Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dynamic grade control modelling processes at the Waihi Underground Gold MineBy A Whaanga, W Vigor-Brown
IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T
Mar 22, 2022
-
Influence of Cognitive Biases on Project EvaluationBy S Love, M Anderson, M Boland
"The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co
Mar 8, 2016
-
On-Belt Analysis at Sepon Copper OperationBy T Arena
To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending
Aug 8, 2011
-
The Gassiness of Face Coal and the Occurrence of Gas Dynamic PhenomenaGas dynamic phenomena, particularly instantaneous outbursts of coal and gas are problems experienced in gassy, highly stressed coal, both usually the result of depth. Diff- erent mining geometries
Jan 1, 1986
-
General Safety Inductions for the Mining IndustryIn the past two and a half years, over 40 000 metalliferous mining and related services personnel have been trained through an Australian Generic Safety Induction system. This is almost half of Austra
Jan 1, 1999
-
Recovery of the northern mining block at Cliffs Nickel MineBy M Hopkins, A Mutale, A E. Vidal da Silva
The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block
Mar 15, 2021
-
Project Evaluation and Valuation – An Investor’s Golden RuleBy L I. Rozman
"There have always been development projects that fall short of expectations. In the last decade, we have seen more than the usual number of mining and oil/gas development projects taking significantl
Mar 8, 2016
-
Advanced Ventilation Control – An Analysis of Innovation and Environmental SustainabilityBy V S. Mutton, M J. Shearer
"The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G
Aug 31, 2015
-
Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western AustraliaBy M Fitzgerald
Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development
Aug 22, 2011
-
Automated Drilling Features for Improving Productivity and Reducing Costs in Underground DevelopmentBy J Välivaara
The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines
May 9, 2016
-
Integrated multi-disciplinary auditing and benchmarking of catastrophic hazards for underground mining operationsBy A R. Penney
Safety management, both personal and that associated with catastrophic hazard, helps to define the success of mining companies. Personal safety management, often categorised by slips, trips and falls,
Mar 29, 2023
-
Staurolite Product DevelopmentBy S Benson
Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is
Jan 1, 2001
-
Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the ResourceBy A M. Avis
This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain
Oct 5, 2011
-
Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin CoalmineBy A K. Ghosh
"Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an
Nov 15, 2016
-
Grinding Circuit Improvements at Evolution Mining’s Edna May OperationBy D Atheis, S Williams, A Dance, D Taplin
"Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant
Sep 1, 2014
-
Gold Room Procedure at Lake View and Star, Ltd.Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des
Jan 1, 1948
-
How Robust Are Your Asset Integrity Management Processes?By R Cannings, J Wallace, M McCamley
The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per
Jun 22, 2016
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle MillBy V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013
-
Extension of the Rosebery Mine by Decline Access Below 17 LevelAccess to the Rosebery Orebody, which dips into the western slopes of Mount Black at 45¦, has been achieved in sequence by the following means: - A series of adits down to 8 level - An inclined shaf
Jan 1, 1982