  • DFI
    Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building

    By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi

    "The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States

    Jan 1, 2005

  • CIM
    Mining Methods and Practices at Lake Shore

    By Leslie S. Weldon

    THE Lake Shore mine has been developed by two vertical shafts, with level intervals at 200 feet to the 2200 level and at 125 feet below this horizon. A main cross-cut joins the two shafts on all level

    Jan 1, 1936

  • NIOSH
    RI 3561 Alunite Resources Of The United States ? Introduction (29994cf6-2f32-4a71-b35a-6001cf8bc70b)

    By J. R. Thoenen

    [Before 1914 Germany held virtual monopoly on the world supply of potash for fertilizer purposes. During the world War, potash shipments to the United States ceased, and recourse was had to domestic s

    Jan 1, 1941

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • NIOSH
    RI 9266 Structural Uses and Placement Techniques for Lightweight Concrete in Underground Mining

    By Eugene H. Skinner

    The U.S. Bureau of Mines conducted experiments on the use of lightweight concrete in the density range of 100 Ib/ft3 for liners in underground mines. Three test sections were completed: a monolithic,

    Jan 1, 1989

  • CIM
    Owl Creek Processing Summary

    By O. Matwijenko

    "1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with

    Jan 1, 1988

  • SME
    Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case Study

    By Y. Q. Zhang, S. S. Peng

    Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st

    Jan 1, 2004

  • AUSIMM
    Challenges of Developing Low-Grade Deposits in æNew WorldÆ Countries from a Mining ConsultantÆs Perspective

    By L Lorenzen, H Muller, L Bernard

    Australian companies and consultants are becoming ever more involved in projects in African, South American, East European and Middle Eastern countries. However, significant differences in culture and

    Sep 26, 2013

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • AUSIMM
    New Directions - Old Ideas Hydrocarbon Prospects of the Strzelecki Group Onshore Gippsland Basin

    By McNicol M. D

    Petroleum exploration in onshore Gippsland was directed in the 1950s and 1960s towards plays in the basal Latrobe and Strzelecki Groups, but these became forgotten in the 1970s with the Latrobe play

    Jan 1, 1992

  • AUSIMM
    The Market, the Mining Geologist and Booms and Busts

    After a five year period representing the strongest resource and commodity rally ever experienced, we are now faced with a subdued recovery following the global financial crisis. This renewed economic

    Jan 1, 2009

  • SAIMM
    Wet Shotcrete Trial

    By A. D. Storrie

    An underground wet shotcrete trial was completed last year to determine the effectiveness of wet shotcrete as an alternative support mechanism to dry shotcrete in the kimberlite environment. The wet s

    Jan 1, 2001

  • IOM3
    Photographic technique for the detection and monitoring of ground movements associated with mining and quarrying

    By P. Grainger, P. G. Kalaugher

    Paper presented at conference and first published in preprint volume of: Risk assessment in the extractive industries, held in University of Exeter, 23-24 March 1994. London: IMM, 1994. Large, unpredi

    Apr 1, 1996

  • SAIMM
    TBM cutting forces with particular reference to cutter and tunnel diameters

    By S. Okubo, K. Fukui

    Empirical equations established for estimating the rock strength of the working face based on the cutting forces of a tunnel boring machines (TBM) are further examined and discussed with respect to th

    Jan 1, 2003

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • CIM
    Achieving the Benefits of Information Technology in Surface and Underground Mining Processes

    By G. Lipsett, S. Dessureault

    Information technology (IT) initiatives in the past have tended to be sold on their ability to maximize resource output and return on capital by allowing assets to be used more effectively and efficie

    Jan 1, 2009

  • SME
    Industrial Minerals review 2017

    By Jack Bedder, Nils Backeberg

    "Native antimony metal is rare and antimony generally occurs together with gold, lead, copper and silver. There are more than 100 antimony minerals, although the sulfide mineral stibnite is the main e

    Jan 7, 2018

  • NIOSH
    IC 6964 Reconnaissance Of Mining Districts In Clark County, Nev. ? Introduction

    By William O. Vanderburg

    This paper 3/gives the results of a reconnaissance of mining districts in Clark County, Nev., made from November 18 to December 22, 1936, and from February 9 to March 8, 1937-in all, 63 days. While th

    Jan 1, 1937

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • NIOSH
    OFR-88-83 Proceedings Of A Workshop Cyanide From Mineral Processing - February 2-3, 1982 Salt Lake City, Utah ? Preface

    The workshop on "Cyanide Effluents from Mineral Processing' was held on February 2-3, 1982, at the U.S. Bureau of Mines, Salt Lake City Research Center, Salt Lake City, Utah. The workshop was spo

    Jan 1, 1983