-657f347a1821)

    By Robin N. Adair

    The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotiterich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally continuous sheet

    Jan 1, 1992

  • CIM
    Chapter 9. Royalty Agreements

    By Karl J. C. Harries

    "9.1. INTRODUCTIONIn Chapter 5 of Volume I royalties are dealt with and several topics would appear to be duplicated in this Volume. However, Volume I may be looked upon as a general guide, whereas th

    Jan 1, 2003

  • CIM
    Estimation des débits de gaz dans les fours de durcissement de boulettes d'oxyde de fer

    By Claude Gosselin

    En 1995, la Compagnie minière Québec Cartier a mis de l'avant un projet de recherche sur la modélisation de l'écoulement des gaz pour ses fours de frittage à l'usine de bouletage de Por

    May 1, 2001

  • CIM
    Mining in Canada - HR Challenges and Opportunities

    Overview of Presentation ?About MiHR ?Human Resources Challenges in the Minerals and Metals Industry ?Getting the Facts -Sector Study Project ?Key Findings ?Recommendations ?Conclusions ?Mi

    May 1, 2006

  • CIM
    Experience with a new K40 System at PCS Mining, Lanigan Division

    By D. K. Storer, W. Lee, S. Tkach

    "A microcomputer-controlled multi-probe K-40 monitoring system was developed internally for the Phase II mill at the Lanigan potash mine. The K-40 probes were mounted in a variety of positions in seve

    Jan 1, 1990

  • CIM
    Gypsum in Manitoba*

    By BARRY BANNATYNE

    Gypsum in Manitoba is quarried from the Jurassic Amaranth Formation a1 Gypsumville and Harcus; it has been mined near Amaranth and Silver Plains. At Gypsumville, gypsum is carbonate- free but has thin

    Jan 1, 1984

  • CIM
    The Potential Application of Rock Engineering Systems to Rock Blasting

    By Patrick Andrieux

    Numerous rock blasting design methodologies have been developed over the years, relating either to the primary objectives of blasting, such as the size distribution of the blasted material, or to its

    May 1, 2002

  • CIM
    Deep-Seated Structurally Controlled Landslides of Corinth Gulf Rift Zone, Greece: The case of Panagopoula Landslide

    By S. Papanakli, Th. Rondoyanni, N. Sabatakakis, K. Kavoura, G. Tsiambaos

    "A representative composite fault-related landslide of the Corinth Gulf graben named “Panagopoula” is reported that considered to be one of the most prone to slope instability sites along the main mot

    Jan 1, 2015

  • CIM
    Temporal Observations of the Geochemistry and Mineralogy of a Sulfide-rich Mine-tailings Impoundment, Heath Steele Mines, New Brunswick

    By J. L. Jambor, E. J. Reardon, E. C. Appleyard, J. A. Cherry

    Since the 1957 initiation of deposition of mill tailings at the Heath Steele mine, New Brunswick, periodic detailed studies of the tailings geochemistry and mineralogy have been conducted, thereby pro

    Jan 1, 1992

  • CIM
    Geologic, Geochemical, and Geochronological Constraints on the Genesis of Gold Mineralization at Poplar Mountain, Western New Brunswick, Canada

    By G. Chi, W. J. Davis, S. Watters, D. Hoy, S. Castonguay

    "The Poplar Mountain gold occurrence in western New Brunswick is hosted in the Poplar Mountain volcanic complex (PMVC), which is located along the southern segment of the regional Woodstock fault zone

    Jan 1, 2008

  • CIM
    New Mechanism of Coal Mine Slope Failure

    By K. N. Karparov

    ?Two highwall failures in a South African coal mine defied analysis by widely accepted limit equilibrium methods. ?The geological conditions were complex, with undulating coal-bearing strata overlyin

    May 1, 2007

  • CIM
    The Murray Brook Deposit, Bathurst Camp, New Brunswick: Geologic Setting and Recent Developments (b495116d-42ae-4775-83a3-ba5e0028d55f)

    By M. P. Rennick, D. M. Burton

    The Murray Brook massive sulfide deposit, which was the first geochemical discovery in the Bathurst camp, is one of the largest sulfide deposits in the area. The massive sulfides are hosted by quartzo

    Jan 1, 1992

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    The Captain North Extension Zinc-Lead-8i1ver Deposit Bathurst District, New Bmnswick

    By K. D. A. Whaley

    The Captain North Extension deposit consists of five sulfide lenses hosted in cherty and chloritic metasediment that is bounded by quartz-eye rhyolite and laminated rhyolite. Lens 2 consists of sphale

    Jan 1, 1992

  • CIM
    THE SSW PROBE: a new high-tech tool to raise ore grades by reducing dilution within metal mines.

    By Pierre Gaucher

    It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob

    May 1, 2001