Search Documents

  • SAIMM
    Gravity Circuit Optimisation Via Mathematical Modelling By Particle Size Classes

    By Ishwinder Grewal, Michael Fullam

    Many factors affect the overall performance of a gravity circuit beyond that of the primary gravity recovery device. It is critical to examine the gravity circuit in its entirety in order to determin

    Jan 1, 2006

  • TMS
    Fundamental Investigation Of Basic Mechanisms Of Carbon Dissolution In Molten Iron (Invited)

    Based on experimental and computer simulation results from our group, we report a systematic, atomic level analysis of carbon dissolution from carbonaceous materials in molten iron. Experimental resul

    Jan 1, 2003

  • SME-ICGCM
    Mine Stability Mapping

    By Collin L. Stewart

    The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design

    Jan 1, 2006

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • NIOSH
    RI 8351 Evaluation of Selected Spinels and Perovskites as Candidate High-Temperature Molybdenum Coatings

    By Max L. Glenn

    As part of its goal to minimize requirements for mineral commodities through conservation and substitution, the Bureau of Mines conducted research to develop molybdenum as a potential substitute for s

    Jan 1, 1979

  • CIM
    Blast simulation surface and underground with the SABREX model

    By G. K. Jorgenson, S. H. Chung

    "IntroductionThe SABREX Blast Modelling Program was developed jointly by the companies of the ICI Explosives Group, of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with E

    Jan 1, 1987

  • SME
    Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel Project

    By B. Caro Vargas

    The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • AUSIMM
    Hydrothermal Activity, Vent Fauna and Submarine Gold Mineralization at Alkaline Fore-Arc Seamounts near Lihir Island, Papua New Guinea

    By M D. Hannington

    On the southern flank ofLihir Island, a group of three volcanic cones were discovered at water depths from 1000 - 1500 m. The volcanoes are located in a narrow zone of recent seismic activity and elev

    Jan 1, 1995

  • AUSIMM
    ‘Intelligent Mining’ – the Way of the Future

    By F N. Baez

    This paper supplements a keynote address prepared for the MassMin 2016 conference on mass underground mining methods, including block, panel, inclined and sublevel caving. It advocates for a new cave

    May 9, 2016

  • AIME
    Part IV – April 1968 - Papers - Permeability of Tungsten to Nitrogen from 1800° to 2600°C

    By R. E. Fryxell, E. C. Duderstadt, P. K. Conn

    Permeation rates for nitrogen through are-cast tungsten were measured in the temperature range 1800° to 2600°C at nitrogen pressure differentials of 1.0 and 0.1 atm. Gas chromatography was used to me

    Jan 1, 1969

  • SME
    Frothing Properties of Amine/Frother Combinations Mining, Metallurgy and Exploration

    By James A. Finch, Xiang Zhou, Yue Hua Tan

    Methods to determine frother functions, control of bubble size and froth properties, are now widely used. Some collectors also exhibit frother functions which are less understood. Using a water-air sy

  • AUSIMM
    Presidential Address, 1968: The Standards We Inherit

    At last year's. annual meeting of The Institute, Sir George Fisher, as President, compared it somewhat nostalgically with a meeting of its kind in the 1920s when comment was expressed on the decl

    Jan 1, 1968

  • NIOSH
    A Case Study in Applied Social Marketing: Developing an Occupational Safety and Health Product

    By Douglas F. Scott

    This case study provides an example of how social marketing was applied to meet the needs of business customers. Federal regulations require that all companies develop a written program to track hazar

    Jan 1, 2009

  • AIME
    Iron and Steel Division - Rate and Mechanism of the Sulfur Transfer Reaction

    By S. Ramachandran, N. J. Grant, T. B. King

    MANY investigations of the rate of the sulfur transfer reaction between carbon-saturated iron and blast furnace type slags have been made." It is evident that the reaction is complex, the rate being a

    Jan 1, 1957

  • SME
    Leaching Behavior of Lithium from Bauxite Residue Using Acetic Acid Mining, Metallurgy and Exploration (1c2dd284-40d8-467a-9f57-cf193eac1926)

    By Ning Wang, Tengfei Guo, Wanyan Li, Hanjie Wen, Hannian Gu, Zehai Li

    Bauxite residue (red mud) is an alkaline waste derived from the industrial process for extraction of alumina from bauxite ore. Some bauxite residues contain considerable concentrations of critical met

  • AIME
    Reservoir Engineering – Laboratory Research - The Effect of Temperature on the Permeability Ratio of Different Fluid Pairs in Two-Phase Systems

    By L. B. Davidson

    The petroleum literature contains many reports on the relative permeability properties of porous media. However, only recently have studies of relative permeability at elevated temperatures been made.

    Jan 1, 1970

  • CIM
    Design Considerations for Modern Shaft Linings

    By Witold J. S. Ostrowski

    The shaft structure being part of an underground mine, depends on programned functional duties, and on geological and hydrological conditions. The majority of Canadian metal mine shafts are in hard co

    Jan 1, 1973

  • SAIMM
    Rock avalanche run out prediction: combined application of two numerical methods

    By R. Poisel, C. Scavia, Preh A., W. Roth, M. Pirulli

    ABSTRACT: Two methodologies for the three-dimensional simulation of the run out of rock avalanches are presented: one based on a granular approach and the other based on a continuum equivalent approac

    Jan 1, 2003

  • AUSIMM
    Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?

    When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h

    Jan 1, 2005

  • AUSIMM
    The Preparation and Properties of Cemented Carbides

    Much interesting data on cemented carbides has been published over a period of years which, when classified and pieced together, gives a clear picture of this special branch of powder metallurgy. This

    Jan 1, 1942