Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Meeting Today’s Challenge in Nickel Production: Reducing Operating Costs at Nickel Sulphide and Laterite Plants

    By A. E. M. Warner, A. Vahed, P. J. Mackey

    "Since early 2015, the price of nickel has dropped from the region of US$6/pound to current levels of around US$4.60/pound (March 2017), reflecting several market factors, but principally due to lower

    Jan 1, 2017

  • CIM
    Observations on the Impact of Furnace Dimensions and Power Density on Taphole Integrity

    By R. J. Hundermark, K. van der Merwe, L. R. Nelson

    Taphole integrity is critical to all furnaces, but it is especially important in high intensity electric furnaces processing matte and metal of high superheat. Key furnace dimensions are the electrod

    Jan 1, 2015

  • CIM
    Improving Sulphide Recoveries in Complex Gold Ore Bodies Using Cost Effective Pre-Concentration by Gravity

    By Yaw Boadi, Andrew McCallum, Sandy Gray, Yavuz Atasoy, Peter Wemyss

    "Various full-scale test programs and installations of the InLine Pressure Jig (IPJ) have provided evidence that pre-concentration of the difficult to leach sulphide mineral through gravity can provid

    Jan 1, 2004

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Terraflow: A Cost-effective Alternative Binderin Backfill Application

    By Ike Isagon

    Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme

    Nov 1, 2011

  • CIM
    Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall

    By H. Warren Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    May 1, 2002

  • CIM
    A Review of Gas Dispersion Studies in Flotation Plants

    By Jan E. Nesset, Julie Fournier, Jorge Torrealba, Colin Hardie

    "Gas dispersion studies have been used to benchmark and optimize plant flotation performance for more than a decade, although this technology is not as widely in use as it likely should be based on th

    Jan 1, 2015

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Content and Structure of a Plant Grinding Performance Management/Improvement System

    By K. Bartholomew

    The Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant processing performance impr

    Jan 1, 2015

  • CIM
    Comparison of Flotation Grade Dynamics Enabled By Real-Time Measurement

    By F. E. du Plessis

    "The distinction between data suitable for process control and data subject to aliasing only becomes quantifiable with the availability of rapid real-time measurements. Expecting the dynamics of flota

    Jan 1, 2012

  • CIM
    Simulating the Mine-Mill Interface

    By J. A. Meech, G. R. Baiden

    "A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru

    Jan 1, 1987

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • CIM
    Haldor Topsoe’s Catalytic Advances Result in Dramatically Lower So2 Emissions

    By Patrick Polk

    For many years, sulfuric acid producers all over the world have been forced to meet ever more strict environmental regulations to reduce SO2 emissions. The sulfuric acid industry has implemented new s

    Jan 1, 2014

  • CIM
    Characterising Ore Micro-Texture Using X-Ray Micro-Tomography

    By X. Yuan

    "The processing behaviours of ores such as their liberation characteristics in comminution and their response in separation processes are affected by their mineralogical characteristics. Key ore chara

    Jan 1, 2012

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    Enhanced Gravity Recovery of Base Metal and Industrial Minerals

    "Mineral separation by exploiting the differences in mineral or metal specific gravities (sg) has been used since antiquity. In the modern era, this is most commonly seen in the recovery of gold by t

    Jan 1, 2017

  • CIM
    Relationships with Aboriginal People: A Key Component to any Development

    By Kevin O?Callaghan

    Applying Legal Concepts - The Crown must consult, and where necessary accommodate, when: - Crown has knowledge, real or constructive, of the potential existence of Aboriginal rights or title and co

    May 1, 2010

  • CIM
    The Past 70 Years of Flash Smelting

    By M. Lahtinen, P. Latostenmaa, I. Kojo, E. Peuraniemi, M. Lindgren, S. Jyrkönen, M. Jåfs

    The year 2019 marks the 70th anniversary of Flash Smelting. The technology was operated on industrial scale for the first time at the Outokumpu Harjavalta copper smelter in Finland in 1949. Since then

    Jan 1, 2019

  • CIM
    Mining Operations and Slurry Pipelines Update and Future

    By R. A. Hill, J. D. Pitts

    "Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio

    Jan 1, 1978

  • CIM
    A technique for the direct measurement of bubble size distributions in industrial flotation cells

    By J. A. Finch

    "A method of sampling and presenting bubbles for imaging for use in full-size flotation cells is described. The device (bubble viewer) comprises a tube attached to a sealed glass viewing chamber. The

    Jan 1, 2002