Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement SuspensionsBy Christian Wawrzyniak
An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol
-
Settelement Of A Piled-Raft Foundation Considering Lateral Pile ResistanceBy Helen S. W. Chow
The use of piled raft foundations for tall buildings has been increasing in this decade as it is an economical alternative to conventional piled foundations. Piled rafts are composite structures compr
Jan 1, 2006
-
Recovery of Precious Metals from Chloride Solution by MagnetiteRecovery of Precious Metals from Chloride Solution by Magnetite The development of environmental-friendly lixiviants as alternatives to cyanide and the increasing recycling activities to recover prec
Sep 13, 2010
-
Dynamic Pile Testing In Soils Exhibiting Set-Up - IntroductionBy Juan M. Antorena
A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio
Jan 1, 1995
-
EUExcert a European Initiative for Improved Explosive CompetenceBy Roberto Folchi, Hans Wallin, Mara Battocchio
An understanding of explosives science and technology, and the competence to harness it is central to maintaining Explosives capability, national security, and in sustaining a competitive industry. A
Jan 1, 2013
-
Outotec Direct Leaching Application In ChinaOutotec?s direct leaching process is an atmospheric leaching process for sulphidic zinc concentrates. The direct leaching process, based on special leaching reactors developed by Outokumpu, is the mos
Jan 1, 2008
-
Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,By Met B. E
During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in
Jan 1, 1937
-
Cave Propagation and Open Pit Interaction at the Ernest Henry MineBy E Ah Mu and C R Lilley, A D. Campbell
Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC
May 9, 2016
-
OFR-108-81 Development Of A Portable Gas Analyzer For In-Mine Personnel MonitoringBy Edward A. McClatchie
A novel nondispersive electro-optical gas analyzer has been designed, fabricated and tested. The instrument is based on a pressure modulated absorption technique. Key features of this new gas analy
Jan 1, 1980
-
OFR-47(1)-80 Interpretation Of Rock Mechanics Data - Vol. I (A Two-Dimensional Finite Element Approach To The Evaluation Of Underground Coal Mine Stability)By W. G. Pariseau
A two-dimensional finite element program has been modified and extended to account for some of the rock mechanics complexities associated with single entry development of longwall coal mine panels. Pr
Jan 1, 1978
-
The Impact Of Entrained Air And Enhanced Flow Measurements At Eland Platinum ConcentratorBy C. V. O?Keefe
Volumetric flow and mass flow are two of the critical process parameters needed to understand and control flotation processes, with others being levels, densities, and metal analyses. Both volumetric
Jan 1, 2012
-
IC 8846 Pumped-Slurry Backfilling Of Abandoned Coal Mine Workings For Subsidence Control At Rock Springs, Wyo. - With An Appen On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, U.S. Bureau Of Reclamation, Denver. Colo.By G. J. Colaizzi
The Bureau of Mines, at the request of local authorities in Rock Springs, Wyo., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling
Jan 1, 1980
-
Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding CircuitBy M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud
"In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp
Jan 1, 2017
-
Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence DataBy Gennaro G. Marino
Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this
Jan 1, 1988
-
IC 8119 Bureau Of Mines Research And Technologic Work On Coal, 1960 ? IntroductionThis report is the 25th in a series summarizing Bureau of Mines research and technologic work on coal and related investigations, and the 7th of these reports to be issued on a calendar-year basis.3 I
Jan 1, 1962
-
RI 7288 Chemical Stabilization Of The Uranium Tailings At Tuba City, Ariz.By Richard Havens
Acidic and basic uranium leach plant residues located on the Navajo Indian Reservation, Tuba City, Ariz., were successfully stabilized against wind erosion using a relatively low-cost chemical method.
Jan 1, 1969
-
Characterisation of cellular lightweight concrete and timber stope supportsBy P. N. Erasmus, M. Heyns, M. J. Pretorius
The characteristic of stope supports plays a vital role in the design of the supports. This paper deals with the characterisation of both cellular lightweight concrete and timber supports since both
Jan 1, 2003
-
Characteristic Effects Of Contained Nuclear Explosions For Evaluation Of Mining ApplicationsBy Charles R. Boardman
Recent underground nuclear tests in tuff, alluvium, salt, and granite have yielded data essential to the evaluation of mining applications of contained nuclear detonations. The data indicate that for
Jan 1, 1964
-
TBM Data Management And Quality Assurance For The Brightwater Conveyance ProjectBy Jeffrey Mitsopoulos
King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which
-
Geomechanics Of Large Stone Structures: A Case History From The Washington National CathedralBy R. Mark, R. Richards
The Washington National Cathedral is one of the largest masonry structures in the USA, and like many of its European Gothic counterparts, it required nearly a century to construct. The design was alt