Search Documents

  • SME
    An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement Suspensions

    By Christian Wawrzyniak

    An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol

  • DFI
    Settelement Of A Piled-Raft Foundation Considering Lateral Pile Resistance

    By Helen S. W. Chow

    The use of piled raft foundations for tall buildings has been increasing in this decade as it is an economical alternative to conventional piled foundations. Piled rafts are composite structures compr

    Jan 1, 2006

  • AUSIMM
    Recovery of Precious Metals from Chloride Solution by Magnetite

    Recovery of Precious Metals from Chloride Solution by Magnetite The development of environmental-friendly lixiviants as alternatives to cyanide and the increasing recycling activities to recover prec

    Sep 13, 2010

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • ISEE
    EUExcert a European Initiative for Improved Explosive Competence

    By Roberto Folchi, Hans Wallin, Mara Battocchio

    An understanding of explosives science and technology, and the competence to harness it is central to maintaining Explosives capability, national security, and in sustaining a competitive industry. A

    Jan 1, 2013

  • SAIMM
    Outotec Direct Leaching Application In China

    Outotec?s direct leaching process is an atmospheric leaching process for sulphidic zinc concentrates. The direct leaching process, based on special leaching reactors developed by Outokumpu, is the mos

    Jan 1, 2008

  • AUSIMM
    Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,

    By Met B. E

    During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in

    Jan 1, 1937

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • NIOSH
    OFR-108-81 Development Of A Portable Gas Analyzer For In-Mine Personnel Monitoring

    By Edward A. McClatchie

    A novel nondispersive electro-optical gas analyzer has been designed, fabricated and tested. The instrument is based on a pressure modulated absorption technique. Key features of this new gas analy

    Jan 1, 1980

  • NIOSH
    OFR-47(1)-80 Interpretation Of Rock Mechanics Data - Vol. I (A Two-Dimensional Finite Element Approach To The Evaluation Of Underground Coal Mine Stability)

    By W. G. Pariseau

    A two-dimensional finite element program has been modified and extended to account for some of the rock mechanics complexities associated with single entry development of longwall coal mine panels. Pr

    Jan 1, 1978

  • SAIMM
    The Impact Of Entrained Air And Enhanced Flow Measurements At Eland Platinum Concentrator

    By C. V. O?Keefe

    Volumetric flow and mass flow are two of the critical process parameters needed to understand and control flotation processes, with others being levels, densities, and metal analyses. Both volumetric

    Jan 1, 2012

  • NIOSH
    IC 8846 Pumped-Slurry Backfilling Of Abandoned Coal Mine Workings For Subsidence Control At Rock Springs, Wyo. - With An Appen On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, U.S. Bureau Of Reclamation, Denver. Colo.

    By G. J. Colaizzi

    The Bureau of Mines, at the request of local authorities in Rock Springs, Wyo., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling

    Jan 1, 1980

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • SME-ICGCM
    Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

    By Gennaro G. Marino

    Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this

    Jan 1, 1988

  • NIOSH
    IC 8119 Bureau Of Mines Research And Technologic Work On Coal, 1960 ? Introduction

    This report is the 25th in a series summarizing Bureau of Mines research and technologic work on coal and related investigations, and the 7th of these reports to be issued on a calendar-year basis.3 I

    Jan 1, 1962

  • NIOSH
    RI 7288 Chemical Stabilization Of The Uranium Tailings At Tuba City, Ariz.

    By Richard Havens

    Acidic and basic uranium leach plant residues located on the Navajo Indian Reservation, Tuba City, Ariz., were successfully stabilized against wind erosion using a relatively low-cost chemical method.

    Jan 1, 1969

  • SAIMM
    Characterisation of cellular lightweight concrete and timber stope supports

    By P. N. Erasmus, M. Heyns, M. J. Pretorius

    The characteristic of stope supports plays a vital role in the design of the supports. This paper deals with the characterisation of both cellular lightweight concrete and timber supports since both

    Jan 1, 2003

  • SME
    Characteristic Effects Of Contained Nuclear Explosions For Evaluation Of Mining Applications

    By Charles R. Boardman

    Recent underground nuclear tests in tuff, alluvium, salt, and granite have yielded data essential to the evaluation of mining applications of contained nuclear detonations. The data indicate that for

    Jan 1, 1964

  • SME
    TBM Data Management And Quality Assurance For The Brightwater Conveyance Project

    By Jeffrey Mitsopoulos

    King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which

  • NIOSH
    Geomechanics Of Large Stone Structures: A Case History From The Washington National Cathedral

    By R. Mark, R. Richards

    The Washington National Cathedral is one of the largest masonry structures in the USA, and like many of its European Gothic counterparts, it required nearly a century to construct. The design was alt