Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Soil Formation on Martha Hill Tailings - WaihiBy P E. H Gregg, R B. Stewart
Restoration trials established in 1985 included a treatment where pasture seed was sown directly into fertilised tailings. After seven years, accumulated soil data was used to compare physical and che
Jan 1, 1993
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
A Comparison of Massive Sulphide Deposits Forming at the PACMANUS (Manus Basin, PNG) and Jade (Okinawa Trough, South China Sea) Seafloor Hydrothermal FieldsBy R A. Binns, S Murao
The PACMANUS and Jade deposits are two active hydrothermal fields that are forming massive sulphide deposits at the Pacific rim margin. Both are associat
Jan 1, 1995
-
Best Practice Environmental Management - A Critical Strategy for the Future of the Mining IndustryThe role of government and the community has changed significantly over the last two decades in relation to environment protection, particularly in the mining sector. Increased community expectation
Jan 1, 1997
-
The history of mine ventilation in the United KingdomBy J R. Leeming
Mines require ventilation to ensure an adequate atmosphere for the sustenance of life, and to dilute, render harmless and remove contaminants.This paper describes the developments in the United Kingdo
Aug 28, 2017
-
Road Tunnel Protection by Water Mist Systems û Implementation of Full-Scale Fire Test Results into a Real ProjectTruck fires in a tunnel can create heat release rates (HRR) significantly higher than 100 MW. Because of a fast spread of smoke and heat the self-rescuing period is shortened significantly. Furthermor
Jan 1, 2008
-
Flotation Performance Improvement by Air Recovery Optimisation on Roughers and ScavengersFlotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers
Sep 13, 2010
-
-
The Wapolu gold deposit, Papua New Guinea: discovery to developmentGold mineralisation was first noted in 1983 at the Wapolu Point area of Fergusson Island, Papua New Guinea (PNG) during a follow-up regional reconnaissance program. Subsequent exploration programs thr
Jan 1, 1994
-
The Role of Mineral Processing in the Development of Cement with Low Carbon EmissionsThe Role of Mineral Processing in the Development of Cement with Low Carbon Emissions
Sep 13, 2010
-
A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine PlanningMine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a
Dec 6, 2010
-
Study on Mineral Processing Technology for a Refractory Iron OreStudy on Mineral Processing Technology for a Refractory Iron Ore
Sep 13, 2010
-
Use of Isanol in Production Blasting at ISA MineBy Bradford NL
The Isa Mine of Mount Isa Mines Limited produces 2.6 million tonnes of silver-lead-zinc ore annually from sub level open stopes of which approximately 40% comes from the narrow Racecourse orebodies be
Jan 1, 1985
-
Maximising Value Add from Collaborative ResearchThe mining industry continues to faces significant challenges due to increasing resource constraints (quality of ore bodies, water, energy, human resources) and increasing license to operate requireme
Sep 13, 2010
-
Equipment Selection - What is the Issue? What About the Application of Simulation Packages?The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t
Dec 6, 2010
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
Sustainable Integrated Management System æSIMSÆBy R Miller, D Hawcroft
The business environment is never still and there has been enormous change in demand, technology and opportunity during the last decade. In order to succeed it is necessary for organisations to change
Jan 1, 2000
-
Economic Impact Evaluation of Spoil Dump Reshaping Practices (Australia)By W C. Burton, J S. Kuszma, T O. Aspinall
The environmental impact of mining and evolving environmentallegislation has received increased attention worldwide in the last two decades (Bradfield, Shultz and Stone, 1996). The potential impacts a
Jan 1, 2000
-
The Occurrence of Telluride Minerals at Kalgoorlie (eadf2a80-f865-46a6-854c-a0a51fd161e0)Incidental to the progress of a geological survey of the Kalgoorlie goldfield during 1927 - 1928 a number of specimens of telluride minerals were obtained, chiefly with the help of Mr F G Brinsden, ge
Jan 1, 1994
-
Systematic Monitoring of Operation of Mining Companies and BranchesOne of the important directions of further increase of quality and efficiency of control of mining companies and branches is the creation of the operation and development monitoring systems of such fa
Dec 6, 2010