Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Laboratory Investigations of Seismic Signatures of CO2 Saturation for Geological Sequestration

    By Gautier Njiekak

    The current study provides an experimental approach that aims at documenting the effects of different phases of CO2 (gas, liquid, supercritical fluid) on rock seismic responses. This has implications

    Jun 1, 2012

  • CIM
    Tile catenary idler as a means of energy absorption and spillage prevention

    By Douglas G. Jay

    "Transfer points on belt conveyors have long been a source of problems for both designers and users. Conveyors are generally given a low priority in new equipment layout, thus designers are often forc

    Jan 1, 1982

  • CIM
    Implementing integrated process information and control systems

    By J. G. Bensley, K. S. Detheridge

    "Many plants use computers for process control and most have computerized Management Information Systems but few have been able to have these systems interact with one another. Developing this system

    Jan 1, 1989

  • CIM
    Measurement of Anode Electrical Resistivity for Quality Control in Aluminium Industry

    By Y. Kocaefe, D. Bhattacharyay, D. Kocaefe

    The carbon anodes used in the electrolytic production of aluminum are made of petroleum coke, recycled anodes and butts, and coal tar pitch. Due to technological advances in the aluminum production te

    Jan 1, 2014

  • CIM
    A Precise And Accurate Method For Glue Determination In Copper Electrorefining

    By E. Rezaei

    Glue is an animal protein that is used with other organic agent such as thiourea, in copper electrorefining. The concentration of glue has to be controlled carefully, because the electro-deposition pr

    Jan 1, 2007

  • CIM
    Comprehensive Environmental Ore Deposit Models as an Aid for Sustainable Development

    By Y. T. John Kwong

    Abstract - To exploit an ore deposit without unduly impacting the environment is a challenge that can only be met by the concerted efforts of traditionally independent teams working on a mining projec

    Jan 1, 2003

  • CIM
    Toe buttressing procedure to stabilize slide zones for dragline stripping operations

    By Denni Nikols, Farrukh Z. Khan

    "Highvale Mine, located at Wabamun, Alberta, produces thermal coal for TransAIta's Keephills and Sundance generating plants. Overburden stripping in the mine is conducted by draglines which norma

    Jan 1, 1989

  • CIM
    Critique of Valuation Methods for Exploration Properties and Undeveloped Mineral Resources

    By Ian S. Thompson

    "Exploration properties form a continuum from grass roots to those with favourable geology, geochemical and/or geophysical anomalies, mineralization, showings (prospects), and finally to those with de

    Jan 1, 2003

  • CIM
    Overhead Protection Systems (OPS): Some Recent Applications

    By M. C. Walton, W. Roelofs

    ABSTRACT: In most cases, a refractory repair involves dealing with used refractory linings above shoulder height, defining these as overhead refractories. This paper details a method of personnel prot

    Jan 1, 2012

  • CIM
    Cost Control at Lamaque

    By W. Zieman

    "The low consumption of reagents can probably be attributed to a good clean type of ore. The cyanide level is kept at 0. 8 lb/ ton of solution and the lime at 1. 8 to 1.9 lb per ton of solution (pH 12

    Jan 1, 1964

  • CIM
    Overburden Mining Improvements at Suncor Energy?s Millennium Mine

    By Timothy D. Dreger

    In the spring of 2009, Suncor Energy Inc. technical personnel saw an opportunity to improve planning 0and mining of overburden material in order to address aggressive construction goals and increased

    May 1, 2011

  • CIM
    Equipment lifespan optimization

    By L. Chunpongtong

    Compared to equipment used in hard rock mines, the lifespan of equipment deployed in oil sands operations tends to be shortened due to the abrasive nature of the material and soft ground conditions in

    Jan 1, 2012

  • CIM
    The Impact of Flotation in Improving the Economics of Darrick's Buzwagi Project

    By B. K. Gorain

    Barrick' s Buzwagi copper-gold deposit in Tanzania comprises oxide, saprock and sulphide mineralized zones averaging approximately 0.058oz/t gold, 0.13% total copper and 0.03% cyanide-soluble cop

    Jan 1, 2007

  • CIM
    Working with geological complexity at Quintette Coal Limited's Mesa open pit

    By G. P. Gormley

    "Future open pit metallurgical coal mines in western Canada will be developed in complex geological environments. The success of these operations will be influenced by the mine operators' ability

    Jan 1, 1988

  • CIM
    Design of a multilayered thermal barrier coating structure for optimized thermal properties

    By Xiao Huang, Dongmei Wang, Prakash Patnaik

    Further increase in gas turbine engine temperature necessitates continuous development and advancement to thermal barrier coatings. While tremendous effort has been devoted to developing new thermal b

    Jan 1, 2004

  • CIM
    Laboratory simulation of a closed-circuit grind for a heterogeneous ore

    By J. A. Finch

    Samples of feed and product from a closed grinding circuit treating a heterogeneous lead-zinc ore were taken. The feed was subjected to laboratory batch grinding in a rod and ball mill with the object

    Jan 1, 1979

  • CIM
    The Development of Zr-Zn Alloy Compact Additions for Liquid Aluminum

    By K. Sun, S. A. Argyropoulos

    The assimilation and the exothermic behavior of Zn-Zr metallic powder compacts into molten aluminum was studied by measuring simultaneously the temperatures inside at the centerline of the compact, at

    Jan 1, 2008

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    The lighting evolution - A bright future for safety, efficiency and control

    By Bill Charbonneau

    Lumen, lm The measurement unit of light emitted by a light source 60W incandescent840 lumens 32W T8 linear fluorescent3200 lumens 54W T5HO linear fluorescent5000 lumens 400W metal halide24,000 lu

    Oct 1, 2010

  • CIM
    Heuristic Optimization of Scheduling Scenarios for Achieving Strategic Mine Planning Targets

    An optimization process is described that can be systematically applied by mine planners to produce life-of-mine schedules aligned with their strategic targets, while maximizing the net present value

    Aug 1, 2013