Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble Mills

    By John A. Herbst, Alexander Potapov, Xiangjun Qiu

    "High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB

    Jan 1, 2003

  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    Advanced Process Control for Grinding Circuits

    By E. Gallestey, D. Groenveld, F. Kolb, M. Rozou

    "Recent copper price evolution pushes modern mining industry even harder to achieve highest production with maximum efficiency. Operations are bound by numerous contractual and environmental condition

    Jan 1, 2015

  • CIM
    Sustainable Optimisation of the Bell Creek Sag Mill

    By T. Banerjee, D. Felsher, G. Leavoy

    "Lake Shore Gold is engaged in commercial gold production at both the Timmins West and Bell Creek mines, located in Timmins, Ontario. Run of mine ore is processed at the Bell Creek mill which consists

    Jan 1, 2015

  • CIM
    10 Years of History of Antamina's Sag Mill

    By Javier Linares García

    At then end of this year will be 10 years of producing concentrate for Antamina. This is a summary of what occurred over the last decade to increase production and tonnage above the design tonnage of

    Jan 1, 2012

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Fine tuning tax reform

    By Robert B. Parsons

    "The tax reform process marches on. The December 16, 1987 measures tabled by Finance Minister Michael Wilson represent one more step toward the objective of total reform of Canada's income and sa

    Jan 1, 1988

  • CIM
    The Winning of Clays and Shales

    By J. F. McMahon

    Introduction The greater portion of the information presented in this paper was obtained in the course of an investigation on clay gathering and its cost in the provinces of Quebec and Ontario (1). F

    Jan 1, 1933

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    Geological Setting of Volcanogenic Massive Sulphide Deposits and Active Hydrothermal Systems: Some Implications for Exploration

    By C. Jay Hodgson

    Hydrothermal systems form on land where and when an impermeable cap-rock unit ( either natural or self-sealed) , a permeable aquifer. and permeable discharge and recharge channels (cross-stratal perme

    Jan 1, 1977

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • CIM
    Using High Performance 2D Radar for Mine Equipment Automation and Obstacle Detection

    By Reik M. Winkel

    Radar Technologies are successful implemented in the military industry since decades and recently found their way in the mining industry as level gauge radars for bin applications. The latest generati

    Oct 1, 2009

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • CIM
    Assessing the Performance and Efficiency of Fine Grinding Technologies

    By Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux

    "The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp

    Jan 1, 2006