    Nature & Usefulness of Simulation as it Applies to Equipment Selection at an Open-Pit Mine

    By D. R. Jolley

    "The selection of equipment for open-pit mining is an important decision which results in a considerable capital expenditure by the operator. The decision is complicated by the wide product range on t

    Jan 1, 1970

  • CIM
    Nanisivik Mine - A Profitability Comparison of Actual Mining to the Expectations of the Feasibility Study

    By Neil R. Burns, Michael Doggett

    Abstract - The Nanisivik mine offers a unique opportunity to examine the economics of a mining scenario from its original feasibility study through to closure. In the early 1970s, the Strathcona Sound

    Jan 1, 2004

  • CIM
    Optimizing Performance in Heavy Equipment Teleoperation

    By Jean-François Lapointe

    Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi

    May 1, 2001

  • CIM
    "Re-Os Model Age Constraints on the Genesis of the Moss Molybdenite Pegmatite-ApliteDeposit, Southwestern Grenville Province, Quyon, Quebec, Canada"

    By Robert A. Creaser, David R. Lentz

    Abstract - The Moss molybdenite deposit, which was mined during both world wars, is hosted in late Grenvillian granitic pegmatite dikes. These dikes are locally aplitic, and intrude the late tectonic

    Jan 1, 2005

  • CIM
    GHG Emissions in the Mining, Metallurgy and Petroleum Sectors

    By Pierre Boileau

    Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min

    Nov 1, 2002

  • CIM
    Biological Preoxidation Leaching for Refractory Gold and Silver

    By R. W. Lawrence

    "Biological leaching can be used to enhance the recovery of gold and silver from refractory ores, concentrates and tailings. The method liberates precious metals associated with sulphide minerals such

    Jan 1, 1985

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane (ef6c9811-507f-4964-b191-8a798691efa4)

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • CIM
    Computer Control of Flotation Circuits at Frood Stobie Mill

    By G. Styles, K. Lye, R. Tenbergen, M. Mayhew

    Requirements to produce a higher bulk concentrate grade have necessitated extensive use of on-stream analyser data and computer programming to obtain the targets set for Frood Stobie Mill as required

    Jan 1, 1985

  • CIM
    Economical Benefits of Autogenous Grinding

    By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho

    "This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade

    Jan 1, 2000

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Using Rock Physics for Constructing Synthetic Sonic Logs

    By I. O. Ojala

    Detailed knowledge of velocity-depth trends is essential for constructing well-to seismic ties, determining background velocity and generating synthetic seismic traces for interpreting seismic amplitu

    May 1, 2009

  • CIM
    How Should Mining Companies Select the Optimal Portfolio of Production Projects Considering the Risk of their NPV

    By Júlio C. Lúcio

    Consider the case of a mining company with N investment opportunities in projects of different commodities. The problem is: since the company has limitation of capital, equipments, technical staffs, e

    May 1, 2009

  • CIM
    Limitations of Safety Arrest Mechanisms for Mine Shaft Conveyances

    By Gorzalczynski. Stan

    The recent trend in underground mine developments is ?big is better?. This is most certainly evident in the mine shaft and the conveyances that operate within its compartments. Today, there are severa

    May 1, 2002

  • CIM
    Vibro Energy Milling and its Application to Gold Recovery

    "This paper describes some of the methods and equipment used for fine milling of minerals, and gives particular attention to the Vibro Energy system.In addition, the paper describes a specific applica

    Jan 1, 1988

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Analyse Des Écoulements De L?eau En Conditions Non Saturées Dans Les Haldes À Stériles

    By Michel Aubertin

    Les haldes à stériles contenant des minéraux sulfureux réactifs constituent un milieu favorable à la production du drainage minier acide (DMA). Au sein de ces haldes, les processus physiques, géochimi

    Nov 1, 2002

  • CIM
    Development of Pasquia Hills Oil Shale Deposits

    By Baki Özüm

    Early evaluations of Pasquia Hills kerogen shale deposits by Geological Survey of Canada, Saskatchewan Geological Survey, Manitoba Energy and Mines and Sun Oil Company, using modified Fischer Assay, R

    May 1, 2002

  • CIM
    Applications for hard facing in the mining industry

    By A. A. Beland, R. J. Dawson, S. Shewchuk

    "Shovel buckets, scraper blades, dipper teeth, mine car wheels and hammermills are examples of equipment which require routine maintenance due to abrasion. Service life can be extended by the use 0/ha

    Jan 1, 1980

  • CIM
    Water Management in Hydraulic Fill Operations

    By M. Helinski

    In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,

    May 1, 2007