Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
OFR-54-73 Evaluation Of Present Shotcrete Technology For Improved Coal Mine Ground ControlBy S. A. Bortz
This report presents the results of an extensive laboratory testing program to determine the physical properties of shotcrete including the use of fast-set agents, controlled set cements, and both wet
Jan 1, 1973
-
Caltrans Bridge Seismic Design/Retrofit Criteria ? SynopsisBy Brian Maroney
In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T
Jan 1, 1993
-
Extractive Metallurgy Division - Recent Changes in Electrolytic zinc Production at Risdon, TasmaniaBy J. H. Bain, D. C. Haigh, L. C. Parsons
Jan 1, 1964
-
Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, MalaysiaBy Vijayakumar Viramuthu, Martin Heinrich
Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T
May 1, 2022
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Thermal Modelling and Mitigation Measures for the Bogong Power DevelopmentBy D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
48. The Eureka Mining District, NevadaBy T. B. Nolan, R. N. Hunt
In terms of present metal prices, analysis of extant records of the Eureka district indicate past production of the magnitude of $200,000,000 in recovered silver, lead, and gold. Production to date ha
Jan 1, 1968
-
Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case studyBy M. Z. Emad, N. Abbas, Y. Majeed
Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov
Jun 5, 2023
-
Maximising Concentrate Revenues at the Xstrata Copper Kidd ConcentratorBy G. R. Morin, A. R. Leggett
"In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous
Jan 1, 2013
-
Les revêtements céramiques: procédés actuels et futurs développementsBy S. Dallaire
"RÉSUMÉLes revêtements céramiques ont une moins grande visibilité que les revêtements métallurgiques. Ils ont cependant jour un role significatif dans noire développement technologique. Les procédés d
Jan 1, 1990
-
The Golden Cross Project, Mill Closure, Mine Rehabilitation and Drainage ContractThe Golden Cross project was a joint venture between Coeur NZ Ltd (80 per cent) and Viking Mining Company (20 per cent). The site is located in the Waitekauri Valley, 8 km north-west of Waihi, on the
Jan 1, 2002
-
Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral ProcessingBy R. W. Lawrence
"In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc
Jan 1, 2007
-
Remediation Strategies for Acid Mine Drainage at Sullivan Mine, West Coast, New ZealandBy K Gordon, A Black
Two remediation strategies have been considered to reduce the levels of acidity and dissolved metals in acid mine drainage discharging from Sullivan Mine, West Coast, New Zealand. The oxidising strate
Jan 1, 2003
-
An Empirical Relationship For Trona Mine DesignBy William G. Fischer
This paper attempts to close the gap between extensive rock testing with field measurements and the mine operator's need for safe mine layouts and alternatives. It was found that many of the vari
Jan 1, 1984
-
Avaliação Da Resistência Mecânica A Compressão No CoqueBy Iara Patricia Vieira de Oliveira
O coque desempenha três principais funções no Alto-Forno sendo elas: física, térmica e química, em se tratando do papel físico, a função estrutural é de primordial importância, pois não pode ser assum
Oct 30, 2017
-
Towards Petrophysical Characterization of Comminution BehaviorBy Peter Fullagar, Adel Vatandoost, Steve Walters, Toni Kojovic
"Traditional comminution tests are a vital component in every mine plant design. Comminution behavior governs both the cost of equipment and its operating efficiency. Most comminution tests are conduc
Jan 1, 2009
-
Variations in regional geochemical patterns: effects of site selection and data-processing algorithmsBy J. D. Appleton, J. Ridgway, K. B. Greally
Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). The results suggest that meaningful geochemical maps can be
Jul 1, 1991
-
-
OFR-179(1)-84 Guidelines For Open Pit Ore Pass Design - Volume 1 - Final ReportBy D. F. Hambley
This report documents the work carried out by Engineers International, Inc. and its subcontructor, W. G. Pariseau, in order to develop a design manual for ore passes for open pit mines. The work inclu
Jan 1, 1983
-
Geochemical types of sulfide ore as indicators of mineral evolution at the hydrothermal vent field Jubileynoye (MAR)By Anna Sukhanova, Svetlana Babaeva, Sergey Andreev, Victor Beltenev
"The Zenith-Victoria /1/ and Jubileynoye /2/ hydrothermal fields have symmetrical structural position on the Mid Atlantic Ridge (Fig. 1). In order to compare the evolution of hydrothermal systems, we
Sep 1, 2014