Search Documents

  • AIME
    Metal Prices

    By FREDERICW K. BRADLE

    I HAVE been puzzled by two lines of thought'; one emanating from Washington, D. C., to the effect that we must all cheer up, that in a very short time, measured in terms of months, prices would b

    Jan 1, 1930

  • SME
    Decision Tools For Integrating Sustainability Into Planning And Feasibility Phases Of Projects For Extractive Sector Enterprises ? Introduction

    By A. Ramage

    Since late 2010, CH2M HILL has been working with a confidential client who holds a long-term commitment to sustainable development (SD). The commitment is aligned with all three elements of the triple

    Jan 1, 2012

  • DFI
    Dynamic Testing For Bored Pile Bearing Capacity - Summary

    By Jörn M. Seitz

    Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use

    Jan 1, 1987

  • SME
    Prospectors and Developers Meeting – Some Reflections

    By Bruce Gellar

    In March, the Prospectors and Developers Association of Canada (PDAC) held its annual conference in Toronto, Ontario. This is the third PDAC meeting the author has attended. The following are some

    Jan 1, 1999

  • NIOSH
    Mineral Indicators - Cobalt:

    According to reports in August, Botswana RST's copper- nickel-cobalt smelter at Selebi-Pikwe produced 7 percent above the rated capacity of about 3,500 metric tons of matte per month. This record

    Jan 1, 1976

  • AUSIMM
    Determination of Relative Economic Values of Mill Returns

    IN concentrating mills, where several millerals are recovered for realisation in more than one product, various systems are used to express the relative economic value of the work done, and, in the ho

    Jan 1, 1931

  • SME
    Industrial Minerals 2004 – Pumice and Pumicite

    By G. C. Presley

    Estimated domestic production of pumice and pumicite in 2004 increased about 23 percent since 2003, according to the U. S. Geological Survey (USGS). The USGS estimate of domestic production of 687 kt

    Jan 1, 2005

  • SME
    Pumice and Pumicite – A Review of 1992 Activities

    By Gordon C. ‘Bud’ Presley

    The pumice and pumicite review arrived too late for the June issue. Estimated domestic production of pumice and pumicite in 1992 was up compared with 1991, according to US Bureau of Mines statistic

    Jan 1, 1993

  • AUSIMM
    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    Sep 13, 2010

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • CIM
    Geological Setting, Petrology, and Geochemistry of Granitic Pegmatites and Leucogranites Hosting U-Th-REE Mineralization at Fraser Lakes Zone B, Wollaston Domain, Northern Saskatchewan, Canada

    By Kevin M. Ansdell, Irvine R. Annesley, Christine L. Mckechnie

    The U-Th-REE mineralization at Fraser Lakes Zone B is hosted by granitic pegmatites and leucogranites, which lie along the deformed contact between Paleoproterozoic metasedimentary gneiss of the Wolla

    Jan 1, 2013

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • NIOSH
    IC 7038 Gold Mining And Milling In Idaho County, Idaho - Introduction

    By S. H. Lorain

    This paper, which describes lode gold mining in Idaho county, Idaho, is one of a series on western mining districts being published by the Bureau of Mines. It describes mining and milling practices, g

    Jan 1, 1938

  • SME
    Polysulfides As An Alternative Green Gold Leaching Technology - Preprint 09-103

    By D. Earley

    High metal prices and new world trade standards and accounting for environmental liability in financial disclosures are creating markets for metals commodities that are produced using ?green technolog

    Jan 1, 2009

  • SAIMM
    Support / Aide Et Soutien

    If you have problems or questions relating to the installation of this disc, please either telephone Document Transformation Technologies at (+27 12) 667 2074, or e-mail: nigel@doctech.co.za Si

    Jan 1, 2004

  • SAIMM
    Reflections on destress blasting for deep level hardrock mining: Key considerations for successful application of the techniques

    By C. Yi, M. Onifade, B. Genc, S. Dineva, T. Zvarivadza, M. Khandelwal

    Deep hardrock mines worldwide increasingly face rockbursts as mining depths increase. These events result from the accumulation and sudden release of stress, causing rockmass damage and posing major s

    Jun 27, 2025

  • NIOSH
    RI 3402 Flow Characteristics, Composition, And Some Liquid-Phase Properties Of Hydrocarbon Fluids From A "Combination" Well ? Introduction (d90839d9-b952-4ca0-a039-5c82fb5b564c)

    By C. K. Eilerts

    Knowledge of the phase relations of the fluids that exist in the porous spaces of rocks constituting natural petroleum reservoirs and of the behavior of these fluids under various field conditions of

    Jan 1, 1938

  • NIOSH
    OFR-56-75 Early Warning System Of Impending Rock Failure For Safety In Mines And Excavations

    By A. L. Podia

    The purpose of this research was to develop a system capable of detecting changes in the structure of rocks, leading to failure of mine roofs, and/or excavations. A prototype system was developed,

    Jan 1, 1973

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996