Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Soil Formation on Martha Hill Tailings - Waihi

    By P E. H Gregg, R B. Stewart

    Restoration trials established in 1985 included a treatment where pasture seed was sown directly into fertilised tailings. After seven years, accumulated soil data was used to compare physical and che

    Jan 1, 1993

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    A Comparison of Massive Sulphide Deposits Forming at the PACMANUS (Manus Basin, PNG) and Jade (Okinawa Trough, South China Sea) Seafloor Hydrothermal Fields

    By R A. Binns, S Murao

    The PACMANUS and Jade deposits are two active hydrothermal fields that are forming massive sulphide deposits at the Pacific rim margin. Both are associat

    Jan 1, 1995

  • AUSIMM
    Best Practice Environmental Management - A Critical Strategy for the Future of the Mining Industry

    The role of government and the community has changed significantly over the last two decades in relation to environment protection, particularly in the mining sector. Increased community expectation

    Jan 1, 1997

  • AUSIMM
    The history of mine ventilation in the United Kingdom

    By J R. Leeming

    Mines require ventilation to ensure an adequate atmosphere for the sustenance of life, and to dilute, render harmless and remove contaminants.This paper describes the developments in the United Kingdo

    Aug 28, 2017

  • AUSIMM
    Road Tunnel Protection by Water Mist Systems û Implementation of Full-Scale Fire Test Results into a Real Project

    Truck fires in a tunnel can create heat release rates (HRR) significantly higher than 100 MW. Because of a fast spread of smoke and heat the self-rescuing period is shortened significantly. Furthermor

    Jan 1, 2008

  • AUSIMM
    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Sep 13, 2010

  • AUSIMM
    Bioleaching of E-Wastes

    Bioleaching of E-Wastes

    Sep 13, 2010

  • AUSIMM
    The Wapolu gold deposit, Papua New Guinea: discovery to development

    Gold mineralisation was first noted in 1983 at the Wapolu Point area of Fergusson Island, Papua New Guinea (PNG) during a follow-up regional reconnaissance program. Subsequent exploration programs thr

    Jan 1, 1994

  • AUSIMM
    The Role of Mineral Processing in the Development of Cement with Low Carbon Emissions

    The Role of Mineral Processing in the Development of Cement with Low Carbon Emissions

    Sep 13, 2010

  • AUSIMM
    A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine Planning

    Mine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a

    Dec 6, 2010

  • AUSIMM
    Study on Mineral Processing Technology for a Refractory Iron Ore

    Study on Mineral Processing Technology for a Refractory Iron Ore

    Sep 13, 2010

  • AUSIMM
    Use of Isanol in Production Blasting at ISA Mine

    By Bradford NL

    The Isa Mine of Mount Isa Mines Limited produces 2.6 million tonnes of silver-lead-zinc ore annually from sub level open stopes of which approximately 40% comes from the narrow Racecourse orebodies be

    Jan 1, 1985

  • AUSIMM
    Maximising Value Add from Collaborative Research

    The mining industry continues to faces significant challenges due to increasing resource constraints (quality of ore bodies, water, energy, human resources) and increasing license to operate requireme

    Sep 13, 2010

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Sustainable Integrated Management System æSIMSÆ

    By R Miller, D Hawcroft

    The business environment is never still and there has been enormous change in demand, technology and opportunity during the last decade. In order to succeed it is necessary for organisations to change

    Jan 1, 2000

  • AUSIMM
    Economic Impact Evaluation of Spoil Dump Reshaping Practices (Australia)

    By W C. Burton, J S. Kuszma, T O. Aspinall

    The environmental impact of mining and evolving environmentallegislation has received increased attention worldwide in the last two decades (Bradfield, Shultz and Stone, 1996). The potential impacts a

    Jan 1, 2000

  • AUSIMM
    The Occurrence of Telluride Minerals at Kalgoorlie (eadf2a80-f865-46a6-854c-a0a51fd161e0)

    Incidental to the progress of a geological survey of the Kalgoorlie goldfield during 1927 - 1928 a number of specimens of telluride minerals were obtained, chiefly with the help of Mr F G Brinsden, ge

    Jan 1, 1994

  • AUSIMM
    Systematic Monitoring of Operation of Mining Companies and Branches

    One of the important directions of further increase of quality and efficiency of control of mining companies and branches is the creation of the operation and development monitoring systems of such fa

    Dec 6, 2010