Search Documents

  • SME
    The Effect of Particles on Surface Tension and Flotation Froth Stability Mining, Metallurgy and Exploration

    It is widely accepted that particles stabilise flotation froths and that stable froths result in improved flotation performance. Predicting the effect of particle addition on froth stability is, howev

  • AUSIMM
    Several Approaches to Enhance the Bioleaching of Enargite

    Several Approaches to Enhance the Bioleaching of Enargite Some approaches were investigated to enhance the recovery of Cu from enargite by bioleaching with Acidithiobacillus ferrooxidans using the ga

    Sep 13, 2010

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • NIOSH
    OFR-94-77 Study Of A Water Jet Continuous Coal Mining System

    By P. J. G. du Toit

    Coal has been mined by hydraulic means in various countries, i.e., the hydraulic excavation as well as the hydraulic transportation of coal has been practiced. The hydraulic breaking (excavating) of t

    Jan 1, 1977

  • NIOSH
    RI 3816 Effects of Boron in Steel

    By A. J. Williams, R. B. Corbett

    "INTRODUCTION This investigation was undertaken to obtain information concerning the effects of boron in steel and its method of addition, so that boron, which is readily obtainable domestically, may

    Jun 1, 1945

  • SME
    Fluorspar – trends and changes in production and use

    By Lawrence Pelham

    Introduction Fluorspar demand or consumption has been taken for granted in recent years, except for those that produce, market, or consume the commodity. Thinking used to be that as the steel and alu

    Jan 11, 1986

  • AIME
    Annual Meeting, Washington, D. C., February 1882

    LOCAL COMMITTEE OF ARRANGEMENTS. Major J. W. Powell, Chairman; F. P. Dewey. Secretary; S. F. Emmons, A. S. Hewitt, J. P- Hilgard, Charles Knap, and F. W. Taylor. THE opening session was held in

    Jan 1, 1882

  • SME
    Numerical Investigation of the Effect of a Novel Wet Scrubber on Dust Reduction in an Underground Coal Mine Mining, Metallurgy and Exploration (330345b3-631c-4721-bb65-792de9742b60)

    By Thomas Novak, Sampurna Arya

    Controlling dust generation and keeping it below permissible limits to meet federal dust standards at the working face of a roomand-pillar coal mine is a challenge for a mine operator. With the recent

  • SME
    Leaching Process and Mechanism of Weathered Crust Elution-Deposited Rare Earth Ore Mining, Metallurgy and Exploration

    By Zhigao Xu, Ming Wu, Jun Qu, Rong Zhang, Wenrui Nie, Ruan Chi, Zhenyue Zhang, Zhengyan He

    The leaching processes and mechanisms of weathered crust elution-deposited rare earth (RE) ores with ammonium sulfate were investigated for their high efficiency and low consumption exploitation. The

  • SME
    Leaching Process and Mechanism of Weathered Crust Elution-Deposited Rare Earth Ore Mining, Metallurgy and Exploration (a7b06571-a8d3-42ef-a017-d7b434b4427d)

    By Zhigao Xu, Ming Wu, Jun Qu, Rong Zhang, Wenrui Nie, Ruan Chi, Zhenyue Zhang, Zhengyan He

    The leaching processes and mechanisms of weathered crust elution-deposited rare earth (RE) ores with ammonium sulfate were investigated for their high efficiency and low consumption exploitation. The

  • CIM
    Quality Control Improvements in Bessemer Matte Production at the Vale Copper Cliff Smelter

    By M. Zanini, D. Wong

    ABSTRACT: Metals market improvements in 2005 drove the desire to increase nickel throughput and the production of nickel oxide sinter at the Vale Ltd. Copper Cliff smelter. Significant difficulties we

    Jan 1, 2012

  • SME
    Portable instruments for measuring tailpipe diesel particulate in underground mines

    By J. Noll

    There is a need for direct tailpipe sampling of diesel vehicles in mines in order to determine the effects of an emissions-based maintenance program, evaluate control technologies such as diesel parti

    Oct 1, 2013

  • AUSIMM
    Pillar Barricades at Broken Hill South Limited, Broken Hill, N.S.W.

    This paper describes the methods of constructing timber barricades against pillars of ore in the South Mine, property of Broken Hill South Limited, Broken Hill, N.S.W., and discusses the behaviour of

    Jan 1, 1946

  • SAIMM
    Hybrid finite-/discrete-element modelling of progressive failure in massive rock slopes

    By H. Willenberg, J. S. Coggan

    ABSTRACT: Although individually both continuum and discontinuum numerical analyses provide useful means to analyze rock slope stability problems, complex failures typically involve mechanisms related

    Jan 1, 2003

  • NIOSH
    OFR-164-82 Engineering Evaluation Of Radon Daughter Removal Techniques

    By Donald B. Lindsay

    This report presents the findings of an investigation into the characteristics of a number of techniques for cleaning ambient air with special emphasis on their applicability to the removal of the sho

    Jan 1, 1978

  • AIME
    Minerals Beneficiation - Tumbling Mill Power at Cataracting Speeds (Mining Engineering, May 1960, pg 488)

    By P. K. Guerrero, N. Arbiter

    The correlation of power consumed by a tumbling mill with the dimensions, speed, and load has been attempted by three principal methods. One of these, the torque formula, has been reviewed critically

    Jan 1, 1961

  • NIOSH
    RI 8448 Experiments in Hot-Rolling and Forging of Ductile Cast Iron

    By L. A. Neumeier

    The Bureau of Mines investigated hot-rolling and forging characteristics of experimental ductile iron castings, both sand and permanent-mold, made with charges containing up to 70 pct foundry pig iron

    Jan 1, 1980

  • NIOSH
    RI 6996 Fracturing A Deposit With Nuclear Explosives And Recovering Copper By The In-Situ Leaching Method

    By William R. Hardwick

    Present information indicates that a copper deposit can be safely fractured with a nuclear explosive and the copper successfully recovered by the in-situ leaching method. The process is not yet at the

    Jan 1, 1967

  • NIOSH
    The Proton Nuclear Magnetic Resonance Spectra Of Pyridines

    By F. R. McDonald

    The proton NMR spectra of 32 pyridines in two solvents, carbon tetrachloride and benzene-d6, are presented. The chemical-shift and differential-shift values are correlated with the substitutent positi

    Jan 1, 1971

  • DFI
    Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine

    By James W. Weaver

    The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea

    Jan 1, 2011