Search Documents

  • AUSIMM
    Paringa Clean-up Practice

    The purpose of this paper is to describe briefly the clean-up procedure adopted at the treatment plant of Paringa Mining & Exploration Co. Ltd. at Kalgoorlie, Western Australia.A clean-up is carri

    Jan 1, 1941

  • AIME
    A Peculiar Type Of Intercrystalline Brittleness Of Copper

    By Henry Rawdon

    THE following note describing the behavior of copper under rather unusual conditions is offered here for its suggestiveness rather than as a complete study of the question. The examinations described

    Jan 2, 1920

  • TMS
    EDXRF Analysis Of Alloys And Corrosion Products Of Metallic Pre-Hispanic Pieces Of The Museum Of Ethnology And Archaeology Of The University Of Sao Paulo

    By A. C. Neiva

    An energy-dispersive x-ray fluorescence spectrometer was assembled with the aim of analysing alloys and corrosion products of artistic, ethnological and archaeological pieces. The spectrometer is semi

    Jan 1, 2006

  • NIOSH
    RI 7148 Beryllium Resources Of Idaho, Washington, Montana, And Oregon

    By Eldon C. Pattee

    Reconnaisance samples of reported beryllium occurrences in Idaho, Washington, Montana, and Oregon were chemically and spectroscopically tested in a mobile laboratory. The two predominant types of occu

    Jan 1, 1968

  • AIME
    Minerals Beneficiation - Recent Developments in Pebble Milling

    By B. S. Crocker

    Pebble grinding was used at Lake Shore Mines in 1949. A full description of experimental evidence and test plant results was published in 1952 1 and further operating details in 1954 2.' In more

    Jan 1, 1960

  • NIOSH
    Reduction Of Air Pollutants From Gas Burner Flames - Including Related Reaction Kinetics

    By Margaret E. Harris

    The formation of nitrogen oxides, the decay of carbon monoxide, and the concentrations of residual hydrocarbons in the secondary combustion zones of propane-air and methane-air flames were studied in

    Jan 1, 1970

  • CIM
    Steel From Uranium?

    By Mike Dry, Rod Dry

    If humanity is truly serious about reducing emissions of carbon dioxide into the atmosphere, today’s power plants burning fossil fuels will have to be replaced by power plants that do not emit CO₂. Un

    Jan 1, 2020

  • CIM
    Erosion/Corrosion Effects on the Design and Maintenance of a Potash Refinery

    By J. Davis, M. G. Reading

    "INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t

    Jan 1, 1983

  • NIOSH
    OFR-131-83 Safety And Health In Underground Mine Waste Disposal

    By J. P. Schmid

    Results of a comprehensive investigation of the impact of underground mine waste disposal on the health and safety of miners are presented. Information was gathered through an extensive search of Amer

    Jan 1, 1982

  • NIOSH
    IC 6875 Sand And Gravel Excavation: Part 5: Motor-Truck Haulage, Conveyor-Belt Haulage, Pumps And Pipe Lines, Barges And Towboats, Aerial Trams - Introduction

    By J. R. Thoenen

    This circular is part 5 of the third paper (entitled "Excavation") of a series summarizing the technical problems involved in the production and preparation of sand and gravel. Part 1 discussed the us

    Jan 1, 1936

  • NIOSH
    Occurrence And Determination Of Germanium In Coal Ash From Powerplants ? Summary

    By R. C. Corey

    GERMANIUM is an element that has come into widespread use in the electronics industry in recent, years. So far this increasing demand has been, met by ample supply: however, the future balance is unce

    Jan 1, 1959

  • AUSIMM
    Flotation of Fine Coal from Bulli, Greta and Victoria Tunnel Seams

    Factors of importance in the ntilization of coal fines are mentioned, and the results of flotation tests on coal fines from three important coal seams in New South Wales are presented.INTRODUCTIONEcon

    Jan 1, 1961

  • CIM
    Emergency Plan Methodology for Mine Fire Simulations in Chuquicamata Underground Mine

    By J. E. Carrasco, J. D. Stinnette, R. A. Alvarez

    "Chuquicamata Underground Mine is one of the main projects for the Chilean government copper company (CODELCO). Underground mine project has been under construction since 2013 and presents a solution

    Jan 1, 2019

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • NIOSH
    RI 9075 - Arch Canopy Design Procedure for Rehabilitation of High-Roof-Fall Areas

    By Richard A. Allwes

    This Bureau of Mines report presents a procedure for the design of an arch canopy for use in rehabilitating a high-roof-fall area. Only dy-namic line loading of an unbackfilled arch canopy at its crow

    Jan 1, 1987

  • ISEE
    Overburden Blast Cast Designs, Economics and Case Histories

    By Conny Postupack

    The first principle one usually learns about blasting is that competence in this field is best gained by experience in making blasts rather than by reading a book or by listening to a lecture. The rea

    Jan 1, 1991

  • AIME
  • SAIMM
    Wind Erosion Of Tailings Dams And Mitigation Of The Dust Nuisance

    By G. E. Blight

    Wind erosion can be a major cause of the loss and dispersion of tailings material from a tailings dam into its surrounding environment. Such dust dispersion can be a serious nuisance, as well as a hea

    Jan 1, 2007

  • AIME
    New York Paper - Austenite and Austenitic Steels

    By John A. Mathews

    It is a great honor to be asked by the Board of Directors of this Institute to deliver the Henry Marion Howe lecture. The invitation carries with it a great responsibility, which I accept with conside

    Jan 1, 1925

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002